1. GENERAL NOTES:
1.1 All dimensions are in millimeters unless and otherwise stated. 2. MATERIALS SPECIFICATIONS
1.2 Any doubtful dimensions/descriptions and confusions shall be brought to the 2.1 Concrete
a) Concrete in substructure (abutment wall and mat) shall have minimum D
D attention of the Engineer-in-charge for any corrections (if any) before the execution
of work. compressive strength of 25 MPa at 28 days for superstructure unless noted
1.3 No dimension shall be scaled from the drawings. Only written dimension shall be otherwise.
followed. b) All concrete edges shall be chamfered by 25X25 mm
1.4 Contractor shall prepare workshop drawings in confirmation with drawings provided c) Clear cover :75 mm in abutment and foundation
and submit to get it approved. 2.2 Reinforcing steel
1.5 Contractor shall submit as built drawings after completion of whole works. a) All reinforcing steel to be minimum of HYSD and shall have minimum yield strength
1.6 Contractor shall require to submit certified test reports of all materials involved in the of Fe415 Mpa and TMT Fe500 grade is also allowed to use confirming to IS: C
C
work. 1786-1979.
1.7 Contractor shall require to prove the quality, workmanship and finishing of work after 2.3 Expansion Joints
commissioning as per the standard specificatons of Road and Bridges (YELLOW a) The expansion joints must be robust, durable, water tight and replaceable. It must
BOOK) of DoR and codal provisions of IRC and IS. be provided over the full width of super structure including kerb and footpath
1.8 Number of reinforcement bars shall not be counted from drawings.Contractor shall following the profile of the same (where relevant). Expansion joints shall be
prepare reinforcement schedule showing the quantity on the basis of given spacing obtained only from approved manufacturers and be of proven type. Details of
and/or specifed number of bars in drawing and get the schedule approved. expansion joints may be got approved before commencement of construction. Site
B
B 1.9 All the material and workmanship shall be in accordance with relevant fabrication expansion joints shall be prohibited.
standards/codes of practice specified therein and sound engineering practice. b) Concrete of pocket shall be done with great care using proper mix confirming to
1.10 The contractor shall be responsible for fabrication, erection, construction and grade similar to that of the deck casting besides ensuring efficient bonding between
maintainance of all the parts of the structure in stable, acceptable and serviceable deck & steel insert.
condition, ensuring no part under construction is unduly stressed and unsafe. c) Needle vibrations shall be used & care shall be taken so that the position of steel
1.11 All the drawings shall be read in conjuction with all relevant drawings provided. inserts is not disturbed during vibrations.
1.12 Dimensions, reinforcement bars, structural steel, concrete and quantity shown d) Line & level shall be adjusted and well maintained.
A hereinside the drawings pertain to superstructure are for one span only. A

Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED
GENERAL NOTES
10/09/2023
S1.01
BAILEYBRIDGE AT ARUN BARUN DESIGN BY: Drawn By:-
PSR
TRIVENI- TD-42M SPAN ........................................................... PVT. LTD.
Sheet

Design By:-
PSR
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

2.4 Bearings 4. BAILEY BRIDGE AND BOLTS


a) Metallic bearings shall confirm to IRC: 83-1982 (part-1)
4.1 All structural steel rolled section & plates shall be of Fe350 grade steel of the yield E
E i) Tolerance on diameter of rollers and all convex and concave surfaces shall
confirm to IS: 919 stress of fy=350 Mpa confirming to IS: 2062-1999.
b) Elastomeric bearings shall confirm to IRC : 83-1987 4.2 Minimum thickness of fillet weld shall be 6mm, wherever required for connection
i) Hardness IRHD= 60 - IS: 3400 between main plates and 6mm for other connections unless otherwise specified.
4.3 All welding shall confirm to IS: 816-1969 and IS: 1323-1982.
3. WORKMANSHIP/DETAILING 4.4 Material & fabrication for all high strength friction grip bolts, nuts &washers shall
3.1 Construction joints shall be planned and get it approved. Joints should be nearly confirm to IS:4000-1992, IS: 3757-1985, IS: 6623-1985 & IS: 6649-1985.
D perpendicular to the principal lines of tensile stress and in general be located at 4.5 Surface preparation for connections using HSFG bolt must confirm to IS: 4000:1992 D
points of minimum shear and minimum moment as far as possible. Concreting to attain a slip factor / coeffcient of friction 0.45.
operation shall be carried out continuously up to the construction joints. 4.6 All HSFG bolts, nuts and washers are of property class 8.8 hot dip galvanized
3.2 Welding of reinforcement bars shall not be permitted. confirming to IS : 3757-1985
3.3 Bending of reinforcment bars shall be as per IS : 2502. 4.7 Erection bolts and nuts shall confirm to IS : 1363-1967 and IS : 1367-1967.
3.4 Supporting chairs diameter shall be provided at suitable intervals as per IS : 2502. 4.8 Fabrication and erection of structural steel works shall confirm to
3.5 All metals shall be neatly & accurately cut to required size with proper allownace as IRC : 24-2001(section v), IS : 7205-1974 and IS : 7215-1974.
may be necessary or required for finishing operations. 4.9 Bolts hole diameter shall be 1.5mm larger than nominal bolt diameter upto 25mm
C
C
3.6 All fins, ragged or distorted edges resulting from shearing, speed sawing or flame bolt diameter and 2.0 mm larger for bolt having diameter having more than 25mm.
cutting shall be reamed by milling, chipping & grinding. 4.10 All holes for HSFG bolts and erection bolts shall be drilled.
3.7 Built up member shall be true to detailed dimensions and shall be free to twists, 4.11 All holes necessary for erection bolts shall be plugged fully after successful
bends, open joints or other defects resulting from faulty fabrication or workmanship. completion of erection work.
3.8 Rejected materials and workmanship shall be promptly replaced with satisfactory 4.12 All dimensions to be confirmed at site before cutting of members.
material & workmanship. 4.13 The welds are to be continuous unless shown otherwise.
3.9 After assembly, holes shall be reamed to spcified sizes. 4.14 End bearing stiffner plates will be milled to bear perfectly under top and bottom
B flanges of girders and welded to upper and bottom flanges as shown in drawings. B
4.15 When span is lifted on jacks live load will not be allowed over the bridge.
4.16 Suitable temporary adequate lateral bracings shall be provided during erection of
individual girders.
4.17 Bolts may be tightened by part turn part torque method.
4.18 Minimum bolt tension for property 8.8 HSFG shall be confirming to IS : 8000-1992
as following table :
A A

Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED
BAILEYBRIDGE AT ARUN BARUN GENERAL NOTES
10/09/2023
S1.02
Drawn By:-
DESIGN BY: PSR
TRIVENI- TD-42M SPAN ........................................................... PVT. LTD.
Sheet

Design By:-
PSR
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

6. QUALITY ASSURANCE PLAN


High Strength Friction Grip (HSFG) Grade=8.8 6.1 The contractor shall prepare quality assurance plan with the quality controling
system, submit and get those approved.
Diameter(Ø)
16 18 20 22 24 27 30 6.2 The materials which have been warped, bended, out of plumbness and having
mm
serious defects due to cracks stand rejected and contractor shall repair and replace
E Proof Load KN 92.1 115.0 147.0 182.0 212.0 275.0 337.0 the material and maintain the quality as per standard specifications. E

8. DESIGN CRITERIA

4.19 Straightening of bends in main structural members shall not be permitted in the 8.1 The design is according to the following codes:
field. Such members shall be returned to the fabricator for proper repair and a) IRC : 5-1998
replacement by the proper method not producing embrittlement, fracture or damage. b) IRC : 6-2000
c) IRC :21-2000.
8.2 Youngs modulus of elasticity for M25 grade of concrete is assumed
D
5. FALSEWORK AND ERECTION 29000 N/mm² confirming to IRC 22 - 1986. D

5.1 The contractor shall plan, design to carry safely the weight of any equipment which 8.3 The modular ratio of concrete of grade M25 is 15 for permanent load and
may be required to support before starting the construction of falsework, submit 7.5 for transient load to account for creep effect.
and get it approved. 8.4 Youngs modulus of elasticity of MS plate designing composite plate girder is assumed
5.2 Engineer's approval of such plans and designs or his aquiescence in the work shall as 211000 N/mm² confirming to IRC 22 - 1986.
not relieve the contractor of responsibility for satisfactory result. 8.5 The following loads have been considered in the design:
5.3 Falsework bends shall be so constructed as to provide minimum clearance of 600 a) One lane of IRC Class A
C mm between the falsework caps and the lower members of the structure which are b) Footpath load of 4 kN/sq.m for superstructure. C
to be supported thereon to provide ample space for the jacking and riveting of
such members.
5.4 Straightening of bends in falsework members shall not be permitted in the field.
9. DESIGN DATA
Such members shall be returned to the fabricator for proper repair and replacement
by the proper method not producing embrittlement, fracture or damage. 9.1 Design Loads for Substructure and Foundations
5.5 Contractor shall prepare proper methodology for erection plan and proper lifting Dead Load from Superstructure : 413 KN
devices to be used to palce steel structures at proper location as per the site Live Load from superstructure including impact : 103 KN
B B
condition with the list of equipments required so that lifting stress will not cause
9.2 In place Pre-Camber
any damage to the girder.
For Bailey bridge Girder=120mm(As per IRC 24-2010; Clause: 504.5.1)
Design Loads For Bearing
Dead Load reaction : 99 KN
Live Load reaction : 38 KN
Horizontal reaction :100 KN
A Rotation : 0.009 rad A

Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED
GENERAL NOTES
10/09/2023 S1.03
BAILEYBRIDGE AT ARUN BARUN DESIGN BY: Drawn By:-
PSR
TRIVENI- TD-42M SPAN ........................................................... PVT. LTD.
Sheet

Design By:-
PSR
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

E
7.1 Tightening of bolt shall be symmetrical starting from the E

most rigid parts of the joint at the centre and working


oudward, to eliminate warps in the plates by pushing
them to the free ends.
7.2 Bolts shall be tightened in required order and sequence
D
to ensure that the faying surfaces of the plates being D

bolted are pulled into full contact and that all the bolts
have approximately the same final tension. If the required
sequence of bolt tightening is not followed some initially
tightened bolts may loosen and allow plates that
C
previously in contact, to pull apart and chances of slip will C

be there.
7.3 Bolts shall be perpendicular to the plate.
7.4 The bolt to be tightened first is number 1. Bolt to be
tightened next is number 2 and so on until the last bolt
B
number 48 is tightened as shown in sample drawing B

herein above.
7.5 During submission of workshop drawing contractor shall
submit bolt tightening plan and torque value table for
different bolts with its grade.
A 7.6 The faying surfaces of bolted connection shall be in full A

contact when assembled not be separated by gaskets or


any other compressible material.

Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED
GENERAL NOTES 10/09/2023 S1.04
BAILEYBRIDGE AT ARUN BARUN DESIGN BY: Drawn By:-
PSR
TRIVENI- TD-42M SPAN ........................................................... PVT. LTD.
Sheet

Design By:-
PSR
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

BL-5
421.866

BL-9
391.502

HIGH FLOOD LEVEL


E E

BL-4
407.523

BL-8
Arjun Thapa
387.862

Agamraj Rai

Power House
D BL-2
D
406.941

Sankuwa Khola
BM-2
406.190
Silichong Ga.Pa.-4 Gate

Salary
BM-1
Tree

404.110
Tree
Chautara

P-1
C C

BL-6
411.177

ge
B rid
Silichong Ga.Pa.-1

on

ine
nsi
spe

is L
Bogling

Su

Ax
BL-3

BM-4
400.402

401.112
P-2 BL-7
381.520
EP
B BL-14 B
402.455

OLA
BM-3
401.223

N KH
ARU
A BL-15
A
bari

399.192
hand

BL-17
378.682
To K

BL-16
375.383

Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED TOPOGRAPHIC MAP 10/09/2023 S1.05
BAILEYBRIDGE AT ARUN BARUN SHOWING BRIDGE AXIS DESIGN BY: Drawn By:-
PSR
TRIVENI- TD-42M SPAN ........................................................... PVT. LTD.
Sheet

LOCATION Design By:-


PSR
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

42000

3500

1025
3500

950
3972
950
E
E deck lvl.
385.135M 2600

947

325
1004 1004

600

600
soffit lvl.384.372m

1461
M25 M25
750
42000 hfl.382.911m 750
8796

8796
10846

8150

8150
bed level. 379.211m

10446
M25 M25
7550

7550
D D

376.301M 376.301M
5750 1500 4350 4350 1500 5750
1650

1650
M25

374.651m abt scour level- 374.651M 374.651m M25

11600 11600

C C

e eral arra eme t M

B B

A A

Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED
BAILEYBRIDGE AT ARUN BARUN
TYPICAL SECTION OF BAILEY
BRIDGE, ABUTMENT, SCOUR DEPTH DESIGN BY:
10/09/2023

Drawn By:-
S1.06
PSR
TRIVENI- TD-42M SPAN & BORE LOG DATA ........................................................... PVT. LTD.
Sheet

Design By:-
PSR
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

00
50
CL B

455 400
445 405

400
E E
6862

4200
5006

6710
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 20233
1500 1500 1500 1500 1500 1500 1500

400
400 455
D
405 445

50
BAILE BRID E DECK PLAN WIDTH 4 2M

00
DOUBLE PANEL HEI HT TRIPE SIDE PANEL
C TD-42M SPAN C
1025

10

10

10

10

10

10

10

10
12

12

12

12

12

12

12

12

12

12

12

12

12

12
10

10

10

10

10

10
12

10

12

10

12

10

12

12

10

12

10

12

10

12
10

12

10

12

10

12

10

10

12

10

12

10

12

10
31
31

31

31

31

31

31

31

31

31

31

31

31

31
36

36

36

36

36

36

36

36

36

36

36

36

36

36
950

36
36

36

36

36

36

36

36

36

36

36

36

36

36
31

31

31

31

31

31

31

31

31

31

31

31

31
31
3797

3797

3797

3797

3797

3797

3797

3797

3797

3797

3797

3797

3797

3797
3972

31

31
31

31

31

31

31

31

31

31

31

31

31

31
36

36

36

36

36

36

36

36

36

36

36

36

36

36
950

36

36
36

36

36

36

36

36

36

36

36

36

36

36
31

31

31

31

31

31

31

31

31

31

31

31

31
31

B B
947

12

12

12

12

12

12

12

12

12

12

12

12

12

12
10

10

10

10

10

10

10

10
10

10

10

10

10

10
10

10

10

10

10

10
10

10

10

10

10

10

10

10
12

12

12

12

12

12

12

12
12

12

12

12

12

12
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000

42000

STEEL SECTION SCHEDULE

SECTION
SHAPE STEEL SECTION DESCRIPTIONS

ISA 75 X75 X6

A
ISMC100

ISMC125- BACK TO BACK DOUBLE PROFILE


BAILE BRID E ELE ATION A
ISMC200- BACK TO BACK DOUBLE PROFILE
DOUBLE PANEL HEI HT TRIPE SIDE PANEL
TD-42M SPAN
ISMC150- BACK TO BACK DOUBLE PROFILE

ISLB200

ISMB300 WITH TOP/BOTTOM 12MM PLATE-125MM WIDTH

ISLB400

Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED
BAILEYBRIDGE AT ARUN BARUN
BAILEY BRIDGE DECK PLAN AND ELEVATION
OF DOUBLE HEIGHT TRIPLE GIRDER ON
10/09/2023

Drawn By:-
S1.07
DESIGN BY: PSR
TRIVENI- TD-42M SPAN EACH SIDE PANEL ........................................................... PVT. LTD.
Sheet

Design By:-
PSR
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

E E

1025
950

3092

3297
D D

3972
950
4200 150

1000

1951
150

947
400 450 250
250450 400 C
C
150 4200 150
6710

42
B 42 B

A A

Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED
BAILEYBRIDGE AT ARUN BARUN TYPICAL SECTION OF TD-42M 10/09/2023

Drawn By:-
S1.08
BAILEY BRIDGE DESIGN BY: PSR
TRIVENI- TD-42M SPAN ........................................................... PVT. LTD.
Sheet

Design By:-
PSR
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

STEEL SECTION SCHEDULE F


F

SECTION
SHAPE STEEL SECTION DESCRIPTIONS

ISA 75 X75 X6

ISMC100
E
E ISMC125- BACK TO BACK DOUBLE PROFILE

ISMC200- BACK TO BACK DOUBLE PROFILE

ISMC150- BACK TO BACK DOUBLE PROFILE

ISLB200
D D

ISMB300 WITH TOP/BOTTOM 12MM PLATE-125MM WIDTH

ISLB400

C C
1025

12

12

12

12

12

12

12
10

10

10
10

10

10

10
10

10

10

10
10

10

10
12

12

12
12

12

12

12
31

31

31

31

31

31

31
36

36

36

36

36

36

36
950

36

36

36

36

36

36

36
31

31

31

31

31

31

31
3797

3797

3797

3797

3797

3797

3797
3972

B B

31

31
31

31

31

31

31
36

36

36

36

36

36

36
950

36

36
36

36

36

36

36
31

31

31

31

31

31

31
947

12

12

12

12

12

12

12
10

10

10

10
10

10

10
10

10

10

10
10

10

10
12

12

12

12
12

12

12
3000 3000 3000 3000 3000 3000 3000
A A

BAILE BRID E ELE ATION


DOUBLE PANEL HEI HT TRIPE SIDE PANEL TD-42M SPAN
Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED
BAILEYBRIDGE AT ARUN BARUN DETAIL PROFILE & STEEL SECTIONS
DESIGN BY:
10/09/2023

Drawn By:-
S1.09
TRIVENI- TD-42M SPAN OF BAIELY BRIDGE PSR Sheet
........................................................... PVT. LTD.
Design By:-
PSR
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

STEEL SECTION SCHEDULE F


F

SECTION
SHAPE STEEL SECTION DESCRIPTIONS

ISA 75 X75 X6

ISMC100
E
E ISMC125- BACK TO BACK DOUBLE PROFILE

ISMC200- BACK TO BACK DOUBLE PROFILE

ISMC150- BACK TO BACK DOUBLE PROFILE

ISLB200
D D

ISMB300 WITH TOP/BOTTOM 12MM PLATE-125MM WIDTH

ISLB400

C C

12

12

12
0
10

10
1

12
12
0

0
31

31
36

36

36
36

36
31

31

31
3797

3797
B B

31

31

31
36

36
36

36

36
31
31
0

0
12

12

0
1

1
12

12

10

12
0
3000 3000 3000
A A

42000 BAILE BRID E ELE ATION


DOUBLE PANEL HEI HT TRIPE SIDE PANEL TD-42M SPAN
Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED
BAILEYBRIDGE AT ARUN BARUN DETAIL PROFILE & STEEL SECTIONS
10/09/2023

Drawn By:-
S1.10
OF BAIELY BRIDGE DESIGN BY: PSR
TRIVENI- TD-42M SPAN ........................................................... PVT. LTD.
Sheet

Design By:-
PSR
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

6710 6710
E 400 400 400 400 E
200

200
50

50
450 5010 450 450 5010 450
600

600
D D

M25 M25
7550

7550
C C
4329

4329
Ø20mm @ 200mm c/c EXTRA Verticals Ø25mm @ 200mm c/c EXTRA Verticals

Ø20mm @ 200mm c/c THRO Verticals Ø25mm @ 200mm c/c THRO Verticals

B B
1650

1650
Ø10mm -2LS @ 200mm c/c Ø10mm -2LS @ 200mm c/c
ALONG WIDTH OF MAT ALONG WIDTH OF MAT

7410 7410
A A
RIGHTSIDE REBAR ELEVATION LEFTSIDE REBAR ELEVATION
OF ABUTMENT WALL OF ABUTMENT WALL

Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED ELEVATION OF ABUTMENT 10/09/2023 S1.11
BAILEYBRIDGE AT ARUN BARUN STEM WALL DESIGN BY: Drawn By:-
PSR
TRIVENI- TD-42M SPAN ........................................................... PVT. LTD.
Sheet

Design By:-
PSR
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

F F

PLAIN ELASTOMERIC PAD


177mm X 152mm X 52mm-6Nos
Ø8mm HELICAL STIRRUPS PITCH= 150mm ON EACH SIDE
FOR SUPPORT
Ø20mm @ 150mm c/c THRO Ø20mm @ 150mm c/c THRO

600
E
8Nos-Ø16mm VERTICALS E
FOR SUPPORT Ø12mm @ 150mm c/c THRO EF

Ø16mm @ 250mm c/c DISTRIBUTION BARS EACH FACE Ø110mm HDPE PIPE @2M C/C ALONG WIDTH AT
BACKFILL SIDE WRAP /W GEOTEXTILE D
D
150GSM /W SAND MIX GRAVEL

RIGHTSIDE OF
LEFTSIDE OF

8150
M25
ABUTMENT WALL

7550
ABUTMENT WALL
C C

Ø20mm @ 200mm c/c EXTRA Verticals Ø25mm @ 200mm c/c EXTRA Verticals

Ø20mm @ 200mm c/c THRO Verticals Ø25mm @ 200mm c/c THRO Verticals

B
Ø20mm @ 175mm c/c MAIN BARS Ø20mm @ 300mm c/c DISTRIBUTIONS B

5727 1500 4373


1650

M25
Ø10mm -2LS @ 200mm c/c
ALONG WIDTH OF MAT
A A

Ø20mm @ 150mm c/c MAIN BARS


11800

Sheet Number
NOTES : PROJECT : DRAWING TITLE : SANKHUWA BRIDGE
Scale :-NTS

ALL DIMENSIONS ARE MILLIMETER. Date :-


UNLESS OTHERWISE NOTED
BAILEYBRIDGE AT ARUN BARUN DETAIL SECTION OF ABUTMENT
10/09/2023
S1.12
Drawn By:-
DESIGN BY: PSR
TRIVENI- TD-42M SPAN ........................................................... PVT. LTD.
Sheet

Design By:-
PSR