REFERENCE DRAWING / DOCUMENTS REFERENCE DRAWING / DOCUMENTS

Sr.NO. DRAWING TITLE DRAWING NO. Sr.NO. DRAWING TITLE DRAWING NO.

KEY PLAN

BHAT
DAIN
BP1

BP2

NEW BP-1A

NEW BOUNDARY
MATCH AREA AS PER TENDER

EXISTING FENCING

BP4

BP3

M
EH
SA
N
A
CLIENT:

GSPL INDIA GASNET LIMITED

CONSULTANT:

TPIA:

EPC CONTRACTOR:

DEC:

PROJECT:

TITLE: SITE DEVELOPMENT PLAN & LAYOUT FOR


SV-4016
SIZE:
SCALE:
SHEET:

18-OCT-2019
RAJESH BHIMRAO THUL (B894)
1 of 8

Page 1 of 8
Contractor to ensure compliance of attached comments and re-submit for
review along with CRS.

18-OCT-2019
RAJESH BHIMRAO THUL (B894)
2 of 8

Page 2 of 8
REFERENCE DRAWING / DOCUMENTS REFERENCE DRAWING / DOCUMENTS
Sr.NO. DRAWING TITLE DRAWING NO. Sr.NO. DRAWING TITLE DRAWING NO.

DISPOSAL SHALL
BE SHOWN AS
PER TOPO DWG,

Contractor to
ensure compliance
of statutory
requirements.

IT IS CONTRACTOR'S
RESPONSIBILITY TO MATCH ALL
THE BM AS PER APPROVED TOPO
DWG AND INSPECTION REPORT
ATTACHED WITH TOPO DWG.

HFL shall match as


per TOPO Dwg.

KEY PLAN

BHAT
DAIN
BP1

BP2

NEW BP-1A

NEW BOUNDARY
MATCH AREA AS PER TENDER

EXISTING FENCING
GENERAL CIVIL COMMENTS AS
MARKED:
FURNISH DESIGN CALCULATIONS OF:
1.0 STORM WATER DRAINS.
2.0 DRINKING WATER SYSTEM
3.0 SANITARY SYSTEM.
4.0 IT IS CONTRACTOR'S BP4

BP3
RESPONSIBILITY TO MATCH THE

M
EH
LAYOUT WITH APPROVED TOPO DWG.

SA
N
A
CLIENT:

GSPL INDIA GASNET LIMITED

CONSULTANT:

TPIA:

EPC CONTRACTOR:

DEC:

PROJECT:

TITLE: SITE DEVELOPMENT PLAN & LAYOUT FOR


SV-4016
SIZE:
SCALE:
SHEET:

18-OCT-2019
RAJESH BHIMRAO THUL (B894)
3 of 8

Page 3 of 8
Please refer attached file.

18-OCT-2019
RAJESH BHIMRAO THUL (B894)
4 of 8

Page 4 of 8
Page 1 of 1
COMMENT SHEET

CLIENT : GIGL EIL Job No. A 286


PROJECT : MBPL-PHASE-2 (Section- III) Transmittal No./Ref
CONTRACTOR: M/s JSIW Document No.
Review Code

COMMENT/OBSERVATION (FOR 015-IP-3_4014_4015_4016_ RESOLUTION/


S. No. ACTION
4016M2)

 Contractor to indicate the size of the repeater building


including size of each room such as electrical room, telecom
and SCADA room etc. Further contractor to submit the
equipment layout of electrical room and telecom SCADA room
so that it can be ascertained that room sizes as indicated in
the plot plan are adequate enough to accommodate all the
1.0 equipments.

Note that above comment is a preliminary comment on the building


layout as indicated in the plot plan. Contractor to furnish the building
architectural drawing indicating the equipment layout as commented
above so that building size can be finalized which can thus be
indicated in the plot plan.

Location of two pole structure is indicated outside the boundary of the


station; however this could be confirmed after the finalization of the
2.0
load list calculations through which total load of the station would be
determined.

 Vendor to indicate the location of 415V isolator panel in the


plot plan.
 Exact location of electrical meter room (HT metering) shall be
decided as per actual site condition and final location of two
3.0 pole terminating structure (it shall be near to two pole
structure); also it is preferable to have its location close to the
entry gate and easily accessible from main gate for visitors;
further indicate the dimension of the room which shall be min
3mx3m.

 Mark an indicative ERC in the drawing; however note that


however these shall be constructed as per electrical cable
4.0 layout drawings, which shall indicate the details of these
ERCs.
 Indicate the location of cable entry in the electrical room.

Two-pole structure shall be constructed as per the SEB requirements;


5.0
therefore note regarding that shall be updated accordingly.

NOTE: 1. CONTRACTOR IS OBLIGED TO FURNISH THIS SHEET (DULY FILLED UP WITH


RESOLUTION TO ALL EIL COMMENTS) ALONG WITH REVISED DOCUMEMTS/DRAWINGS.

REVIEW CODE:-

1: NO COMMENTS
2: PROCEED WITH MANUFACTURE/FABRICATION AS PER COMMENTED DRAWING/DOCUMENTS.
REVISED DRAWING/DOCUMENT REQUIRED.
3: DOCUMENT DOES NOT CONFORM TO BASIC REQUIREMENTS AS MARKED. RESUBMIT DOCUMENT.
R: RETAINED FOR INFORMATION/RECORD
V : VOID
18-OCT-2019
RAJESH BHIMRAO THUL (B894)
Template No. 5-0000-0001-T2 Rev. 2 / 28.11.2014 Copyrights EIL – All rights reserved
5 of 8

Page 5 of 8
Page 2 of 2
COMMENT SHEET

COMMENTS BY (NAME & SIGN)


DEPARTMENT DATE:

18-OCT-2019
RAJESH BHIMRAO THUL (B894)
Template No. 5-0000-0001-T2 Rev. 2 / 28.11.2014 Copyrights EIL – All rights reserved
6 of 8

Page 6 of 8
Please refer attached file

18-OCT-2019
RAJESH BHIMRAO THUL (B894)
7 of 8

Page 7 of 8
Page 1 of 1
COMMENT SHEET

CLIENT : GIGL EIL Job No. A286


PROJECT : MBPL-PHASE-2 Transmittal No./Ref -
SECTION : III GIGLM-1004-SV4016-CS-DRW-PPL-
CONTRACTOR : JSIW Infrastructure Document/ Drawing No.
R-7513_Rev_00
Pvt. Ltd. Review Code 2

S. No. COMMENT/ OBSERVATION RESOLUTION/ ACTION


1. Contractor shall specify height of boundary wall.
2. Contractor shall revise width of road and type of road as per tender
document.
3. Contractor shall review pipeline exit w.r.t. P/L ROU as same is
locate outside ROU.
4. General
4.1 Contractor shall prepare/list drawing w.r.t. Overall plot plan showing
FGL, P/L Equipment area, Vent, Guard room, DG shed, Green belt
and repeater building only along with safety distance table only.
4.2 After approval of overall plot plan, Contractor shall prepare Layout
plan showing storm water drain, drinking water system, sanitary
system, site grading etc.
4.3 Above philosophy will reduce effort w.r.t. detail Engg. activity.

NOTE: 1. CONTRACTOR IS OBLIGED TO FURNISH THIS SHEET (DULY FILLED UP WITH


RESOLUTION TO ALL EIL COMMENTS) ALONG WITH REVISED DOCUMEMTS/DRAWINGS.
REVIEW CODE:-

1: NO COMMENTS
2: PROCEED WITH MANUFACTURE/FABRICATION AS PER COMMENTED DRAWING/DOCUMENTS.
REVISED DRAWING/DOCUMENT REQUIRED.
3: DOCUMENT DOES NOT CONFORM TO BASIC REQUIREMENTS AS MARKED. RESUBMIT DOCUMENT.
R: RETAINED FOR INFORMATION/RECORD
V: VOID

COMMENTS BY (NAME & SIGN) JAY KUMAR URAON


DEPARTMENT PLOT PLAN & WATER DATE: 09.10.2019

18-OCT-2019
RAJESH BHIMRAO THUL (B894)
Template No. 5-0000-0001-T2 Rev. 2 / 28.11.2014 Copyrights EIL – All rights reserved
8 of 8

Page 8 of 8