Professional Documents
Culture Documents
A FURNACE
Finished
Mechanical Installation
Piping - Hydraulic
- Installation Finished
- Piping flushing - using GRP flushing unit 30-Jun-21
- System flushing/plishing - using one HPU Pump 21-Jul-21 15-Aug-21
15-Jul-21
Electrical & Automation
15-Jul-21 15-Aug-21
I/O Check Start
15-Aug-21
Cold Test
B MILL STAND
On-going
Mechanical Installation
Piping - Hydraulic
- Installation 30-Jul-21
- Piping flushing - using GRP flushing unit 30-Jul-21 10-Sep-21
- System flushing/polishing - using one HPU pump 10-Sep-21 10-Oct-21
30-Aug-21
Electrical & Automation
15-Jul-21 30-Aug-21
I/O Check Start
10-Oct-21
Cold Test
C COOLING BED
On-going
Mechanical Installation
15-Aug-21
Electrical & Automation
15-Jul-21 15-Aug-21
I/O Check Start
15-Aug-21
Cold Test
On-going
D FINISHING AREA
Mechanical Installation
Mechanical Installation
30-Oct-21
Electrical & Automation
ssioning Schedule
A FURNACE
Finished
Mechanical Installation
Piping - Hydraulic
- Installation Finished
- Piping flushing - using GRP flushing unit Finished
- System flushing/plishing - using one HPU Pump Finished
15-Jul-21
Electrical & Automation
15-Jul-21 15-Aug-21
I/O Check Start
15-Aug-21
Cold Test
B MILL STAND
On-going
Mechanical Installation
Piping - Hydraulic
- Installation On-going
- Piping flushing - using GRP flushing unit 30-Jul-21 On-going
- System flushing/polishing - using one HPU pump 10-Sep-21 10-Oct-21
30-Aug-21
Electrical & Automation
15-Jul-21 30-Aug-21
I/O Check Start
10-Oct-21
Cold Test
C COOLING BED
On-going
Mechanical Installation
15-Aug-21
Electrical & Automation
15-Jul-21 15-Aug-21
I/O Check Start
15-Aug-21
Cold Test
On-going
D FINISHING AREA
Mechanical Installation
Mechanical Installation
30-Oct-21
Electrical & Automation
ssioning Schedule
LOCATION
TYPE OF
LINE NUMBER
LINE
FROM TO
HY1-0015-60.3X8-250B P
HY1-0006-88.9X11-250B HY1-0018-20X2.5-250B P
HY1-0006-88.9X11-250B HY1-0019-25X3-250B P
HY1-0006-88.9X11-250B HY1-0008-48.3X6.3-250B P
HY1=0008-48.3X6.3-250B HY1-0007-60.3X8-250B HY1-0009-48.3X6.3-250B P
HY1=0009-48.3X6.3-250B HY1-0008-48.3X6.3-250B HY1-0020-30X4-250B P
HY1-0022-48.3X6.3-250B P
HY1-0011-88.9X11-250B HY1-0005-88.9X11-250B 2611.N108 P
HY1-0012-30X4-250B HY1-0005-88.9X11-250B 2611.N109 P
HY1-0013-20X2.5-250B HY1-0004-88.9X11-250B 2611.N110 P
HY1-0014-25X3-250B HY1-0004-88.9X11-250B 2611.N111 P
HY1-0015-60.3X8-250B HY1-0006-88.9X11-250B 2611.N112 P
HY1-0016-38X5-250B HY1-0007-60.3X8-250B 2611.N118 P
HY1-0017-38X5-250B 2611.N118 2611.N113 P
HY1-0018-20X2.5-250B HY1-0007-60.3X8-250B 2611.N110 (2) P
HY1-0019-25X3-250B HY1-0007-60.3X8-250B 2611.N111 (2) P
HY1-0020-30X4-250B HY1-0009-48.3X6.3-250B 2611.N118 (2) P
HY1-0021-30X4-250B 2611.N118 (2) 2611.N114 P
HY1-0022-48.3X6.3-250B HY1-0009-48.3X6.3-250B 2611.N116 P
HY1-0031-114.3X14.2-250B 2611.N108 101.003.02 A1
HY1-0032-88.9X11-250B 2611.N108 101.003.02 B1
HY1-0033-16X2-250B 2611.N109 2611.0090 & 2485.0014 C1
HY1-0034-16X2-250B 2611.N109 2611.0090 & 2485.0014 C2
HY1-0035-16X2-250B 2611.N109 2611.0090 & 2485.0014 C3
HY1-0036-16X2-250B 2611.N109 2611.0090 & 2485.0014 C4
HY1-0037-16X2-250B 2611.N109 2611.0090 & 2485.0014 B1
HY1-0038-20X2.5-250B 2611.N109 2611.0090 & 2485.0014 A2
HY1-0039-20X2.5-250B 2611.N109 2611.0090 & 2485.0014 B2
HY1-0040-20X2.5-250B 2611.N109 2611.0090 & 2485.0014 A3
HY1-0041-20X2.5-250B 2611.N109 2611.0090 & 2485.0014 B3
HY1-0042-20X2.5-250B 2611.N109 2611.0090 & 2485.0014 A4
HY1-0043-20X2.5-250B 2611.N109 2611.0090 & 2485.0014 B4
HY1-0044-20X2.5-250B 2611.N109 2611.0090 & 2485.0014 A5
HY1-0045-20X2.5-250B 2611.N109 2611.0090 & 2485.0014 B5
LINE LIST FOR HYDRAULIC PIPELINE FURNACE AREA
WORKING PRESSURE
VISUAL TEST RESULT TEMP(°C) DATE
(BAR)
Furnace Area
LEAK TEST
PRESSURE RESULT
DURATION
GIVEN 1.3 X
(HOUR)
WP (BAR) Central Hydraulic Unit
Billets Charging Grid
Weighing Sys+Kick Off
Charging Door
Discharging Door
Kick In
Kick Off
Furnace Lifting
Furnace Translation
Furnace Translation
Assy dwg. Job No. Valve Stand Start Date Finish Date Assign to
N107
√ √ CSP Team
N114
103.001.02 √ √ CSP Team
N115
√ √ CSP Team
N118
√ √ CSP Team
N116
2611.0083 + 71.143.02 √ √ CSP Team
N117 √ √ CSP Team
tion Welding Flushing 1st Stage
Target Target
Start Date Finish Date Assign to Start Date Finish Date Assign to
Completion Completion
Target Target
Start DateFinish DateAssign to Completi
Completion
on
Target
Start Date Finish Date Assign to Start Date Finish Date Assign to
Completion
√ √ CSP Team-Marta √ √ WOS Team
√ √ CSP Team-Marta √ √ WOS Team
√ √ CSP Team-Marta √ √ WOS Team
√ √ CSP Team-Marta √ √ WOS Team
ing Flushing 1st Stage
Target Target
Start Date Finish Date Assign to
Completion Completion
√ √ CSP&LSM Team Rusta&Mujiya
√ √ CSP&LSM Team Rusta&Mujiya
√ √ CSP&LSM Team Rusta&Mujiya
√ √ CSP&LSM Team Rusta&Mujiya
Cooling Bed Area 2611.N004
Target
Start Date Finish Date Assign to Start Date Finish Date Assign to
Completion
ing Flushing
Target Target
Start Date Finish Date Assign to
Completion Completion
LINE LIST FOR HYDRAULIC FINISH BAR AREA
2611.N005
Unit/Group Level/Responsibility Status Task Descrip
1 Marta Leader On Duty 1
2 Wagino Member On Duty 2
Group 1
3 Supri Member On Duty 3
4 Member On Duty 4
1 Iwan Leader On Duty 1
2 Subur Member On Duty 2
Group 2 3 Widodo Welder SMAW On Duty 3
4 Member On Duty 4
5
1 Murgandi Leader On Duty 1
2 Member On Duty 2
3 Member On Duty 3
Group 3 4
5
6
100%
100%
100%
100%
100%
100%
0% 100%
75%
75%
75%
5% 50%
100%
100%
100%
100%
90% 100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5%
50%
75% 85%
0% 5%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
95% 100%
5% 50%
0% 50%
0% 50%
0% 50%
0% 50%
100%
50% 65%
50% 65%
SI.No Designation Valve Stand Number Remark
2
2
10
10
11 8
9
7
8
8
8
7
10
8
6
5
6
Mill Stand Area: 2611.N002
Valve Stand
Number
SI.NO PIPELINE Polishing
1 Central Hydraulic Unit 2611.N120 Pending
2 Accumulator Stand 2611.N135 Pending
3 Safety Block 2611.N136 (1) Pending
4 Safety Block 2611.N136 (2) Pending
5 Safety Block 2611.N136 (3) Pending
6 Safety Block 2611.N136 (4) Pending
7 Stand 1H (HL850-32) 2611.N121 Pending
8 Stand 2V 2611.N121 Pending
9 Stand 3H 2611.N122 (1) Pending
10 Stand 4H/V 2611.N122 (1) Pending
11 Stand 5H 2611.N122 (2) Pending
12 Stand 6H/V 2611.N122 (2) Pending
13 Stand 7H/U (HL710-28) 2611.N123 Pending
14 Stand 8H/U 2611.N123 Pending
15 Stand 9 H/V-U 2611.N124 (1) Pending
16 Vertical Looper & Channel Translation #1 2611.N124 (1) Pending
17 Stand 10H/U 2611.N124 (1) Pending
18 Vertical Looper & Channel Translation #2 2611.N124 (1) Pending
19 Stand 11H/U 2611.N125 Pending
20 Stand 12H/V-U 2611.N124 (2) Pending
21 Vertical Looper & Channel Translation #3 2611.N124 (2) Pending
22 Stand 13H-U 2611.N124 (2) Pending
23 Vertical Looper & Channel Translation #4 2611.N124 (2) Pending
24 Stand 14H/V-U 2611.N128 Pending
40
11
6
12
11
28%
40
0
0
0
0%
JOB STATUS UP TO 27/08/2021
Polishing Installation
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Pending Done
Welding Flushing
Done Pending
Done Pending
Done Pending
Done Pending
Done Pending
Done Pending
Done Done
Done Done
Done Done
Done In Progress (Rusta)
Done Pending
In Progress (Muhaimin) Pending
50% Pending
50% Pending
50% Pending
50% Pending
50% Pending
50% Pending
50% Pending
50% Pending
50% Pending
50% Pending
50% Pending
In Progress (Mardimin) Pending
Done Pending
Done Pending
Pending Pending
In Progress (Suhata) Pending
In Progress (Jumat) Pending
50% Pending
Pending Pending
Pending Pending
Pending Pending
Pending Pending
Pending Pending
Done Pending
Done Pending
Done Pending
Done Pending
Done Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
Pending
40
18
4
6
12
45%
40
0
0
0
0%
Days Tanggal No General Job (logs) Man Power
100% 100% 0%
100% 75% 0%
100% 0% 0%
100% 0% 0%
ROBOT ROLL SHOP COOLING BED FINISH BAR
100% 100% 0%
100% 75% 0%
100% 0% 0%
100% 0% 0%
SI.NO HY-1 FURNACE POLISHING ACTIVITY DATE
LUBRICATION MILL
INSTALLATION / SET UP
WELDING
FLUSHING
POLISHING
SEPTEMBER OKTOBER NOVEMBER
III IV I II III IV I II III IV
Date to do list Contact Person
18/08/2021
Filter element 5 micron to be order for return line all HPU Nanda
Two unit HPU and all valves ex.BP4 to be shifted to LSM Asna
MOTOR DATA PUMPS DATA
QTY
Q (L/mn) Max.Press Max.RPM
Installed Type Size
1 4WRKE35W61000L-3X/6EG24K31/F1D3M 35
1 4WE10J5X/EG24N9K4/M 10
4 4WREE6W1-32-2X/G24K31/F1V 6
1 5-4WE10J3X/CG24N9K4/C 10
1 5-4WE10J3X/CG24N9K4/C 10
1 4WE10J5X/EG24N9K4/M 10
1 4WE10J5X/EG24N9K4/M 10
1 4WRKE25W6-350L-3X/6EG24K31/F1D3M 25
1 4WRKE10W6-100L-3X/6EG24K31/F1D3M 10
1 5-4WE10J3X/CG24N9K4/C 10
1 4WEH16E7X/6EG24N9ESK4 16
PIPELINE DATA
125 40
25 4 40
75 60
188 4 125
188 4 125
108 4 100
108 4 100
83 60
85 95
63 6 40
125 2.7 20-100
Sep-21 Oct-21
AREA
I II III IV I II III IV
A. HYDRAULIC FURNACE
*Reassemble valves (Waiting SMS Hyd Spv)
*Filling oil (Waiting SMS Hyd Spv)
B. GREASE FURNACE
*Installation 90%
*Welding 50%
*Flushing 0%
*Filling grease 0%
E. GREASE MILL
*Installation 0%
*Welding 0%
*Flushing 0%
*Filling grease 0%