You are on page 1of 59

o

Contract: SMK1&2/EPSCI COMPANY Document N


Main Stupa (SP1) Platform – Instrument Hook Up Drawings ID-SMK-MS-2045-173001
(Process, Pneumatic & Hydraulic) Revision: A Status: IFC
Doc type: DRW Syst./S-Syst.: Discipline: INS Revision Date: 26-JAN-2011
o
Originator Document N Page 1 of 59

SOUTH MAHAKAM FIELD DEVELOPMENT


PROJECT PHASE 1&2
SMK1&2/EPSCI
PT. NISCONI

This document has been generated by an Electronic Document Management System. When it its printed, it shall be considered as “For information only copy”. The
controlled copy is the screen version, and thus, it is the holder’s responsibility to make sure that he/she holds the latest valid version.

Main Stupa (SP1) Platform


Instrument Hook Up Drawings
(Process, Pneumatic & Hydraulic)

A 26-JAN-2011 IFC Issued For Comment ANT/BGS MTA/KVA JM


Rev. Date Status Revision Memo Issued Checked Approved COMPANY

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-173001_RevA
o
Contract: SMK1&2/EPSCI COMPANY Document N
Main Stupa (SP1) Platform – Instrument Hook Up Drawings ID-SMK-MS-2045-173001
(Process, Pneumatic & Hydraulic) Revision: A Status: IFC
Doc type: DRW Syst./S-Syst.: Discipline: INS Revision Date: 26-JAN-2011
o
Originator Document N Page 2 of 59

TABULATION OF REVISED PAGES


REVISIONS REVISIONS
SHEET SHEET
A B C D E F G H A B C D E F G H
1 X 51 X
2 X 52 X
3 X 53 X
4 X 54 X
5 X 55 X
6 X 56 X
7 X 57 X
8 X 58 X
9 X 59 X
10 X 60
11 X 61
12 X 62
13 X 63
14 X 64
15 X 65
16 X 66
17 X 67
18 X 68
19 X 69
20 X 70
21 X 71
22 X 72
23 X 73
24 X 74
25 X 75
26 X 76
27 X 77
28 X 78
29 X 79
30 X 80
31 X 81
32 X 82
33 X 83
34 X 84
35 X 85
36 X 86
37 X 87
38 X 88
39 X 89
40 X 90
41 X 91
42 X 92
43 X 93
44 X 94
45 X 95
46 X 96
47 X 97
48 X 98
49 X 99
50 X 100

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-173001_RevA
o
Contract: SMK1&2/EPSCI COMPANY Document N
Main Stupa (SP1) Platform – Instrument Hook Up Drawings ID-SMK-MS-2045-173001
(Process, Pneumatic & Hydraulic) Revision: A Status: IFC
Doc type: DRW Syst./S-Syst.: Discipline: INS Revision Date: 26-JAN-2011
o
Originator Document N Page 3 of 59

COMMENTS RESPONSE SHEET


DOCUMENT REF.:

Document/
No Company Comments Contractor Response Initial Remarks
Page Ref.

REVISION DETAIL TABULATION

DATE PAGE REVISION REVISION DETAILS

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-173001_RevA
o
Contract: SMK1&2/EPSCI COMPANY Document N
Main Stupa (SP1) Platform – Instrument Hook Up Drawings ID-SMK-MS-2045-173001
(Process, Pneumatic & Hydraulic) Revision: A Status: IFC
Doc type: DRW Syst./S-Syst.: Discipline: INS Revision Date: 26-JAN-2011
o
Originator Document N Page 4 of 59

TABLE OF CONTENTS
COVER ................................................................................................................................................................... 1
TABULATION OF REVISED PAGES.................................................................................................................... 2
TABULATION OF REVISED PAGES.................................................................................................................... 3
TABLE OF CONTENTS ......................................................................................................................................... 4
TABLE OF CONTENTS ......................................................................................................................................... 5
GENERAL NOTES................................................................................................................................................. 6
CODIFICATION 1/4................................................................................................................................................ 7
CODIFICATION 1/4................................................................................................................................................ 8
CODIFICATION 2/4................................................................................................................................................ 9
CODIFICATION 3/4.............................................................................................................................................. 10
FLOW TRANSMITTER GAS SERVICE (ORIFICE TYPE) .................................................................................. 11
ULTRASONIC FLOW METER ............................................................................................................................. 12
PRESSURE INDICATOR PIPE SERVICE........................................................................................................... 13
PRESSURE INDICATOR PIPE SERVICE (VERTICAL MOUNTED) .................................................................. 14
PRESSURE INDICATOR HORIZONTAL SERVICE ........................................................................................... 15
PRESSURE INDICATOR VERTICAL SERIVCE................................................................................................. 16
PRESSURE TRANSMITTER GAS SERVICE ..................................................................................................... 17
PRESSURE TRANSMITTER LIQUID SERVICE................................................................................................. 18
PRESSURE TRANSMITTER GAS SERVICE (ANNULUS SERVICE) ............................................................... 19
PRESSURE TRANSMITTER GAS SERVICE (CHRISMAS TYPE) .................................................................... 20
PRESSURE DIFFERENTIAL TRANSMITTER GAS SERVICE .......................................................................... 21
DIFFERENTIAL PRESSURE TRANSMITTER – PRESSURE SAFETY VALVE................................................ 22
TEMPERATURE GAUGE PIPE SERVICE .......................................................................................................... 23
TEMPERATURE GAUGE VESSEL SERVICE.................................................................................................... 24
TEMPERATURE INDICATING TRANSMITTER CHRISTMAS SERVICE (REMOTE MOUNTED).................... 25
TEMPERATURE INDICATING PIPE 600# RF SERVICE (LOCAL MOUNTED) ................................................ 26
TEMPERATURE INDICATING PIPE 300# RF SERVICE (LOCAL MOUNTED) ................................................ 27
TEMPERATURE INDICATING PIPE 300# RF SERVICE (REMOTE MOUNTED) ............................................. 28
TEMPERATURE TRANSMITTER VESSEL SERVICE ....................................................................................... 29
LEVEL GAUGE STAND PIPE ............................................................................................................................. 30
LEVEL GAUGE VERTICAL VESSEL (SIDE - SIDE VESSEL CONNECTION) ................................................. 31
DISPLACER LEVEL TRANSMITTER ................................................................................................................. 32
DP TYPE CAPILLARY LEVEL TRANSMITTER (STAND PIPE) ........................................................................ 33
DP TYPE CAPILLARY LEVEL TRANSMITTER (VESSEL CONNECTION) ...................................................... 34
LEVEL TRANSMITTER (RADAR TYPE TOP MOUNTED)................................................................................. 35
CONTROL VALVE GAS INSTRUMENT SUPPLY AND GAS VENTING ........................................................... 36
CHOKE VALVE GAS INSTRUMENT SUPPLY AND GAS VENTING ................................................................ 37
SPARE SHEET .................................................................................................................................................... 38
ON - OFF VALVE WITHOUT PARTIAL STROKING .......................................................................................... 39
ON - OFF VALVE WITHOUT PARTIAL STROKING .......................................................................................... 40
ON - OFF VALVE WITH PARTIAL STROKING .................................................................................................. 41
ON - OFF VALVE WITH PARTIAL STROKING .................................................................................................. 42
SPARE SHEET .................................................................................................................................................... 43
WELLHEAD WING VALVE - WV FOR 10,000 PSI WELLS ............................................................................... 44
WELLHEAD MASTER VALVE - SSV FOR 10,000 PSI WELLS ........................................................................ 45
WELLHEAD DOWN HOLE VALVE - DHSV FOR 10,000 PSI WELLS .............................................................. 46
BULKHEAD PLATE FOR WV, SSV SUPPLY/RETURN & DHSV SUPPLY FOR 10K PSI WELLS ................. 47
CORROSION INHIBITOR TUBING ..................................................................................................................... 48
PIG INDICATOR INTRUSIVE TYPE.................................................................................................................... 49
PIG INDICATOR NON INTRUSIVE TYPE........................................................................................................... 50
STANDARD SAMPLE CONNECTION ................................................................................................................ 51
EROSSION MONITORING SYSTEM .................................................................................................................. 52
MAIN STUPA MAIN DECK FUSIBLE PLUG LOOP ........................................................................................... 53
MAIN STUPA CELLAR DECK FUSIBLE PLUG LOOP...................................................................................... 54
MAIN STUPA SUSPENDED DECK FUSIBLE PLUG LOOP.............................................................................. 55
METHANOL INJECTION PACKAGE .................................................................................................................. 56

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-173001_RevA
o
Contract: SMK1&2/EPSCI COMPANY Document N
Main Stupa (SP1) Platform – Instrument Hook Up Drawings ID-SMK-MS-2045-173001
(Process, Pneumatic & Hydraulic) Revision: A Status: IFC
Doc type: DRW Syst./S-Syst.: Discipline: INS Revision Date: 26-JAN-2011
o
Originator Document N Page 5 of 59

BIOCIDE INJECTION PACKAGE ....................................................................................................................... 57


INTRUSION DETECTION SYSTEM .................................................................................................................... 58
CORROSION INHIBITOR TUBING ..................................................................................................................... 59

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-173001_RevA

You might also like