Professional Documents
Culture Documents
TBL 30 e Sga Bv54 FD 001 en 5 Piping and Instrument Diagram Site Fire Protection
TBL 30 e Sga Bv54 FD 001 en 5 Piping and Instrument Diagram Site Fire Protection
NOTES:
30SGA22CL502 4. MISCELLANEOUS BRANCHES FROM THE MAIN PIPING WILL HAVE THE SAME SYSTEM CODE
AND BRANCH IDENTIFIER AS THE MAIN PIPING AS FOLLOWS, UNLESS NOTED OTHERWISE.
VENTS, DRAINS AND PIPING SSSXXBR2XX
LS INSTRUMENT PIPING SSSXXBR3XX
NJECTOR
30SGA22CL501 WHERE SSXXX IS THE SYSTEM CODE AND BRANCH IDENTIFIER OF THE MAIN PIPING.
5. THE SYSTEM OPERATING AND DESIGN PRESSURES ARE 1,180 KPAG AND 1,280 KPAG
I
A RESPECTIVELY, AND THE SYSTEM OPERATING AND DESIGN TEMPERATURES ARE 36°C A
AND 45°C RESPECTIVELY.
30SGA22
DIESEL FIRE PUMP ENGINE 6. PIPING MATERIAL SPECIFICATION CAN BE REFERRED FROM DOC. NO.
30SGA22AP001 BR001 TBL/30/W/U-----BV01/FD/003.
FIRE RING MAIN
250
0004 30SGA-M2665B
PURCHASE 62.0805 11CB2F 7. LOOP DIAGRAM CAN BE REFERRED FROM DWG. NO. TBL/30/E/SGA---BV54/BD/001.
TP-BF-FP-020
8. POWER PLANT INSTRUMENTATION CONCEPT CAN BE REFERRED FROM DOC. NO.
1.50 METER
MC (BV) 62.0805 TBL/31/E/003b---012/GS/091.
30SGA22
DIESEL FIRE PUMP
FUEL TANK AA007
9. SYSTEM DESCRIPTION CAN BE REFERRED FROM DOC. NO. TBL/30/E/SGA---BV54/DM/001.
B
30SGA22BB001 30SGA30GH002
S
TEST 10. CONTROL INTERFACE PRINCIPLE CAN BE REFERRED FROM DOC. NO. TBL/31/E/CB----EN80/DO/002.
DIESEL ENGINE
DRIVEN FIRE PUMP DR
CONTROLLER 11. PIPING AND INSTRUMENT DIAGRAM LEGEND CAN BE REFERRED FROM
DR
DWG. NO. TBL/30/W/U-----BV01/FD/002.
PI
30SGA12
AA501 30SGA22CP502 TP-BF-FP-019
PI 30SGA22 12. HIGH POINT VENTS AND LOW POINT DRAINS WILL BE PROVIDED AS TECHNICALLY REQUIRED.
VT TP-BF-FP-014 30SGA22CP501 62.0805 MC (BV)
AA901
30SGA12
30SGA22
BR201
11CB2F
30SGA22 AA702
30SGA12 AA003 LO
SERVICE/FIRE 30SGA12 AA701
BR001
WF
WATER TANK B LO
B AA001 350 B
0003 30GHA-M2663A 30SGA22
LO 11CB2F 30SGA22 DIESEL ENGINE DRIVEN 30SGA22 AA006
LC
30SGA12
11CB2F
BR202
FIRE PUMP
AA001 AA004
50
30SGA14
30SGA22AP001 (1 x 100%)
AA501
30SGA23 FIRE PUMPS BUILDING
LO
568 M3/HR @ 10.8 BAR
VT DR TP-BF-FP-016 AA001 (DIESEL FIRE PUMP ROOM) Space for Stamp:
IP/OE
30SGA14
11CB2F
BR201
MC (BV) 62.0805
30SGA12 RETURN CODE
25
30SGA14 AA502
SERVICE/FIRE
WATER TANK A BR001
11CB2F
250 FT
30SGA23
BR201
30GHA-M2663A 0001
11CB2F 30SGA22CF501
50
30SGA14
11CB2F
A
BR202
50
DR
DR 30SGA14 30SGA23
AA502
AA501
30SGA23
Revision History
11CB2F
BR001
250
30SGA15 Rev. Revision Date Created by Checked by Approved by Brief of Description
AA501
VT TP-BF-FP-017
30SGA22 5 09/DEC/21 TPG JNE YPK REVISED PER ECN-N-M-0038
30SGA15
11CB2F
BR201
MC (BV) 62.0805
AA008 4 30/SEP/19 PPT PTN YPK REVISED PER ECN-N-M-0020
25
30SGA15 30SGA23
C SERVICE/FIRE C
BR001 BR002 3 24/JUL/19 PPT PTN YPK ISSUED FOR CONSTRUCTION - APPV IN CODE A
WATER TANK A
250 65 2 20/JUN/19 PPT PTN YPK ISSUED FOR CONSTRUCTION - APPV IN CODE B
30GHA-M2663A 0002
11CB2F DIESEL FIRE PUMP SKID 11CB2F
1 29/APR/19 PPT PTN YPK REVISED PER ECN-N-M-0008
30SGA13 0 12/MAR/19 PPT PTN YPK ISSUED FOR CONSTRUCTION - APPV IN CODE B
LO
30SGA15
SERVICE/FIRE AA001 PURCHASE 62.0805
Description of Current Revision: FOR CONSTRUCTION
WATER TANK B BR002
250 Owner:
11CB2F
BR201
BR202
50 PI
50
30SGA23
LO
11CB2F 30SGA21CP502 AA002
ELECTRIC MOTOR
LC
DR
DRIVEN FIRE PUMP TEST TEST
CONTROLLER 30SGA21
30SGA22
30SGA15 30SGA21
30SGA22 30SGA21
30SGA30GH001 AA006
AA502 AA702 DR DR BR001
LO FIRE RING MAIN
DR 250
0005 30SGA-M2665B
30SGA13 11CB2F
AA501 30SGA21
30SGA22 Owner's Engineer:
30SGA13
11CB2F
BR001
AA003
350
30SGA11
AA501 30SGA21AP001 62.0805 MC (BV)
PI
VT TP-BF-FP-015 30SGA21CP501 ELECTRIC MOTOR DRIVEN TP-BF-FP-018
D 30SGA21
30SGA22 D
LO
30SGA11
11CB2F
FIRE PUMP
BR201
(1 x 100%) Contractor:
30SGA11
SERVICE/FIRE 30SGA11 AA701
568 M3/HR @ 10.8 BAR
WATER TANK A BR001 1.50 METER
AA001
350 LO
0002 30GHA-M2663A
11CB2F
LO
30SGA11
30SGA21
30SGA22
11CB2F
BR202
AA001
ALL BACKCIRCLED
50
PRESSURE
MAINTENANCE TEST TEST
PUMP CONTROLLER Project
DR 30SGA21
30SGA22 PI B B 30SGA30GH003
LO
DR DR
30SGA11
AA007 30SGA21CP504
CHANGES PER TAMBAK LOROK COMBINED CYCLE
AA502
30SGA21
30SGA22
POWER PLANT BLOCK 3 PROJECT
PI
AA704
ECN N-M-0038 WITH NET DEPENDABLE CAPACITY OF 600-850 MW.
SEMARANG - CENTRAL JAVA
30SGA21CP503
30SGA21
30SGA22
ReleasedforConstruction-setbyMarubeniCorporationon13-Dec-21
864
Subject:
30SGA21
30SGA22 AA009
APPROVED FOR
9.
PRESSURE MAINTENANCE
PM
(JOCKEY) PUMP
AM
(1 x 100%)
24
196541-30SGA-M2665A 5
:
1900
a
00
/2
/2 2
2
TBL/30/E/SGA---BV54/FD/001 5 1/2
09
/0
col
22
1/
A1
2
1 2 3 4 5 6 7
30SGA31
30SGA31
BR301
PT VT UTILITY AND FIRE WATER PUMP/ NOTES: 4. MISCELLANEOUS BRANCHES FROM THE MAIN PIPING WILL HAVE
30SGA31
25
AA501
11CB2F
30SGA31 30SGA31 30SGA31
BR201
11CB2F 30SGA31CP001 ULTRA PURE WATER THE SAME SYSTEM CODE AND BRANCH IDENTIFIER AS THE
30SGA31
25
BR013 BR001 BR001 & AIR COMP SHELTER/ 1. SYSTEM CODE IS SGA EXCEPT WHERE INDICATED.
30SGA31 MAIN PIPING AS FOLLOWS, UNLESS NOTED OTHERWISE.
150 250 250 AA701 30SGA31 2. ALL SYSTEM COMPONENTS ARE SERIES 30SGANNFFXXX UNLESS NOTED OTHERWISE.
BR002 H2 STORAGE VENTS, DRAINS AND PIPING SSSXXBR2XX
AA002 3. MISCELLANEOUS PIPING AND INSTRUMENTATION CONNECTION PIPING SIZE ARE AS
11CB2F 150 INSTRUMENT PIPING SSSXXBR3XX
11CB2F LO 30SGA31 FOLLOWS, EXCEPT AS INDICATED.
30SGA31
11CB2F
30SGA32 30SGA31 WHERE SSSXX IS THE SYSTEM CODE AND BRANCH IDENTIFIER
BR216
30SGA31 AA003 VENT AND TEST CONNECTIONS 25 MM (THREADED)
30SGA31 AA501 11CB2F LO OF THE MAIN PIPING.
11CB2F
BR203
50
30SGA31
AA030 AA001 DRAIN CONNECTIONS 50 MM (THREADED)
30SGA32
50 AA504
11CB2F
30SGA31
VT
BR011
30SGA32
30SGA22 PRESSURE CONNECTIONS
BR202
30SGA31
11CB2F
5. THE SYSTEM OPERATING AND DESIGN PRESSURES ARE 1,180 KPAG
150
BR201
BR215
30SGA31
11CB2F
11CB2F
50
30SGA31 DR AA501 VT PRESSURE INDICATORS 25 MM (THREADED)
25
AND 1,280 KPAG RESPECTIVELY AND THE SYSTEM OPERATING AND
BR001
30SGA31
50
30SGA21
11CB2F
250
BR204
AA031 DR 30SGA31 PRESSURE TRANSMITTERS 25 MM (THREADED) DESIGN TEMPERATURES ARE 36°C AND 45°C RESPECTIVELY.
30SGA31 AA501 VT
25
30SGA22
30SGA32
30SGA31 AA502
BR201
11CB2F
BR211
AA516
11CB2F
WAREHOUSE & WORKSHOP/ VT 30SGA31 DR 30SGA31
25
BR001 6. PIPING MATERIAL SPECIFICATION CAN BE REFERRED FROM
30SGA21
50
AA503
BR201
ELECTRO-CHLORINATION BLDG/ AA004
11CB2F
DR 250 DOC. NO. TBL/30/W/U-----BV01/FD/003.
25
11CB2F
CW PUMP STATION
30SGA32
30SGA31 TP-BF-FP-004
BR202
11CB2F LO 7. LOOP DIAGRAM CAN BE REFERRED FROM
50
AA515 30SGA32
30SGA32
DR VT
30SGA32
MC (BV) 62.0805 DWG. NO. TBL/30/E/SGA---BV54/BD/001.
BR003
AA506
BR206
11CB2F
200
11CB2F
25
30SGA32
30SGA32
11CB2F
30SGA32
11CB2F
30SGA32
BR013
BR001
8. POWER PLANT INSTRUMENTATION CONCEPT CAN BE
DR 30SGA32
150
AA511
80
AA502 MC (BV) REFERRED FROM DOC. NO. TBL/31/E/003b---012/GS/091.
001
BR015
30SGA32
013
MC (BV)
11CB2F
30SGA21
30SGA22
FP-
11CB2F
30SGA31
30SGA31
200
BR001
BR001
11CB2F
11CB2F
BR003
BR014
BR207 9. SYSTEM DESCRIPTION CAN BE REFERRED
FP-
250
250
150
150
BF-
A DR 50 11CB2F A
FROM DOC. NO. TBL/30/E/SGA---BV54/DM/001.
BF-
TP-
012
MC (BV)
30SGA31
11CB2F
11CB2F
TP-
62.0805
BR012
FP-
150
62.0805
30SGA31
30SGA32 FROM DOC. NO. TBL/31/E/CB----EN80/DO/002.
002
BF-
BR001
MC (BV)
250
30SGA31 AA507 30SGA31
FP-
TP-
BF-
M 2665A
M 2665A
62.0805
REFERRED FROM DWG. NO. TBL/30/W/U-----BV01/FD/002.
C M OTOR
30SGA31
NE
30SGA31 30SGA31
TP-
BR001
250
RE PUM P
RE PUM P
ESELENGI
30SGA31 AA033 AA006
LO 62.0805 12. HIGH POINT VENTS AND LOW POINT DRAINS
AA028
30SGA-
30SGA-
ADMIN BLDG/ ADMIN BLDG/ WILL BE PROVIDED AS TECHNICALLY REQUIRED.
ELECTRI
FG ELECTRICAL EDG/
FI
FI
& CONTROL ROOM/ FUEL GAS COMP STATION/
DI
TP-BF-FP-005
WF
H2 STORAGE TRANSFORMERS
0005
0004
30SGA31
200 SYSTEM
MC (BV) 62.0805
WF
AA029
RW AY 1
RW AY 2
WF
WAREHOUSE & WORKSHOP/
30SGA32
CHEMICAL & LUBE OIL SHELTER/ WATER & WASTEWATER
WF
STAI
STAI
FM -
ELECTRO-CHLORINATION BLDG
(TREATMENT AREA) H2, N2 & CO2 GAS BOTTLE 200
STORAGE BUILDING
(H2 ROOM)
11CB2F
30SGA31 30SGA31
TP-BF-FP-007
30SGA32
ADMINISTRATION, ELECTRICAL LO
BR203
ELECTRO-CHLORINATION BUILDING BR001 AA007
& CONTROL BUILDING
50
(OPERATING AREA) 62.0805 MC (BV) 250
B 11CB2F B
TP-BF-FP-011
STAIRWAY 2 STANDPIPE DR GAS RECEIVING STATION UNIT
30SGA32
11CB2F
30SGA31
62.0805 MC (BV)
BR205
AA504
11CB2F
30SGA32
30SGA32
50
30SGA32
30SGA32
BR002
11CB2F
BR006
AA503
BR204
VT
100
WF 30SGA32 STAIRWAY 1 STANDPIPE 30SGA32
250
25
30SGA31
11CB2F
11CB2F
BR004
BR004 BR007
150
80 150 Space for Stamp:
DR
IP/OE
11CB2F 11CB2F RETURN CODE
30SGA31
AA505
11CB2F
30SGA31
30SGA32
BR205
AA506
50
30SGA32
AA509 VT
30SGA31
CHEMICAL & LUBE OIL BUILDING TURBINE BUILDING 30SGA31
BR206
11CB2F
LO
AA008 DR
A
25
TP-BF-FP-010 VT
30SGA32
11CB2F
BR209
BR207 AA505
25
WF 30SGA32 50
Revision History
BR010 11CB2F
200 TP-BF-FP-008 Rev. Revision Date Created by Checked by Approved by Brief of Description
STANDPIPE STEAM TURBINE SEAL OIL RESERVOIR
11CB2F 62.0805 MC (BV) 5 09/DEC/21 TPG JNE YPK REVISED PER ECN-N-M-0038
30SGA32
11CB2F
BR210
FOR CONSTRUCTION
PTN YPK REVISED AS PER COMMENTS
CONSTRUCTION VT
11CB2F
250 Owner:
30SGA31
30SGA31
11CB2F
AA011
25
BR010
30SGA31
150
TREATMENT PLANT/ 30SGA31 30SGA31
50
LO
D WAREHOUSE & WORKSHOP AA024 AA009 D
LO 11CB2F
DR
30SGA31 Contractor:
30SGA31 30SGA31 30SGA31
BR009
AA021 HRSG/
150 AA015 AA508
UTILITY PUMP STATION/ 30SGA31 AUX BOILER/
WATER & WASTEWATER TREATMENT PLANT AA022
LO 11CB2F FEEDWATER PUMPS/ GENERATOR STEP UP TRANSFORMER 62.0805 MC (BV)
30SGA31
SECONDARY ELECTRICAL BLDG/ & UNIT AUXILIARY TRANSFORMER
AA509 TP-BF-FP-006
30SGA31
30SGA31
11CB2F
VT Project
BR008
30SGA31
AA019
30SGA31
BR213
150
BR209
11CB2F
LO
TAMBAK LOROK COMBINED CYCLE
25
DR
MC (BV) 62.0805 POWER PLANT BLOCK 3 PROJECT
30SGA31
30SGA31
30SGA31
HRSG/ AA017
BR007 30SGA31
VT
AA512 30SGA32 WF
WITH NET DEPENDABLE CAPACITY OF 600-850 MW.
30SGA31
150 AA513
BR212
30SGA31
CEMS/
SEMARANG - CENTRAL JAVA
11CB2F
BR009
25
11CB2F
864
Subject:
30SGA32
11CB2F
BR208
30SGA31
9.
AA510
11CB2F
BR001
30SGA31
11CB2F
D v8.
150
VT
E DR SECONDARY ELECTRICAL BUILDING Issued Purpose: Responsible Dept: E
30SGA31
11CB2F
30SGA32
25
lSi
ALL BACKCIRCLED
OpenPl
30SGA31
Ful
BR001 BR005
AA016
11
250 150
30SGA31
=
1:
11CB2F AA013
PM
LO 11CB2F
CHANGES PER 30SGA31
AM
30SGA31
11CB2F
BR211
38
50
:
55:
2
196541-30SGA-M2665B 5
:
1900
ECN N-M-0038
a
DR
00
/2
/2 2
TBL/30/E/SGA---BV54/FD/001 5 2/2
09
30SGA31
/0
col
22
AA511
1/
A1
2