Sr.NO. DRAWING TITLE DRAWING NO. Sr.NO. DRAWING TITLE DRAWING NO.
KEY PLAN
BHAT
DAIN
BP1
BP2
NEW BP-1A
NEW BOUNDARY
MATCH AREA AS PER TENDER
EXISTING FENCING
BP4
BP3
M
EH
SA
N
A
CLIENT:
CONSULTANT:
TPIA:
EPC CONTRACTOR:
DEC:
PROJECT:
18-OCT-2019
RAJESH BHIMRAO THUL (B894)
1 of 8
Page 1 of 8
Contractor to ensure compliance of attached comments and re-submit for
review along with CRS.
18-OCT-2019
RAJESH BHIMRAO THUL (B894)
2 of 8
Page 2 of 8
REFERENCE DRAWING / DOCUMENTS REFERENCE DRAWING / DOCUMENTS
Sr.NO. DRAWING TITLE DRAWING NO. Sr.NO. DRAWING TITLE DRAWING NO.
DISPOSAL SHALL
BE SHOWN AS
PER TOPO DWG,
Contractor to
ensure compliance
of statutory
requirements.
IT IS CONTRACTOR'S
RESPONSIBILITY TO MATCH ALL
THE BM AS PER APPROVED TOPO
DWG AND INSPECTION REPORT
ATTACHED WITH TOPO DWG.
KEY PLAN
BHAT
DAIN
BP1
BP2
NEW BP-1A
NEW BOUNDARY
MATCH AREA AS PER TENDER
EXISTING FENCING
GENERAL CIVIL COMMENTS AS
MARKED:
FURNISH DESIGN CALCULATIONS OF:
1.0 STORM WATER DRAINS.
2.0 DRINKING WATER SYSTEM
3.0 SANITARY SYSTEM.
4.0 IT IS CONTRACTOR'S BP4
BP3
RESPONSIBILITY TO MATCH THE
M
EH
LAYOUT WITH APPROVED TOPO DWG.
SA
N
A
CLIENT:
CONSULTANT:
TPIA:
EPC CONTRACTOR:
DEC:
PROJECT:
18-OCT-2019
RAJESH BHIMRAO THUL (B894)
3 of 8
Page 3 of 8
Please refer attached file.
18-OCT-2019
RAJESH BHIMRAO THUL (B894)
4 of 8
Page 4 of 8
Page 1 of 1
COMMENT SHEET
REVIEW CODE:-
1: NO COMMENTS
2: PROCEED WITH MANUFACTURE/FABRICATION AS PER COMMENTED DRAWING/DOCUMENTS.
REVISED DRAWING/DOCUMENT REQUIRED.
3: DOCUMENT DOES NOT CONFORM TO BASIC REQUIREMENTS AS MARKED. RESUBMIT DOCUMENT.
R: RETAINED FOR INFORMATION/RECORD
V : VOID
18-OCT-2019
RAJESH BHIMRAO THUL (B894)
Template No. 5-0000-0001-T2 Rev. 2 / 28.11.2014 Copyrights EIL – All rights reserved
5 of 8
Page 5 of 8
Page 2 of 2
COMMENT SHEET
18-OCT-2019
RAJESH BHIMRAO THUL (B894)
Template No. 5-0000-0001-T2 Rev. 2 / 28.11.2014 Copyrights EIL – All rights reserved
6 of 8
Page 6 of 8
Please refer attached file
18-OCT-2019
RAJESH BHIMRAO THUL (B894)
7 of 8
Page 7 of 8
Page 1 of 1
COMMENT SHEET
1: NO COMMENTS
2: PROCEED WITH MANUFACTURE/FABRICATION AS PER COMMENTED DRAWING/DOCUMENTS.
REVISED DRAWING/DOCUMENT REQUIRED.
3: DOCUMENT DOES NOT CONFORM TO BASIC REQUIREMENTS AS MARKED. RESUBMIT DOCUMENT.
R: RETAINED FOR INFORMATION/RECORD
V: VOID
18-OCT-2019
RAJESH BHIMRAO THUL (B894)
Template No. 5-0000-0001-T2 Rev. 2 / 28.11.2014 Copyrights EIL – All rights reserved
8 of 8
Page 8 of 8