Professional Documents
Culture Documents
MAPNA GROUP
D D
C C
B FOR INFORMATION MSA BFA FAG PAZ OCT.2012 B FOR INFORMATION MSA BFA FAG PAZ OCT.2012
A FOR INFORMATION .AET BFA FAG PAZ MAY 2010 A FOR INFORMATION AET BFA FAG PAZ MAY 2010
ISSUED FOR ISSUED FOR
0 INFORMATION
.AET BFA FAG PAZ 28.OCT.2009 0
INFORMATION
AET BFA FAG PAZ 28.OCT.2009
Rev. DESCRIPTION. DESGIN. CHECK. HEAD. APPROVE DATE. Rev. DESCRIPTION. DESGIN CHECK. HEAD. APPROVE. DATE.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 1 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
Page
Page Revisions Remarks Revisions Remarks
No.
No.
0 A B C D E F G 0 A B C D E F G
1 X X 51 X X
2 X X 52 X X
3 X X 53 X X
4 X X 54 X X
5 X X 55 X X
6 X X 56 X X
7 X X 57 X X
8 X X 58 X X
9 X X 59 X X
10 X X 60 X X
11 X X 61 X X
12 X X 62 X X
13 X X 63 X X
14 X X 64 X X
15 X X 65 X X
16 X X X 66 X X
17 X X 67 X X
18 X X 68 X X
19 X X 69 X X
20 X X 70 X X
21 X X 71 X X
22 X X 72 X X
23 X X 73 X X
24 X X 74 X X
25 X X 75 X X
26 X X 76 X X
27 X X 77 X X
28 X X 78 X X
29 X X 79 X X
30 X X 80 X X
31 X X 81 X X
32 X X 82 X X
33 X X 83 X X
34 X X 84 X X
35 X X 85 X X
36 X X 86 X X
37 X X 87 X X
38 X X 88 X X
39 X X 89 X X
40 X X 90 X X
41 X X . . X
42 X X . . X
43 X X . . X
44 X X . . X
45 X X . . X
46 X X . . X
47 X X . . X
48 X X . . X
49 X X 123 X X
50 X X 124 X X
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 2 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE OF SECTIONS
ELECTRICAL SECTION:
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 3 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
SECTION A:
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 4 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE OF CONTENT
1) Sope 6
2) Standards And Codes 6
3) Design Requirements 8
4) General 8
5) Surface Preparation 9
6) Priming 10
7) Painting 10
8) Galvanizing 12
9) Inspection 13
10) Quality Control And Testing 13
11) Storage Life And Packaging 14
12) Labelling 14
13) Paint System 15
14) Painting Schedule 16
15) Quality Control 16
16) Tables : 17
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 5 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEMS
1. SCOPE
This specification covers the minimum requirements for the surface preparation and paint application
to equipment, piping and steel structures of main and auxiliary systems of power plant
Whilst the content of this specification defines the essential requirements of surface preparation and
painting, they do not relieve the contractor from his responsibility to carry out the work in accordance
with the appropriate codes and industry standards listed in below section(2).
2. STANDARDS AND CODES
- All standards and codes referred to herein shall be latest edition of such documents.
- The following design codes, standards and specification shall be used for the design and application of
painting and protective coatings, where referred to in this specification.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 6 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
BS 7079 Part A Preparation of steel substrates before application of paints and related products.
Group A- visual assessment of surface cleanliness.
ISO 8501-1
Part A1: Specification for rust grades and preparation grades of uncoated steel
substrates and of steel substrates after overall removal of previous coating.
BS 7079 Part C2
Method for the grading of the surface profile of abrasively blast- cleaned steel
substrates using a compactor.
ISO 8503-2
Preparation of steel substrates before application of paints and related products-visual
assessment of Surface cleanliness. Part 1: rust
SIS 05 5900
grades and preparation grades of uncoated steel substrates and of steel substrates after
overall removal of previous coatings.
IRAN TAVANIR Standard. final finish color shades standard
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 7 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
3. DESIGN REQUIREMENTS
- Coating for the protection of equipment, piping, structural steels, tanks, etc. shall be designed and
applied for the application over the specified minimum surface preparation standards detailed in this
specification in combination with the codes and industry standards listed in section 2.
- All coatings shall be suitable for applications and services in salty, corrosive, erosive and marine
environmental conditions. (According to the each power plant environmental condition).The coating
shall provide the dual function of protection against corrosion or deterioration and decoration of the
surfaces painted.
- The paint system shall generally be based on the maximum operating temperature of the equipment and
piping except the items affected by below clauses, the items where higher temperatures are in cyclic or
intermittent operation including steam out, start-up, regeneration, etc.
- The painting system for external application to internally lined items shall be based on the outside wall
temperature.
- All supports, including skits, legs, saddles, etc. shall be coated with the paint system for uninstalled
surfaces as appropriate to the metal of the equipment or piping being supported.
- For non-insulated pipes with maximum operating temperature less than 85°C, direct sunshine
temperature (max. 85°C) should be considered as the second base for coat selection.
4. GENERAL
No substitution or modification to materials and methods of application in this specification is
permissible, unless prior approved of owner has been obtained.
Prior to the commencement of work, the contractor shall submit for the approval of owner, fully
detailed procedures as to how he intends to carry out the work within the framework of this
specification. The contractor shall provide full details regarding the use of a lower tier subcontractor,
location of work, choice of materials and any such further information.
Application of coatings other than inorganic zinc primer shall be delayed until completion of all
required shop testing. Application of inorganic zinc silicate primer prior to pressure testing with
consequent covering up of welds shall only be permitted in specific cases agreed with eng. In such
cases application of the subsequent tie coat shall be delayed until completion of pressure testing.
The following surfaces and materials shall require painting:
All steel structures, sheds, pipe racks, steel supports, ladders, stairs, handrails, platforms, walkways,
monorails, cranes and all other steel members, unless specified otherwise.
All un-insulated carbon and low alloy piping, fittings and valves including painting of identification
marks.
All un-insulated equipment like columns, vessel, drums, storage tanks, heat exchangers, coolers,
pumps, compressors, filters, silos, conveyors and all other type of handling equipment and storage
bins, etc.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 8 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 9 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 10 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 11 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 12 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 13 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 14 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 15 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 16 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
16. Tables:
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 17 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLES
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 18 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 19 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 20 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
2x
TRANSFORM
1 Up to 90 °C OUTDOOR EXTERIOR SHOP SSPC SP 10 P3 70 F1 10 F2 70 340 7001
ER
0
INDOOR /
2 SWICHGEAR AMBIENT EXTERIOR SHOP SSPC SP 8 P4 65 --- --- F7 50 115 7035
OUTDOOR
BUS DUCT:
105 °C OUTDOOR EXTERIOR SHOP NOTE 1 F8 55 --- --- --- --- 55 9005
CONDUCTOR
3
EXTERIOR 9002
BUS DUCT:
80 °C OUTDOOR SHOP NOTE 1 F8 55 --- --- --- --- 55
ENCLODURE
INTERIOR 9005
INDOOR /
4 NGR PANEL AMBIENT EXTERIOR SHOP SSPC SP 8 P4 65 --- --- F7 50 115 7035
OUTDOOR
LIGHTING
5 AMBIENT OUTDOOR EXTERIOR SHOP SSPC SP 8 P4 65 --- --- F7 50 115 7035
POOL
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 21 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
2x
INDOOR SSPC SP 10 P3 70 F1 F2 120 390
100
JUNCTION
1 AMBIENT EXTERIOR SHOP 7035
BOX
2x
OUTDOOR SSPC SP 10 P3 70 F1 F2 70 340
100
INSTRUMENT
2 AMBIENT OUTDOOR EXTERIOR SHOP SSPC SP 8 P4 65 --- --- F7 50 115 7035
CABINET
CONTROL
3 AMBIENT INDOOR EXTERIOR SHOP SSPC SP 8 P4 65 --- --- F7 50 115 7035
PANEL
INSTRUMENT OUT 2x
4 AMBIENT EXTERIOR SHOP SSPC SP 10 P3 70 F1 F2 70 340 7035
RACK DOOR 100
HARD WIRE
5 BACK UP AMBIENT INDOOR EXTERIOR SHOP SSPC SP 8 P4 65 --- --- F7 50 115 7035
PANEL
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 22 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 23 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Item
Surface preparation
Description
Primer Coat
Inter Coat
Top Coat
DFT(μ)
RAL
RAL
RAL
DFT
DFT
See
None Insulated Piping (operating Temp) SSPC
1 P1 75 - F2 125 - F5 45 Tavanir
Up to 90° C SP10
standard
Note: this table is applicable for pulse jet line after heat exchanger
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 24 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Internal Surface External surface
Under Cladd Above Cladd
Primer Coat**
Descripti
preparation
Item
Inter Coat
Top Coat
Primer Coat
Primer Coat
preparation
preparation
DFT(μ)
Surface
Inter Coat
Inter Coat
Top Coat
Top Coat
on
RAL
RAL
RAL
DFT
DFT
DFT(μ)
DFT(μ)
Surface
Surface
RAL
RAL
RAL
RAL
RAL
RAL
DFT
DFT
DFT
DFT
Vertical
SSP Degr SSP
Duct P1or Zinc Zinc
1 C- 75 F2 125 1015 F5 50 7035 easin P5 50 - -- -- -- -- -- -- C- P1 75 F2 125 1015 F5 50 7035
(Lower/Up P3 Gray Gray
SP10 g SP10
per)
SSP SSP
P1or Zinc Zinc
2 Cone C- 75 F2 125 1015 F5 50 7035 No Cladd C- P1 75 F2 125 1015 F5 50 7035
P3 Gray Gray
SP10 SP10
Cone SSP Degr SSP
P1or Zinc Zinc
3 closing C- 75 F2 125 1015 F5 50 7035 easin P5 50 - -- -- -- -- -- -- C- P1 75 F2 125 1015 F5 50 7035
P3 Gray Gray
panel SP10 g SP10
SSP Degr SSP
P1or Zinc Zinc
4 Damper C- 75 F2 125 1015 F5 50 7035 easin P5 50 -- -- -- -- -- -- -- C- P1 75 F2 125 1015 F5 50 7035
P3 Gray Gray
SP10 g SP10
SSP Degr SSP
P1or Zinc Zinc
5 Bend C- 75 F2 125 1015 F5 50 7035 easin P5 50 - -- -- -- -- -- -- C- P1 75 F2 125 1015 F5 50 7035
P3 Gray Gray
SP10 g SP10
SSP Degr SSP
Silencer P1or Zinc Zinc
6 C- 75 F2 125 1015 F5 50 7035 easin P5 50 -- -- -- -- -- -- -- C- P1 75 F2 125 1015 F5 50 7035
case P3 Gray Gray
SP10 g SP10
SSP SSP
Transition P1or Zinc Zinc
7 C- 75 F2 125 1015 F5 50 7035 No Cladd C- P1 75 F2 125 1015 F5 50 7035
Piece P3 Gray Gray
SP10 SP10
SSP SSP
Filter P1or Zinc Zinc
8 C- 75 F2 125 1015 F5 50 7035 -- -- -- -- -- -- -- -- -- -- C- P1 75 F2 125 1015 F5 50 7035
house P3 Gray Gray
SP10 SP10
SSP SSP
Anti rain P1or Zinc Zinc
9 C- 75 F2 125 1015 F5 50 7035 -- -- -- -- -- -- -- -- -- -- C- P1 75 F2 125 1015 F5 50 7035
lower P3 Gray Gray
SP10 SP10
Surface Preparation : SSPC – SP10
1 Support Primer: P1, DFT:75μ , RAL: Zinc Gray
0 structure Inter: F2, DFT:125μ , RAL: 1015
Top: F5, DFT:50μ , RAL: 7035
Ladder,
1 Platform, Surface Preparation: Degreasing & Pickling
1 toe plate, Finish: Hot Dip Galvanized
Grating
SSP
1 **Anti Zinc
C- P1 75 F4 25 9006 F4 25 9007
2 icing Pipe Gray
SPI0
SSP
1 *** Pulse Zinc
C- P1 75 F4 25 9006 F4 25 9007
2 jet Gray
SPI0
NOTE: Temp Range (200 - 400) °C
*: In cases that Tavanir standard RAL do not include GT auxiliary systems, SIEMENSE recommended RAL has been considered.
**:Type1: P3:for normal weather & conditions; organic zinc rich epoxy primer, Type 2: P1:for sea weather & corrosive weather or conditions; inorganic zinc rich ethyl silicate
primer, type 3: client request(P3:organic zinc rich epoxy primer , P1: inorganic zinc rich ethyl silicate primer and etc.)
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 25 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
External side
Internal Side
Item
Description
Primer Coat
Primer Coat
preparation
preparation
Inter Coat
Inter Coat
Top Coat
Top Coat
DFT(μ)
DFT(μ)
DFT(μ)
DFT(μ)
Surface
Surface
RAL
RAL
RAL
RAL
RAL
RAL
Note
DFT
DFT
1
P1 80 F2 110 1015 F5 50 7035 Area"A"
SSPC- Zinc SSPC Zinc
Diffuser P1 75 -- -- -- -- -- --
SP10 Gray SP-10 Gray
P1 75 F4 25 9006 F4 25 9006 Area"B"
2
P1 80 F2 110 1015 F5 50 7035 Area"A"
SSPC Zinc SSPC Zinc
Transition Piece P1 75 -- -- -- -- -- --
-SP10 Gray SP-10 Gray
P1 75 F4 25 9006 F4 25 9006 Area"B"
3
P1 80 F2 110 1015 F5 50 7035 Area"A"
SSPC Zinc SSPC Zinc
Diverter Box P1 75 -- -- -- -- -- --
-SP10 Gray SP-10 Gray
P1 75 F4 25 9006 F4 25 9006 Area"B"
4
P1 80 F2 110 1015 F5 50 7035 Area"A"
SSPC Zinc SSPC Zinc
Silencer P1 75 -- -- -- -- -- --
-SP10 Gray SP-10 Gray
P1 75 F4 25 9006 F4 25 9006 Area"B"
5
P1 80 F2 110 1015 F5 50 9006 Area"A"
Cylindrical SSPC Zinc SSPC Zinc
P1 75 -- -- -- -- -- --
Chimney -SP10 Gray SP-10 Gray
P1 75 F4 25 9006 F4 25 7035 Area"B"
6
SSPC Zinc SSPC Zinc
Expansion Joints P1 75 -- -- -- -- -- -- P1 75 F4 25 9006 F4 25 9006 ---
-SP10 Gray SP-10 Gray
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 26 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 27 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Surface preparation
Item
Description
Primer Coat
Inter Coat
Top Coat
DFT(μ)
RAL
RAL
RAL
DFT
DFT
1 Headers* SSPC-SP10 P1 75 - F2 125 - F5 45 6018
Frame bundle
Plenum
Structure
Fan rings
Ladder, Walkway ,
Grating
Surge Tank
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 28 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Surface preparation
Item Description
Primer Coat
Inter Coat
Top Coat
DFT(μ)
RAL
DFT
DFT
1 Gas piping & Filter 1018
SSPC-SP10 P3 80 F2 110 F5 50
2 Steel Structure 5007
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 29 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Surface preparation
Item Description
Primer Coat
Inter Coat
Top Coat
DFT(μ)
RAL
DFT
DFT
1 Frame
3 Supports
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 30 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Surface preparation
Item Description
Primer Coat
Inter Coat
Top Coat
DFT(μ)
RAL
DFT
DFT
1 Fuel Oil Pipe Line
3 Supports
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 31 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Surface preparation
Item Description
Primer Coat
Inter Coat
Top Coat
DFT(μ)
RAL
DFT
DFT
1 Base Plate
2 Supports P4 70 _ _ F5 50 8001
SSPC-SP10
3 External Tank
_ _ _ _ F5 35 7000
4 Internal Tank
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 32 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Surface preparation
Item Description
Primer Coat
Inter Coat
Top Coat
DFT(μ)
RAL
DFT
DFT
1 Tank 7030
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 33 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Surface preparation
Item Description
Primer Coat
Inter Coat
Top Coat
DFT(μ)
RAL
DFT
DFT
1 Lube Oil Tank SSPC-SP6 P2 50 F8 100 F5 50 8001
SSPC-SP6 P2 50 F8 50 F8 50
3 Base Frame / Steel Structure 7030
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 34 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Surface preparation
Item Description
Primer Coat
Inter Coat
Top Coat
DFT(μ)
RAL
DFT
DFT
1 Pipe Water Line 6010
SSPC-SP10 P3 65 F2 200 F5 50
2 Base Frame & Support 7035
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 35 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Surface preparation
Item Description
Primer Coat
Inter Coat
Top Coat
DFT(μ)
RAL
DFT
DFT
1 c. chamber columns Hot dip galvanized
Lathearl shild
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 36 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
Surface preparation
Item
Description
Primer Coat
Inter Coat
Top Coat
DFT(μ)
RAL
RAL
RAL
DFT
DFT
SSPC
1 Carbon steel piping P6 50 red F10 60 7030 F11 50 8001
SP10
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 37 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 38 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
SURFACE PREPARATION
TEMPERATURE OF THE
PAINTING SYSTEM
EXTERIOR
INDOOR/
SURFACE
EQUIPMENT SHOP/
SURFACE/ RAL
ITEM
OUTDOOR INTERIOR NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SERVICE PRIMER
SURFACE COAT COAT
3 8008
Fuel oil pumps Ambient Indoor Exterior Shop According to Manufacturer Procedure or
1011
5 Electrical 7035
SSPC- Electrostatic
Equipment & Ambient Indoor Exterior Shop P5 --- --- --- 100 100 or
SP8 Polyester
Panel 6021
7035
Control Panel & SSPC- Electrostatic
6 Ambient Indoor Exterior Shop P5 --- --- --- 100 100 or
Cubicles SP8 Polyester
6021
Fuel Gas
SSPC- 2x
7 System (Piping Ambient Outdoor Exterior Site P3 70 F1 F5 70 340 1018
SP10 100
above ground)
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 39 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
EXTERIOR
INDOOR/
SURFACE
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SERVICE PRIMER
SURFACE COAT COAT
2x
Indoor Exterior Site SSPC-SP10 P3 70 F1 F2 120 390 1002
100
8 Steel Structure Ambient
2x
Outdoor Exterior Site SSPC-SP10 P3 70 F1 F5 70 340 1002
100
Super Heater
9 250 ºC Indoor Exterior Shop SSPC-SP10 P1 75 --- --- --- --- 75 ---
(Insulated)
Fire Tube
10 Boiler 250 ºC Indoor Exterior Shop According to Manufacturer Procedure
(Insulated)
Interior SSPC-SP10
Site P3 75 F1 200 F2 100 375 ---
Note (1)
Indoor
11 Fuel Oil Tank Ambient
2x
Exterior Site SSPC-SP10 P3 70 F1 F2 120 390 1011
100
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 40 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
Chemical
12 dosing Ambient Indoor Exterior Shop According to Manufacturer Procedure
Package
Deaerator
14 130 ºC Indoor Exterior Site SSPC-SP10 P1 75 --- --- --- --- --- ---
(Insulated)
Blow down
15 Tank 100 ºC Indoor Exterior Site SSPC-SP10 P1 75 --- --- --- --- --- ---
(Insulated)
Indoor &
16 Stack Max 300 ºC Exterior Site SSPC-SP10 P1 70 F4 30 F4 30 130 9006
Outdoor
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 41 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
Air
2x
1 conditioning Ambient Indoor Exterior Shop SSPC-SP-10 P3 70 F1 F2 120 390 9006
100
packaged unit
2x
5 Sand Trap Ambient Indoor Exterior Shop SSPC-SP-10 P3 70 F1 F2 120 390 1015
100
Steam to water
Heat
6 100 ºC Indoor Exterior Site SSPC-SP-10 P1 75 --- --- --- --- 75 ---
exchangers
(Insulated)
Closed Ex. 2x
7 80 ºC Indoor Exterior Site SSPC-SP-10 P3 70 F1 F2 120 390 6018
Tank 100
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 42 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
Make up 2x
9 Ambient Indoor Exterior Site SSPC-SP-10 P3 50 F1 F2 120 390 6018
tanks 100
HVAC 7035 or
11 Ambient Indoor Exterior Shop SSPC-SP-10 P4 50 --- --- F7 50 100
control panel 6021
Indoor &
Steam pipes
12 120 ºC Exterior Site SSPC-SP-10 P1 75 --- --- --- --- 75 ---
(Insulated) Outdoor
2x
Indoor P3 70 F1 F2 120 390 6018
100
Condensate
13 Ambient Exterior Site SSPC-SP-10
pipes
2x
Outdoor P3 70 F1 F5 70 340 6018
100
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 43 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
EXTERIOR
INDOOR/
SURFACE
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM
OUTDOOR INTERIOR PREPARATION NO.
NAME SITE INTER. FINISH TOTAL
DFT
DFT
DFT
SERVICE PRIMER
SURFACE COAT COAT DFT
Portable
1 Ambient Indoor Exterior Shop According to Manufacturer Procedure 3000
extinguishers
Indoor &
2 Hydrants Ambient Exterior Shop According to Manufacturer Procedure 3000
Outdoor
FF Diesel &
3 Ambient Indoor Exterior Shop According to Manufacturer Procedure 3000
El. Pumps
4 CO2 Cylinders Ambient Indoor Exterior Shop According to Manufacturer Procedure 3000
2x
Indoor P3 70 F1 F2 120 390 3000
100
5 F. F pipes Ambient Exterior Site SSPC-SP-10
2x
Outdoor P3 70 F1 F5 70 340 3000
100
2x
7 Pipe supports Ambient Indoor Exterior Site SSPC-SP-10 P3 70 F1 F2 120 390 3000
100
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 44 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
SURFACE PRIMER DFT DFT DFT
SERVICE SURFACE COAT COAT
Diesel
1 Ambient Indoor Exterior Shop According to Manufacturer Procedure 2003
Generator
Interior
Site SSPC-SP-10 P3 75 F1 200 F2 100 375 ---
Note (1)
2 Fuel Tank Ambient Indoor
2x
Exterior Site SSPC-SP-10 P3 70 F1 F2 120 390 1011
100
7035
EL Panel
3 Ambient Indoor Exterior Shop SSPC-SP-10 P4 75 F2 100 F7 50 180 or
6021
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 45 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
EXTERIOR
INDOOR/ SURFACE
SURFACE
TOTAL
NAME NTERIOR SITE INTER. FINISH
DFT
SERVICE PREPARATION PRIMER DFT DFT DFT
COAT COAT
SURFACE
Interior
Unloading P3 75 F1 200 F2 100 375 ---
3 Ambient Indoor Note (1) Site SSPC-SP-10
Fuel tank
Exterior P3 70 F1 2 x 100 F2 120 390 1015
Interior
P3 75 F1 200 F2 100 375 ---
Storage Tank
4 Ambient Outdoor Note (1) Site SSPC-SP-10
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 46 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
PREPARATION
EXTERIOR
INDOOR/
SURFACE
SURFACE
EQUIPMENT SHOP/
SURFACE/
ITEM RAL NO.
OUTDOOR INTERIOR
NAME SITE INTER. FINISH TOTAL
DFT
DFT
DFT
SERVICE PRIMER
SURFACE COAT COAT DFT
SSPC-
Interior SP5 F6 100 ---- ---- ---- ---- 100 ---
Air receiver
3 50 ºC Indoor Site
Tank
SSPC- 2x
Exterior P3 70 F1 F2 120 390 5015
SP10 100
Air
4 50 ºC Indoor Exterior Shop According to Manufacturer Procedure 5015
Compressor
2x
Indoor P3 70 F! F2 120 390 5015
100
Service air SSPC-
5 ambient Exterior Site
pipes SP10
2x
Outdoor P3 70 F! F5 70 340 5015
100
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 47 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
NAME SITE INTER. FINISH TOTAL
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT DFT
2x
Indoor P3 70 F1 F2 100 390 1018
Gas Pipe ( 100
1 Above ambient Exterior Site SSPC-SP-10
Ground) 2x
Outdoor P3 70 F1 F5 100 340 1018
100
Gas Pipe (
Indoor &
2 Under ambient Exterior Site SSPC-SP-10 ACCORDING TO BITUMINOUS INSULATION
Outdoor
Ground)
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 48 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 49 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
CATION
2 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
EXCHANGER
ANION
3 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
EXCHANGER
4 MIXED BED AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
ACTIVATED
5 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
CARBON VESSEL
DECARBONATOR
6 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
VESSEL
SULFURIC ACID
7 MEASURING AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 2004
TANK
SULFURIC ACID
8 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 2004
STORAGE TANK
CAUSTIC SODA
9 MEASURING AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 4005
TANK
CUSTIC SODA
10 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 4005
STORAGE TANK
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 50 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE C-8
WATER TREATMENT PLANT (Continued)
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
EXTERNAL
11 BACKWASH AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
TANK
ANTISCALANT
14 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 4005
DOSING TANK
CARTRIDGE
15 FILTER AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
VESSEL
CLEANING
16 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
TANK
SERVICE AIR
17 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 5015
PIPING
RAW &
COOLING
18 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 6010
WATER
PIPING
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 51 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE C-8
WATER TREATMENT PLANT (Continued)
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
SERVICE WATER
19 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 6011
PIPING
20 STEAM PIPING 250 ° C INDOOR EXTERIOR SITE SSPC SP10 P1 70 F4 30 F4 30 130 3000
SULFURIC ACID
21 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 2004
PIPING
HIGH PRESSURE
22 AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 5018
PUMP
DECARBONATOR
23 AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 5018
PUMP
SULFURIC ACID
24 AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 2004
DOSING PUMP
CAUSTIC SODA
25 AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 4005
DOSING PUMP
ANITI SCALANT
26 AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 4005
DOSING PUMP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 52 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE C-8
WATER TREATMENT PLANT (Continued)
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
SODIUM
BISULFITE
27 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 4005
DOSING
TANK
SODIUM
BISULFITE
28 AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 4005
DOSING
PUMP
SODIUM
29 BISULFITE AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 4005
PIPING
HEAT
30 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 9010
EXCHANGER
SULFURIC
ACID
31 UNLOADING AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 2004
& TRANSFER
PUMP
CUASTIC
SODA
32 UNLOADING AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 4005
& TRANSFER
PUMP
WATER
33 AMBIENT INDOOR
STORAGE
TANK INTRIOR SITE SSPC SP10 F6 100 F6 100 F6 100 300 -----
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 53 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE C-8
WATER TREATMENT PLANT (Continued)
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
POTABLE
EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
WATER
35 AMBIENT INDOOR
SURGE
TANK INTRIOR SITE SSPC SP10 F6 100 F6 100 F6 100 300 -----
SERVICE
EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
WATER
36 AMBIENT INDOOR
SURGE
INTRIOR SITE SSPC SP10 F6 100 F6 100 F6 100 300 -----
TANK
AIR
37 STORAGE AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 5012
TANK
POTABLE
38 WATER AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 6011
PUMP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 54 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE C-9
CONDENSATE POLISHING PLANT – PRECOAT
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
SLURRY
1 AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 1015
DOSING PUMP
SLURRY
2 CIRCULATION AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 1015
PUMP
HOLDING
3 AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 1015
PUMP
WASTE
4 AMBIENT INDOOR EXTERIOR According to Manufacturer Procedure 1015
WATER PUMP
AIR STORAGE
6 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 5012
TANK
PRECOAT
7 PREPARATION AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
TANK
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 55 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE C-9
CONDENSATE POLISHING PLANT – PRECOAT (Continued)
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
RAW
9 CONDENSATE AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
PIPING
POLISHED
10 CONDENSATE AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
PIPING
PRECOATING
11 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
PIPING
SERVICE AIR
12 AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 1015
PIPING
POTABLE 5012
14 WATER AMBIENT INDOOR EXTERIOR SITE SSPC SP10 P3 70 F1 2X100 F2 120 390 or
PIPING 6011
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 56 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE C-10
COOLING SYSTEM (ACC)
1 Main duct Max 120 °C Outdoor Exterior Site SSPC SP10 P1 70 F4 30 F4 30 130 1015
Condensate
2 Max 120 °C Outdoor Exterior Site SSPC SP10 P1 70 F4 30 F4 30 130 6018
Pipe
Air/Steam
3 Max 120 °C Outdoor Exterior Site SSPC SP10 P1 70 F4 30 F4 30 130 1015
vent Pipe
Condensate
4 Max 120 °C Outdoor Exterior Site SSPC SP10 P1 70 F4 30 F4 30 130 1015
storage tank
5 Fan Bridge Ambient Outdoor Exterior Site SSPC SP10 P1 70 F1 2*100 F5 70 340 1014
Cleaning
6 Max 45 °C Outdoor Exterior According to Manufacturer Procedure
Pump
ACC main
7 Ambient Outdoor Exterior Site SSPC SP10 P1 70 F1 2*100 F5 70 340 1014
structure
Wind break
8 Ambient Outdoor Exterior Site SSPC SP10 P1 70 F1 2*100 F5 70 340 1015
wall
According to
9 Ejectors Max 240 °C Indoor Exterior Manufacturer
Procedure
According to
Ejectors
10 Max 200 °C Indoor Exterior Manufacturer
condenser
Procedure
Condensate
pipe line to
11 Max 120 °C Outdoor Exterior Site SSPC SP10 P1 70 F4 30 F4 30 130 1015
ejector
condenser
According to
12 Fan gear box Ambient Outdoor Exterior Manufacturer
Procedure
13 Hoist Ambient Outdoor Exterior Site SSPC SP10 P1 70 F1 2*100 F5 70 340 1015
14 Elevator Ambient Outdoor Exterior Site SSPC SP10 P1 70 F1 2*100 F5 70 340 1015
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 57 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
Tube bundles
15 Ambient Outdoor Exterior Site SSPC SP10 P1 70 F1 2*100 F5 70 340 1014
steel structure
16 Hot well Max 120 °C Outdoor Exterior Site SSPC SP10 P1 70 F4 30 F4 30 130 1015
18 Steam pipe Max 120 °C Outdoor Exterior Site SSPC SP10 P1 70 F4 30 F4 30 130 1015
Ejector motive
19 steam Pipe Max 240 °C Outdoor Exterior Site SSPC SP10 P1 70 --- --- --- --- 70 ----
(Insulated)
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 58 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 59 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE D-1
HRSG / BOLER & ACCESSORIES
EXTERIOR
TEMPERATURE INDOOR/ PAINTING SYSTEM
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
NAME SURFACE SITE INTER. FINISH
TO
TA
DF
DF
DF
DF
PRIMER
T
SERVICE SURFACE COAT COAT
HP STEAM
1 DRUM 520 °C OUTDOOR EXTERIOR SHOP SSPC SP10 P1 75 --- --- --- 75 ---
(INSULATED)
LP STEAM
2 DRUM 230 °C OUTDOOR EXTERIOR SHOP SSPC SP10 P1 75 --- --- --- 75 ---
(INSULATED)
BLOWDOWN
& STORAGE
3 250 °C OUTDOOR EXTERIOR SHOP SSPC SP10 P1 75 --- --- --- 75 ---
TANK
(INSULATED)
DEAREATOR
4 180 °C OUTDOOR EXTERIOR SHOP SSPC SP10 P1 75 --- --- --- 75 ---
(INSULATED)
UP TO 400 °C INDOOR EXTERIOR SHOP SSPC SP10 P1 75 --- --- --- 75 ---
LINK &
MANIFOLDS
5 400 °C < T <
(INSULATED) INDOOR EXTERIOR SHOP SSPC SP10 F4 30 --- --- --- 30 ---
500 °C
PIPING 2X
6 < 90 °C OUTDOOR EXTERIOR SHOP SSPC SP10 P3 70 F1 F5 70 340 NOTE
NON
100
INSULATION
PIPING
7 90 – 400 °C OUTDOOR EXTERIOR SHOP SSPC SP10 P1 70 F4 30 F4 30 130 9006
NON
INSULATION
CASING 2X
< 90 °C OUTDOOR EXTERIOR SHOP SSPC SP10 P3 70 F1 F5 70 340 9006
(CASING 100
PLATE, TOP
9
CASING,
T<400 °C INDOOR INTERIOR SHOP
COLUMN SSPC SP10 P1 75 --- --- --- 75 ---
INSULATED
&GIRDER)
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 60 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 61 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PAINTING SYSTEM
EXTERIOR
TEMPERATURE INDOOR/
EQUIPMENT SHOP/
SURFACE/ SURFACE RAL
ITEM OF THE
OUTDOOR INTERIOR PREPARATION NO.
TOTAL
NAME SITE INTER. FINISH
DFT
DFT
DFT
DFT
SURFACE PRIMER
SERVICE SURFACE COAT COAT
PLATE
FORM
13 STRUCTURE < 90 °C OUTDOOR EXTERIOR HOT DIPPED GALVANIZED
(GRATING&
TREADS)
PLATFORM
STRUCTURE
(HANDRAIL,
POST&TOP
14 < 90 °C OUTDOOR EXTERIOR HOT DIPPED GALVANIZED
PLATE,
SAFETY
CAGE &
LADDER)
GAS DUCT 2X
< 90 °C OUTDOOR EXTERIOR SSPC SP10 P3 70 F1 F5 70 340 9006
(INLET 100
DUCT,
OUTLET SHOP
15 DUCT, T<400 °C INDOOR INTERIOR SSPC SP10 P1 75 --- --- --- 75 ---
COLUMN & INSULATED
GIRDER)
STACK
SHELL (TOP
16 90 – 400 °C OUTDOOR EXTERIOR SITE SSPC SP10 P1 70 F4 30 F4 30 130 9005
OF BOILER
CHIMNEY)
STACK
SHELL
3000 &
17 (UNEDR 90 – 400 °C OUTDOOR EXTERIOR SITE SSPC SP10 P1 70 F4 30 F4 30 130 9010
THE
BLACK)
STACK
INDOOR INTERIOR SITE SSPC SP10 P1 75 --- --- --- 75 ---
SHELL
(UNDER
18 90 – 400 °C
THE
OUTDOOR EXTERIOR SITE SSPC SP10 P1 70 F4 30 F4 30 130 5007
ENCIRCLED
BANDS)
STACK
INDOOR INTERIOR SHOP SSPC SP10 P1 75 --- --- --- 75 ---
19 90 – 400 °C
(BREECH
DUCT) OUTDOOR EXTERIOR SHOP SSPC SP10 P1 70 F4 30 F4 30 130 9006
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 62 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
STACK
(HANDRAIL,
21 < 90 °C OUTDOOR EXTERIOR HOT DIPPED GALVANIZED
POST & TOP
OF PLATE)
Note:
In case of client request for corrosive environment, P1 could be applied instead of P3.
Final color shade of steel structure, piperack and platform selected from TAVANIR STANDARD RAL for
common areas.
DFT of steel structure, piperack, platform, duct, casing are selected according to common environmental
area.
Temporary primer will apply on stack shell on shop (in case of client request) for protection during
transpiration & storage in site before installation. Final paint will apply according to item 16, 17, and 18 of
above table.
Piping final shade will be according to project line plan.
All equipments (pump, silence, instrumental equipments and …) shall be painted according to
manufacturer standard.
Harp & finned tubes coated with temporary primer according to manufacturer standard.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 63 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
SECTION B :
APPENDIXES
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 64 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
Plant /Equipment
Date : Temperature :
et pressure cleaning:
Applied method:
Remarks :
Corrective Action:
Final inspection:
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 65 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
Primer ……………………………...….DFT
Required painting system as specification:
Midcoat……………………………...…DFT
Topcoat ……………………..……..…DFT
Final Inspection :
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 66 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
APPENDIX 2
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 67 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
1- ELECTRICAL EQUIPMENTS
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 68 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
7- 11/20 KV Generator’s
RAL 1018 Zinc yellow
outgoing line
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 69 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
3- The color for all equipments and interconnecting indicator lines for steam and water
cycles mimics in control room shall be exactly similar to the related equipment and
installations color shades specified in this standard.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 70 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
1- Condenser, Drain cooler, Gland steam condenser & Air ejector RAL 6018 Yellow green
White
2- Various heaters RAL 9006
aluminium
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 71 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 72 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
20- Sewage treatment tank and equipment RAL 7006 Beige grey
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 73 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
22- If the body of chemical storage tanks is made of stainless steel and resistant to chemicals (items 7 thru 16) ,
then indication the name of chemical on the tank with specified color will be sufficient.
Indication the name of chemical material RAL 9010 Pure white
24- Feed water storage tanks for boiler with insulation of aluminum sheets
Indication of “Feed water tank” RAL 6018 Yellow green
26- Elevated water storage tanks shall paint with red and white in checkered RAL 9010 Pure white
patterns. RAL 3000 Flame red
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 74 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
White
31- Air ducts, without insulation RAL 9006
aluminium
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 75 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
14- Super heated steam piping (S.H.), insulated with aluminum sheets:
- Three red color bands RAL 3000 Flame red
- One arrow in the direction of
RAL 3000 Flame red
fluid flow
- “S.H.” indication on the pipe RAL 3000 Flame red
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 76 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
16- Other saturated & super heated steam piping; insulated with aluminum sheets:
One red colored band RAL 3000 Flame red
One arrow in direction to
RAL 3000 Flame red
fluid flow
17- Warm & hot distillated piping, insulated with aluminum sheets:
One arrow in direction to
RAL 6018 Yellow green
fluid flow
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 77 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 78 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
26- Feed water piping for boiler, insulated with aluminum sheets:
- Arrow in the direction of
flow in specified RAL 6018 Yellow green
color
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 79 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 80 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 81 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 82 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
With one indicating sign in the form of a RAL 1018 Zinc yellow
circle or line
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 83 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
With one indicating sign in the form of a RAL 6010 Grass green
circle or line
With one indicating sign in the from of a RAL 9010 Pure white
circle or line
With one indicating sign in the from of a RAL 2003 Pastel orange
circle or line
With one indicating sign in the from of a RAL 9010 Pure white
circle or line
With one indicating sign in the from of a RAL 9010 Pure white
circle or line
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 84 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 85 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 86 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
3- The top of the boiler chimney (under the black color) must be painted in red (RAL 3000) and
white (RAL 9010) color in encircled bands pattern alternatively.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 87 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
First Alternative:
- Steel structures RAL 5007 Brilliant blue
- Coating of walls and roofs RAL 7035 Light grey
Second Alternative
- Steel structures RAL 1002 Sand yellow
- Coating of walls and roofs RAL 1015 Light ivory
Third Alternative
- Steel structures RAL 6025 Fern green
- Coating of walls and roofs RAL 6019 Pastel green
The painting of steel structures for desalination plant, auxiliary boilers evaporators shall be
compatible with geographical and environmental conditions.
Note:
In order to coordinate the apparent color of buildings and boiler structure, machine hall, turbine hall
and desalination plants structure evaporators and auxiliary boilers of new established
equipment that are to be built besides the installed units; their apparent color shall
exactly be compatible with each other.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 88 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
- Piping up to 300 mm diameter shall be painted with a band with 150 mm width at least.
- Piping with more than 300 mm diameter shall be painted with a band with 200 mm width at least.
Up to 50 20
50-100 25
100-150 38
150-225 50
225-300 75
300-600 100
More than 600 150
The position to create indicator signs, including of bands and/or arrows shall be as below:
- The indicator signs shall be drawn at the most important points, such as: branches, flange connections
, withdrawal points, points related to measuring equipments, line crossings from the structure walls,
walls or floors, entrances and exits of the buildings, ….
- The arrow shall be in the same direction with the fluid flow.
- If the piping and/or tank has been insulated, the band or arrow width shall be determined considering
its external diameter.(including the insulation)
When it is necessary to insert the tank’s name onto its external surface and/or create an indicator sign band,
the way to mark on it shall be as below:
- The band thickness shall be 1/20 ratio of the total tank height.
- The band shall be created at 1/3 ratio of the top part of the tank.
- The tank’s name shall be written in one or two direction(s) of the tank as the following:
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 89 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
3) The height of each letter -proportional to the height of the tank- shall be as the follows:
a) For tanks with less than 1.5 m height, the height of each letter shall be 1/10 ratio of the
totally tank height.
b) For tanks with more than 1.5 m height, the height of each letter shall be 1/12 ratio of the
totally tank height.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 90 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
SECTION C:
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 91 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PART (I)
Our standard painting cycle, fulfilling requirements, is also specially devoted to industrial, marine and desert
environment.
It consists in a two components epoxy resin corrosion-proof cycle.
After degrease by solvent to remove any trace of oil or grease, apply a two components epoxy primer for concrete
surfaces, with high abrasion-resistance in environments with operating temperatures not exceeding 80 °C.
Total thickness of the coat 200 microm.
3. BOARDS
Painting carried out with epoxy polyester powder paint through electrostatic painting machines.
4. PAINTING APPLICATION
For Generator and Sound-proof enclosure, painting will be according to "General specification for corrosion-proof
painting”(Part (II)). Final painting at site will be according to item 8.1.
a. Generator
Workshop On site
Primer X
Intermediate X
Final X
Workshop On site
Primer X
Intermediate X
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 92 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
b. Boards
Workshop On site
Painting application X
5.External surface painting technical data sheet :
5.1 External surface painting at workshop :
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 93 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
* Using of both mentioned RALs are permitted, but all generators in a specified powerhouse should have
the same painting RAL.
Note : All paint layers of components should be purchased from one supplier, It means if the supplier
Was changed all paint layers must be chamnged according to the new specification of the new supplier.
(1):To be defined by the Client. If not otherwise notified withen 60 days, the final painting will be carried out with
RAL 2003
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 94 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
PART (II)
General specification for corrosion-proof painting
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 95 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE OF CONTENTS
1. GENERAL
2. STANDARDS AND REFERENCE DOCUMENTATION
3. INSTRUCTION FOR THE SURFACE PREPARATION AND THE PAINTING
4. WORKED SURFACES
5. PAINTING CYCLES IN THE WORKSHOP
6. SURFACES PREPARATION
7. RETOUCHES
8. FINAL PAINTING AT SITE
9. THICKNESS OF THE PAINTS
10. MATERIALS LIST
11. MAINTENANCE
12. CHECKS
13. PAINTING QUALITY CONTROL AND TESTS AT SITE
14. TECHNICAL DOCUMENTATION
15. QC TABLES
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 96 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
1. GENERAL
The present specification contains the instructions for the surfaces preparation and for the application of the
products, the painting cycles and the checks regarding the anticorrosive protection of the electrical equipment.
3.2 MATERIALS
The relevant technical specifications of the Supplier or the corresponding P.G. have to be available for all the
paints and the thinners used; these documents have to be
The tin containing the paints and the thinners have to be kept at the correct temperature
The containers have not to be opened until the moment to be used.
The paints being coagulated, slimy or somehow defective, when opening the container, have to be rejected.
If a thin film is on the paint surface, the paint can be used after having removed this film. Until they are
homogeneous, without streaking or vein of a different color on the surface. According to the instructions of the
paints Supplier.
As regards the bicomponents, the two components have to be controlled and then separately mixed;
subsequently, the two components have to be mixed slowly together. If the paint is thickened and cold, before
adding the eventual thinner, it has to be brought it is not allowed to add thinner in a quantity higher than that one
established by the supplier.
The bicomponent paints having a limited pot-life, have to be used within the period specified by the paints
Supplier.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 97 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
3.3.4 Sandblasting
This method consists in siliceous sandblasting or dry metallic shot.
The sandblasting has to be carried out in accordance with ISO 8501-1-1988 standard. Type and grade of
sandblasting has to be those one indicated in the following items. Relevant quantities of oil, grease and other
polluting substances have to be previously removed by cleaning with thinners, as per item 3.3.2.
The sandblasting is allowed only if the surfaces to be sandblasted have a temperature at least 3°C higher than the
condensate temperature of the atmospheric humidity. The compressed air used for the sandblasting has to be free
from water and oil. To this purpose suitable separators and filters have to be foreseen. The sandblasting operation
has to be followed by dusting with dry and clean compressed. Particular care has to be put while cleaning the
recesses of the structure, in order to eliminate, before painting, any trace of sand, shot, oil, welding pearls etc.
The structure recesses, which due to their particular configuration cannot be completely cleaned from the
residuals of the sandblasting process, have to be duly closed and protected before the sandblasting itself.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 98 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
3.3.5 Zinc-coating
The electrogalvanic protection by means of zinc coating has to be carried out in accordance with the standards
F4203 “Electrogalvanic finishing. General prospect” and F4231 “Surface treatment of metallic materials. Zinc-
coating on ferrous materials”. The coating have to be “heavy” type, suitable for outdoor installation, in
industrial, sea and tropical environment, with minimum coating thickness of 50 μm. In no point of the treated
area, the coating thickness has to be less than the minimum prescribed value. After the zinc coating, the protected
surfaces have to undergo to one of following posttreatment:
- coating with nitric polishing, with subsequent application of mineral oils, wax, silicon, in order to
keep the surface polish and to avoid the creation of “white rust”;
- coating with chromic polishing treatment;
- coating with chrome treatment.
3.4 PAINTWORK
The paintwork can be done by brush, by spray with or without air or by matching these methods together, in any
case always according to the instructions of the paint Supplier. The paintwork has to be carried out by skilled
personnel. The thickness of the different paint coats has to be uniform and the painted surface has to be free from
brush signs, sagging, irregularities or any other defect. Surfaces with evident traces will be rejected. The polished
or the machined surfaces, the instruments boards, the valves stems, the threading, the motor and the pump shafts
and all the other movable parts, the sealing, the identification plates and the glass parts have to be protected with
adhesive tape or similar means.
If weldings have to be done on the painted parts, the paint has to be removed for 5 cm around the edges to be
welded. These areas have to be protected by taping. At the end of the paintwork, al the protections listed above
have to be removed. All the paints lying on said parts have to be removed. During the paintwork, take care of
angles, slots and areas difficult to be reached. When the paintworks happen at the same time of other operations,
carry out all the expedients necessary to avoid the paints still not dried to be polluted by dust.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 99 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
3.4.5 Retouch
If the surfaces show abrasions due to the transport and assembly operations, it is necessary to carry out the duly
retouches, before proceeding with the subsequent paintworks. Therefore, after preparing the surfaces as
indicated in item 3.3, the damaged surface has to be glass-papered with fine glass paper and the dust has to be
removed with brushes or clean compressed air jets. Now it is possible to lay on it the paint coat necessary to
have the damaged surface in the whole conditions. Are rust traces present on the surface, they have to be
removed by brushing with metallic brushes. Respect the prescribed drying time, dilution and dry film thickness
also for the retouches. During this operation, take care not to damage the intact painted parts. Should the
defective or damaged areas be more than 30% of the total painted surface, normally the protective coat has to be
completely removed and it is necessary to proceed Purchaser.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 100 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
3.6 Checks
When the surfaces to be painted have welding seams, before painting them, make sure the checks foreseen for the
welds have been carried out. For the checks on the paints, please refer to item 12.
4. MACHINED SURFACES
All the machined surfaces are protected by means of temporary protections, according to the relevant materials
lists.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 101 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 102 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE2
protective Retouch
Coat
Casings
Internal surface x x
External surface x x x
Coolers
External surfaces x x x
Assembly tools x x x
Transport tools x x
Soundproofing covers
External surfaces x x x
Instruments boards and cubicles x x
Turboalternator rotors x x
Vent ducts in the baseplates x
Partial retouches of the previous paint coat are foreseen before each paintwork, if these areas are damaged.
(1): Is valid only for casings delivered completely assembled.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 103 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
5.1 CYCLE A
Anticorrosive cycle for installation outdoor, in industrial, sea or desert environment, with working temperature
not higher than 70°C. After the surface preparation according to table 1, carry out the paintwork. The material of
paints is acc. to part 1 Sec. 5.
5.2 CYCLE B
Anticorrosive cycle for surfaces completely submerged in lubricating oil, with working temperatures not higher
than 80°C.
After the surface preparation according to table 1, carry out the paintwork as follows:
5.3 CYCLE C
After the surface preparation according to table 1, carry out the paintwork as follows:
5.4 CYCLE D
Anticorrosive cycle for the surfaces submerged in water, valid both for fresh and seawater, with working
temperature not higher than 60°C. After the surface preparation according to table 1, carry out the paintwork as
follows:
5.5 CYCLE E
Anticorrosive cycle for outdoor installation, in industrial, sea or desert environment. After the surface preparation
according to table 1, carry out the paintwork as follows:
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 104 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
5.6 CYCLE F
Anticorrosive cycle for installation outdoor, in industrial, sea or desert environment, with working temperature not
higher than 70°C. The cycle consists of primer, intermediate and finishing coat. Products and thickness of the
cycle according to Supplier’s standard. The finishing colour is defined by the relevant materials list. The colors of
the three paint coats have to be different.
5.7 CYCLE G
Cycle for concrete surfaces, with high resistance to abrasion, in environment with working temperature not higher
than 80°C. After the surface preparation according to table 1, carry out the paintwork as follows:
5.8 CYCLE H
5.8.1 Worked rotor
The worked rotor has to be painted according to diagram in fig. 1, after the surface preparation as per table 1.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 105 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 106 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
FIGURE 1
WORKED ROTOR – PAINTWORK DIAGRAM
Position 1 : one primer coat
Position 2 : one primer coat and one finishing coat
Position 3 : one temporary protective coat
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 107 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
FIGURE 2
FINISHED ROTOR – PAINTWORK DIAGRAM
Position 1: one primer coat
Position 2: one finishing coat
Position 3: one temporary protective coat
Retaining rings : do not paint
Centering rings : one primer coat and one finishing coat
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 108 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
5.9 CYCLE L
As regards the loosen components, as motors, pumps, instruments etc., already painted, is valid the standard cycle
of the Supplier.
5.10 CYCLE M
Galvanic protection by means of zinc-coating, with surface treatment with mineral oils, wax, silicon, in order to
keep the surface polish and to avoid the creation of “white rust”. As alternative, surface passivation with chrome
acid. Minimum protection thickness 50µm.
6. SURFACE PREPARATION
Hereunder we list the surface preparation grades requested by the painting cycles described in item 5.
6.1 PREPARATION P1 TYPE
Very careful sandblasting until nearly white metal, according to standard ISO 8501-1- 1998, grade SA 2½.
The surface eventually welded after the sandblasting, have to be carefully cleaned by brushing. Remove any trace
of oil or grease by means of thinner.
7. RETOUCHES
Before each paintwork, carry out the retouches necessary to the previous paint coat, if these areas are damaged.
As regards the retouches, act as indicated in item 3.4.5 regarding the surface and the cleaning preparation. In
any case, before the delivery to the site, the external surfaces of the casings supplied completely assembled,
undergo to following treatment, as final retouch.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 109 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
TABLE3
MINIMUM THICKNESS OF THE DRY FILM (mm)
Cycle in workshop Finishing Total
at site thickness
Primer Intermediate Finishing Retouch
B 25+25 50
D 200 200 ( 2 )
E 60 100 40 200
G 200 200
H 30 30 60
(1): Only for casings delivered completely assembled, we have foreseen
a complete retouch coat, before the shipment, with added thickness of 100 mm.
(2): Referred only to painting with tar epoxy resin, as per item 5.4.1
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 110 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
10.3.3 *Epoxy- polyamidic bicomponent Primer, oxide red colour, air drying
MAPNA Generator (PARS) table: TN 54310.3125
Finishing: with paint as per item 10.4.3
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 111 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
11. MAINTENANCE
As regards the revision processes, before the components re-painting, the surfaces to be applicable), brushing,
thinners.
12. CHECKS
12.1 GENERAL
The instructions included in this item, together with those one included in the Inspection and Test Plan of the
Order, refer to the checks and the certificates necessary to verify the anticorrosive coating.
12.2 PAINTING CYCLE
The painting cycle is that one prescribed in the present anticorrosive painting Specification.
12.3 CHECKS C/O THE SUBSUPPLIER
12.3.1 Check of the protective coating
The protective paintwork has to agree with the requirements of the present anticorrosive painting
Specification. It is to verify the congruence between the painting Specification and the protective paintwork,
controlling the documentation relevant to the painting issued by the Subsupplier.
Cycles or products different from those listed in the painting Specification are not allowed. The result of the
test has to be certified.
12.3.2 Check of the protective coating adhesion
It is to be carried out by squaring off the surface as per DIN 53151 standard, impressing the blades with
regular pressure until the metal. The measuring points have to be 4, spot chosen on the whole painted surface.
For each measuring point, it is not allowed an alteration grade higher than Gt2, corresponding to a breakaway
of the squared off surface. The results of the test have to be certified.
12.3.3 Check of the protective coating total thickness
The total thickness of the coating has to be measured in correspondence of 8 points, spot chosen on the whole
painted surface. In no measuring point, a thickness of the dry film lower than that one prescribed in the present
painting Specification is allowed. The test has to be carried out by means of a portable thickness gauge,
according to DIN 50984 standards. The results of the test have to be certified.
12.3.4 Visual check
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 112 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 113 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
15. QC TABLES
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 114 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
SECTION D:
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 115 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
A. Scope
This Specification Covers The General Characteristics For Painting Of The Aluminium Bus
Ambient Conditions
Working Temperature,
Conductor : 105 °C
Enclosure : 80 °C
B. Technical Characteristics
For The Best Quality Of Coating The Below Procedure Must Be Covered Before
Applying Every Coating Layer :
2: Deterjent The Alminium With 0.5/1000 Dry NaOH & 2.5 /1000 Detergent
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 116 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
5: Perfect Drying With Clean Air Blasting ( The Air Blasting Must Be Dust, Oil And Water Free )
- Chemical Composition
- Physical Properties
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 117 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
- Application Details
Mixing Ratio: Comp. A, 100 Parts By Weight; Comp. B,20 Parts By Weight
Mix Comp.A Thoroughly With a Suitable Mixer, Then Add
Comp.B Slowly And Mix Well For 10 Minutes
Salt Spray Test (7 Days After Painting) ASTM B 117 500 hrs
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 118 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
SECTION E:
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 119 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
2.Refrence standards
RAL color 7035
Brightness DIN 2813
Scratch DIN 2409
Flexibility DIN 1520
Impact DIN 6272
Bending DIN 6860
Hardness DIN 53153(only applicable for wet painting)
3. Execution method
For covering the surface of the parts, following steps should have done:
Process control Process Definition No
Controlling the solution temperature Immersion in 5% flensing 3.1.1
twice in a work day and island solution by 65-75°C in about
testing in the form that after 10-15 minute.
emersion from the tub and rinsing
any water drop should not remain an
the part. and in the case of island test
rejection , 25Kg of flensing material
must added to the solution
Controlling the cleaner of water Rinsing In water tube by 3.1.2
tube and non existence of smeary on normal temperature or 40-60°C
the surface of water
Controlling the solution temperature Immersion in 2.5-3% ferrous 3.1.3
twice per day and Ph test once per phosphate by PH=2.5-3.5 and
day. (If PH is upper than 3.5, for 55-65°C temperature in about
each degree 25kg phosphate solution 3 to 5 minute. (The part should
must added to the tub.) change from violet to seven
color.)
Controlling the cleaning of water tub Rinsing in water tube by 3.1.4
and non existence of smeary on the normal temperature or 40-60°C
surface of water.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 120 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
Note1: Changing the tub solution will happen when the approximate value of flensing or adding
phosphate will be as much as primary materials value.
Note2: To become sure that the temperature which is shown by thermostats is precise, tube
temperature should controlled by a calibrated thermometer.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 121 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 122 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
3.3.1 FOR PERFORMING THE JOB FOLLOWING STEPS SHOULD FOLLOWED CAREFULLY
-First start the color cabin until all discharging the color from filters , then open the filters and wind
them.
-Discharge the color tank of spray system and wind it.
-Open the spray system gun and clean accessible parts and wind the related pipe to gun.
-Shave the colored stick to the cabinet's walls and then wind whole of it.
-Discharge the color bucket under the color cabin and wind it.
-After all assemble the filters again, now the spray system is ready to work.
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 123 of 124
CLIENT: CONSULTANT:
MAPNA GENAVEH MESSINAN ENGINEERING Co.
POWER GENERATION Co Eng. & Consultancy of Power Plant & Ind.
MAPNA GROUP
EPC CONTRACTOR :
Doc. No.: ISP/GV-00/GN-W-00-PW2-002 Rev:B
MAPNA GROUP
DOC TITTLE : Painting Technical Specifications File No.:
Based on:
ﻃﺮح ﻧﻴﺎم
CONTRACTOR DOC. NO. :
Page 124 of 124