You are on page 1of 2

1 2 3 4 5 6 7

NOTES:

1. SYSTEM CODE IS SGA EXCEPT WHERE INDICATED.

2. ALL SYSTEM COMPONENTS ARE SERIES 30SGANNFFXXX UNLESS NOTED OTHERWISE.


FIRE PUMPS
BUILDING ROOF
3. MISCELLANEOUS PIPING AND INSTRUMENTATION CONNECTION PIPING SIZE ARE AS
FOLLOWS, EXCEPT AS INDICATED.
VENT AND TEST CONNECTIONS 25 MM (THREADED)
S DRAIN CONNECTIONS 50 MM (THREADED)
PRESSURE CONNECTIONS
PI
PRESSURE INDICATORS 25 MM (THREADED)
30SGA22CP503 S PRESSURE TRANSMITTERS 25 MM (THREADED)
LI

30SGA22CL502 4. MISCELLANEOUS BRANCHES FROM THE MAIN PIPING WILL HAVE THE SAME SYSTEM CODE
AND BRANCH IDENTIFIER AS THE MAIN PIPING AS FOLLOWS, UNLESS NOTED OTHERWISE.
VENTS, DRAINS AND PIPING SSSXXBR2XX
LS INSTRUMENT PIPING SSSXXBR3XX

NJECTOR
30SGA22CL501 WHERE SSXXX IS THE SYSTEM CODE AND BRANCH IDENTIFIER OF THE MAIN PIPING.

5. THE SYSTEM OPERATING AND DESIGN PRESSURES ARE 1,180 KPAG AND 1,280 KPAG

I
A RESPECTIVELY, AND THE SYSTEM OPERATING AND DESIGN TEMPERATURES ARE 36°C A
AND 45°C RESPECTIVELY.

30SGA22
DIESEL FIRE PUMP ENGINE 6. PIPING MATERIAL SPECIFICATION CAN BE REFERRED FROM DOC. NO.
30SGA22AP001 BR001 TBL/30/W/U-----BV01/FD/003.
FIRE RING MAIN
250
0004 30SGA-M2665B
PURCHASE 62.0805 11CB2F 7. LOOP DIAGRAM CAN BE REFERRED FROM DWG. NO. TBL/30/E/SGA---BV54/BD/001.

TP-BF-FP-020
8. POWER PLANT INSTRUMENTATION CONCEPT CAN BE REFERRED FROM DOC. NO.
1.50 METER
MC (BV) 62.0805 TBL/31/E/003b---012/GS/091.
30SGA22
DIESEL FIRE PUMP
FUEL TANK AA007
9. SYSTEM DESCRIPTION CAN BE REFERRED FROM DOC. NO. TBL/30/E/SGA---BV54/DM/001.
B
30SGA22BB001 30SGA30GH002

S
TEST 10. CONTROL INTERFACE PRINCIPLE CAN BE REFERRED FROM DOC. NO. TBL/31/E/CB----EN80/DO/002.
DIESEL ENGINE
DRIVEN FIRE PUMP DR
CONTROLLER 11. PIPING AND INSTRUMENT DIAGRAM LEGEND CAN BE REFERRED FROM
DR
DWG. NO. TBL/30/W/U-----BV01/FD/002.
PI
30SGA12
AA501 30SGA22CP502 TP-BF-FP-019
PI 30SGA22 12. HIGH POINT VENTS AND LOW POINT DRAINS WILL BE PROVIDED AS TECHNICALLY REQUIRED.
VT TP-BF-FP-014 30SGA22CP501 62.0805 MC (BV)
AA901
30SGA12

30SGA22
BR201

11CB2F

MC (BV) 62.0805 30SGA22


25

30SGA22 AA702
30SGA12 AA003 LO
SERVICE/FIRE 30SGA12 AA701
BR001

WF
WATER TANK B LO
B AA001 350 B
0003 30GHA-M2663A 30SGA22
LO 11CB2F 30SGA22 DIESEL ENGINE DRIVEN 30SGA22 AA006

LC
30SGA12

11CB2F
BR202

FIRE PUMP
AA001 AA004
50

30SGA14
30SGA22AP001 (1 x 100%)
AA501
30SGA23 FIRE PUMPS BUILDING

LO
568 M3/HR @ 10.8 BAR
VT DR TP-BF-FP-016 AA001 (DIESEL FIRE PUMP ROOM) Space for Stamp:
IP/OE
30SGA14

11CB2F
BR201

MC (BV) 62.0805
30SGA12 RETURN CODE
25

30SGA14 AA502
SERVICE/FIRE
WATER TANK A BR001

11CB2F
250 FT

30SGA23
BR201
30GHA-M2663A 0001
11CB2F 30SGA22CF501

50
30SGA14

11CB2F

A
BR202
50

DR

DR 30SGA14 30SGA23
AA502
AA501

30SGA23
Revision History

11CB2F
BR001
250
30SGA15 Rev. Revision Date Created by Checked by Approved by Brief of Description
AA501
VT TP-BF-FP-017
30SGA22 5 09/DEC/21 TPG JNE YPK REVISED PER ECN-N-M-0038
30SGA15

11CB2F
BR201

MC (BV) 62.0805
AA008 4 30/SEP/19 PPT PTN YPK REVISED PER ECN-N-M-0020
25

30SGA15 30SGA23
C SERVICE/FIRE C
BR001 BR002 3 24/JUL/19 PPT PTN YPK ISSUED FOR CONSTRUCTION - APPV IN CODE A
WATER TANK A
250 65 2 20/JUN/19 PPT PTN YPK ISSUED FOR CONSTRUCTION - APPV IN CODE B
30GHA-M2663A 0002
11CB2F DIESEL FIRE PUMP SKID 11CB2F
1 29/APR/19 PPT PTN YPK REVISED PER ECN-N-M-0008

30SGA13 0 12/MAR/19 PPT PTN YPK ISSUED FOR CONSTRUCTION - APPV IN CODE B
LO

30SGA15
SERVICE/FIRE AA001 PURCHASE 62.0805
Description of Current Revision: FOR CONSTRUCTION
WATER TANK B BR002
250 Owner:
11CB2F

30GHA-M2663A 0003 30SGA13 1.50 METER


11CB2F
30SGA15

BR201
BR202

50 PI
50

30SGA23

LO
11CB2F 30SGA21CP502 AA002
ELECTRIC MOTOR
LC

DR
DRIVEN FIRE PUMP TEST TEST
CONTROLLER 30SGA21
30SGA22
30SGA15 30SGA21
30SGA22 30SGA21
30SGA30GH001 AA006
AA502 AA702 DR DR BR001
LO FIRE RING MAIN
DR 250
0005 30SGA-M2665B
30SGA13 11CB2F
AA501 30SGA21
30SGA22 Owner's Engineer:
30SGA13

11CB2F
BR001

AA003
350

30SGA11
AA501 30SGA21AP001 62.0805 MC (BV)
PI
VT TP-BF-FP-015 30SGA21CP501 ELECTRIC MOTOR DRIVEN TP-BF-FP-018
D 30SGA21
30SGA22 D

LO
30SGA11

11CB2F

FIRE PUMP
BR201

MC (BV) 62.0805 AA011


30SGA21
30SGA22
25

(1 x 100%) Contractor:
30SGA11
SERVICE/FIRE 30SGA11 AA701
568 M3/HR @ 10.8 BAR
WATER TANK A BR001 1.50 METER
AA001
350 LO
0002 30GHA-M2663A
11CB2F
LO
30SGA11

30SGA21
30SGA22
11CB2F
BR202

AA001
ALL BACKCIRCLED
50

PRESSURE
MAINTENANCE TEST TEST
PUMP CONTROLLER Project

DR 30SGA21
30SGA22 PI B B 30SGA30GH003
LO

DR DR

30SGA11
AA007 30SGA21CP504
CHANGES PER TAMBAK LOROK COMBINED CYCLE
AA502
30SGA21
30SGA22
POWER PLANT BLOCK 3 PROJECT

PI
AA704
ECN N-M-0038 WITH NET DEPENDABLE CAPACITY OF 600-850 MW.
SEMARANG - CENTRAL JAVA
30SGA21CP503
30SGA21
30SGA22
ReleasedforConstruction-setbyMarubeniCorporationon13-Dec-21

864

Subject:
30SGA21
30SGA22 AA009

APPROVED FOR
9.

AA703 PIPING AND INSTRUMENT DIAGRAM


11.

SITE FIRE PROTECTION


D v8.

E CONSTRUCTION Issued Purpose:


FOR CONSTRUCTION
Responsible Dept:
MECHANICAL
E
antPI
ze

THE DISTRIBUTION AND USE OF THE NATIVE FORMAT CAD


lSi

FILE OF THIS DRAWING IS UNCONTROLLED. THE USER Originator:


OpenPl
Ful

30SGA21AP002 SHALL VERIFY TRACEABILITY OF THIS DRAWING TO THE


11

B LATEST CONTROLLED VERSION.


=
1:

PRESSURE MAINTENANCE
PM

(JOCKEY) PUMP
AM

(1 x 100%)
24

Originator Document No: Originator Rev:


::
1

6 M3/HR @ 11.5 BAR


55

196541-30SGA-M2665A 5
:
1900
a

ELECTRIC FIRE PUMP SKID


1

Project Document no: Rev: Sheet:


45969-

00
/2
/2 2
2

TBL/30/E/SGA---BV54/FD/001 5 1/2
09
/0
col

22
1/
A1
2
1 2 3 4 5 6 7

30SGA31
30SGA31

BR301
PT VT UTILITY AND FIRE WATER PUMP/ NOTES: 4. MISCELLANEOUS BRANCHES FROM THE MAIN PIPING WILL HAVE

30SGA31
25
AA501

11CB2F
30SGA31 30SGA31 30SGA31

BR201
11CB2F 30SGA31CP001 ULTRA PURE WATER THE SAME SYSTEM CODE AND BRANCH IDENTIFIER AS THE
30SGA31

25
BR013 BR001 BR001 & AIR COMP SHELTER/ 1. SYSTEM CODE IS SGA EXCEPT WHERE INDICATED.
30SGA31 MAIN PIPING AS FOLLOWS, UNLESS NOTED OTHERWISE.
150 250 250 AA701 30SGA31 2. ALL SYSTEM COMPONENTS ARE SERIES 30SGANNFFXXX UNLESS NOTED OTHERWISE.
BR002 H2 STORAGE VENTS, DRAINS AND PIPING SSSXXBR2XX
AA002 3. MISCELLANEOUS PIPING AND INSTRUMENTATION CONNECTION PIPING SIZE ARE AS
11CB2F 150 INSTRUMENT PIPING SSSXXBR3XX
11CB2F LO 30SGA31 FOLLOWS, EXCEPT AS INDICATED.

30SGA31

11CB2F
30SGA32 30SGA31 WHERE SSSXX IS THE SYSTEM CODE AND BRANCH IDENTIFIER

BR216
30SGA31 AA003 VENT AND TEST CONNECTIONS 25 MM (THREADED)
30SGA31 AA501 11CB2F LO OF THE MAIN PIPING.

11CB2F
BR203

50
30SGA31
AA030 AA001 DRAIN CONNECTIONS 50 MM (THREADED)

30SGA32
50 AA504

11CB2F

30SGA31
VT

BR011

30SGA32
30SGA22 PRESSURE CONNECTIONS

BR202
30SGA31

11CB2F
5. THE SYSTEM OPERATING AND DESIGN PRESSURES ARE 1,180 KPAG

150

BR201
BR215
30SGA31

11CB2F
11CB2F

50
30SGA31 DR AA501 VT PRESSURE INDICATORS 25 MM (THREADED)

25
AND 1,280 KPAG RESPECTIVELY AND THE SYSTEM OPERATING AND

BR001

30SGA31
50
30SGA21

11CB2F
250

BR204
AA031 DR 30SGA31 PRESSURE TRANSMITTERS 25 MM (THREADED) DESIGN TEMPERATURES ARE 36°C AND 45°C RESPECTIVELY.
30SGA31 AA501 VT

25
30SGA22
30SGA32
30SGA31 AA502

BR201
11CB2F
BR211
AA516

11CB2F
WAREHOUSE & WORKSHOP/ VT 30SGA31 DR 30SGA31

25
BR001 6. PIPING MATERIAL SPECIFICATION CAN BE REFERRED FROM

30SGA21
50
AA503

BR201
ELECTRO-CHLORINATION BLDG/ AA004

11CB2F
DR 250 DOC. NO. TBL/30/W/U-----BV01/FD/003.

25
11CB2F
CW PUMP STATION

30SGA32
30SGA31 TP-BF-FP-004

BR202
11CB2F LO 7. LOOP DIAGRAM CAN BE REFERRED FROM

50
AA515 30SGA32

30SGA32
DR VT

30SGA32
MC (BV) 62.0805 DWG. NO. TBL/30/E/SGA---BV54/BD/001.

BR003
AA506

BR206

11CB2F
200
11CB2F
25
30SGA32

30SGA32
11CB2F

30SGA32

11CB2F
30SGA32
BR013

BR001
8. POWER PLANT INSTRUMENTATION CONCEPT CAN BE
DR 30SGA32
150

AA511

80
AA502 MC (BV) REFERRED FROM DOC. NO. TBL/31/E/003b---012/GS/091.

001
BR015
30SGA32

013
MC (BV)

11CB2F
30SGA21

30SGA22

FP-
11CB2F

30SGA31

30SGA31
200

BR001

BR001

11CB2F

11CB2F
BR003
BR014
BR207 9. SYSTEM DESCRIPTION CAN BE REFERRED

FP-

250

250

150

150
BF-
A DR 50 11CB2F A
FROM DOC. NO. TBL/30/E/SGA---BV54/DM/001.

BF-

TP-
012

MC (BV)

30SGA31

11CB2F
11CB2F

TP-
62.0805

BR012
FP-

10. CONTROL INTERFACE PRINCIPLE CAN BE REFERRED

150
62.0805

30SGA31
30SGA32 FROM DOC. NO. TBL/31/E/CB----EN80/DO/002.

002
BF-

BR001
MC (BV)

250
30SGA31 AA507 30SGA31

FP-
TP-

LO LO LCE (CABLE ROOM UNDERFLOOR)


AA032 AA005 11. PIPING AND INSTRUMENT DIAGRAM LEGEND CAN BE

BF-
M 2665A

M 2665A
62.0805
REFERRED FROM DWG. NO. TBL/30/W/U-----BV01/FD/002.

C M OTOR
30SGA31

NE
30SGA31 30SGA31

TP-
BR001
250

RE PUM P

RE PUM P
ESELENGI
30SGA31 AA033 AA006
LO 62.0805 12. HIGH POINT VENTS AND LOW POINT DRAINS
AA028

30SGA-

30SGA-
ADMIN BLDG/ ADMIN BLDG/ WILL BE PROVIDED AS TECHNICALLY REQUIRED.

ELECTRI
FG ELECTRICAL EDG/

FI

FI
& CONTROL ROOM/ FUEL GAS COMP STATION/

DI
TP-BF-FP-005

WF
H2 STORAGE TRANSFORMERS

0005

0004
30SGA31

200 SYSTEM
MC (BV) 62.0805

WF
AA029

RW AY 1

RW AY 2

WF
WAREHOUSE & WORKSHOP/
30SGA32
CHEMICAL & LUBE OIL SHELTER/ WATER & WASTEWATER
WF

TREATMENT BUILDING BR005

STAI

STAI

FM -
ELECTRO-CHLORINATION BLDG
(TREATMENT AREA) H2, N2 & CO2 GAS BOTTLE 200
STORAGE BUILDING
(H2 ROOM)

11CB2F
30SGA31 30SGA31
TP-BF-FP-007

30SGA32
ADMINISTRATION, ELECTRICAL LO

BR203
ELECTRO-CHLORINATION BUILDING BR001 AA007
& CONTROL BUILDING

50
(OPERATING AREA) 62.0805 MC (BV) 250

B 11CB2F B
TP-BF-FP-011
STAIRWAY 2 STANDPIPE DR GAS RECEIVING STATION UNIT
30SGA32

11CB2F
30SGA31
62.0805 MC (BV)

BR205
AA504

11CB2F
30SGA32

30SGA32

50
30SGA32
30SGA32
BR002

11CB2F

BR006
AA503

BR204
VT

100
WF 30SGA32 STAIRWAY 1 STANDPIPE 30SGA32

250
25
30SGA31

11CB2F
11CB2F
BR004
BR004 BR007

150
80 150 Space for Stamp:
DR
IP/OE
11CB2F 11CB2F RETURN CODE
30SGA31
AA505

11CB2F
30SGA31

30SGA32
BR205
AA506

50
30SGA32
AA509 VT

30SGA31
CHEMICAL & LUBE OIL BUILDING TURBINE BUILDING 30SGA31

BR206

11CB2F
LO
AA008 DR
A

25
TP-BF-FP-010 VT

62.0805 MC (BV) 30SGA31


30SGA32

30SGA32
11CB2F
BR209

BR207 AA505
25

WF 30SGA32 50
Revision History
BR010 11CB2F
200 TP-BF-FP-008 Rev. Revision Date Created by Checked by Approved by Brief of Description
STANDPIPE STEAM TURBINE SEAL OIL RESERVOIR
11CB2F 62.0805 MC (BV) 5 09/DEC/21 TPG JNE YPK REVISED PER ECN-N-M-0038
30SGA32

11CB2F
BR210

4 30/SEP/19 PPT PTN YPK REVISED PER ECN-N-M-0020


50

STEAM TURBINE LUBE OIL RESERVOIR SPARE FOR


DR C
C TP-BF-FP-003 3 24/JUL/19 PPT PTN YPK ISSUED FOR CONSTRUCTION - APPV IN CODE B
30SGA31
WAREHOUSE & WORKSHOP BUILDING 2 20/JUN/19 PPT PTN YPK REVISED PER ECN-N-M-0008
HP/IP & LP STEAM TURBINE BEARINGS AA507
DR 30SGA31 1 12/MAR/19 PPT PTN YPK ISSUED FOR CONSTRUCTION - APPV IN CODE B
LO
30SGA32 AA010

APPROVED FOR 30SGA31


AA514
AA510 BELOW GRATED EQUIPMENT PLATFORM WF 30SGA32
BR008
0 12/MAR/19

Description of Current Revision:


PPT

FOR CONSTRUCTION
PTN YPK REVISED AS PER COMMENTS

CONSTRUCTION VT
11CB2F
250 Owner:
30SGA31

30SGA31
11CB2F

THE DISTRIBUTION AND USE OF THE NATIVE FORMAT CAD


BR214

AA011
25

FILE OF THIS DRAWING IS UNCONTROLLED. THE USER


SHALL VERIFY TRACEABILITY OF THIS DRAWING TO THE 30SGA31
TRANSFORMERS/
LATEST CONTROLLED VERSION. BR011
DOSING SKID/
150
30SGA31 TURBINE BUILDING SAMPLING CONTAINER/
AA027 11CB2F
30SGA31 FEEDWATER PUMPS
AA026 30SGA31
GENERATION BLDG/ 30SGA31
BR015
HRSG/ AA034
30SGA31 150
LO FUEL GAS CONDITIONING AREA/ 30SGA31 UNIT AUXILIARY TRANSFORMER Owner's Engineer:
AA025 AA035
DOSING SKID/ LO 11CB2F
30SGA31
30SGA31 SAMPLING CONTAINER
11CB2F

BR010
30SGA31

WATER & WASTEWATER AA023 GENERATOR STEP UP TRANSFORMER


BR208

150
TREATMENT PLANT/ 30SGA31 30SGA31
50

LO
D WAREHOUSE & WORKSHOP AA024 AA009 D
LO 11CB2F

DR
30SGA31 Contractor:
30SGA31 30SGA31 30SGA31
BR009
AA021 HRSG/
150 AA015 AA508
UTILITY PUMP STATION/ 30SGA31 AUX BOILER/
WATER & WASTEWATER TREATMENT PLANT AA022
LO 11CB2F FEEDWATER PUMPS/ GENERATOR STEP UP TRANSFORMER 62.0805 MC (BV)
30SGA31
SECONDARY ELECTRICAL BLDG/ & UNIT AUXILIARY TRANSFORMER
AA509 TP-BF-FP-006
30SGA31
30SGA31
11CB2F

VT Project
BR008
30SGA31

AA019
30SGA31
BR213

150
BR209

11CB2F

GENERATION BLDG 30SGA31 30SGA31


50

LO
TAMBAK LOROK COMBINED CYCLE
25

AA020 AA014 TP-BF-FP-009


LO 11CB2F

DR
MC (BV) 62.0805 POWER PLANT BLOCK 3 PROJECT
30SGA31
30SGA31
30SGA31
HRSG/ AA017
BR007 30SGA31
VT
AA512 30SGA32 WF
WITH NET DEPENDABLE CAPACITY OF 600-850 MW.
30SGA31

150 AA513
BR212

30SGA31
CEMS/
SEMARANG - CENTRAL JAVA
11CB2F

BR009
25

GT FIREFIGHTING SKID AA018 150


LO 11CB2F
ReleasedforConstruction-setbyMarubeniCorporationon13-Dec-21

11CB2F
864

Subject:
30SGA32

11CB2F
BR208

30SGA31
9.

PIPING AND INSTRUMENT DIAGRAM


50
30SGA31
11.

AA510
11CB2F
BR001
30SGA31

SITE FIRE PROTECTION


250
BR006

11CB2F
D v8.

150

VT
E DR SECONDARY ELECTRICAL BUILDING Issued Purpose: Responsible Dept: E
30SGA31

FOR CONSTRUCTION MECHANICAL


antPI

11CB2F

(CABLE ROOM UNDERFLOOR)


BR210
ze

30SGA32
25
lSi

30SGA31 30SGA31 AA508 Originator:

ALL BACKCIRCLED
OpenPl

30SGA31
Ful

BR001 BR005
AA016
11

250 150
30SGA31
=
1:

11CB2F AA013
PM

LO 11CB2F
CHANGES PER 30SGA31
AM

30SGA31

11CB2F
BR211
38

AA012 Originator Document No: Originator Rev:


1

50
:
55:
2

196541-30SGA-M2665B 5
:
1900

ECN N-M-0038
a

Project Document no: Rev: Sheet:


45969-

DR
00
/2
/2 2

TBL/30/E/SGA---BV54/FD/001 5 2/2
09

30SGA31
/0
col

22

AA511
1/
A1
2

You might also like