SOUTH MAHAKAM FIELD DEVELOPMENT


PROJECT PHASE 1&2
SMK1&2/EPSCI
PT. NISCONI
This document has been generated by an Electronic Document Management System. When it its printed, it shall be considered as “For information only copy”. The
controlled copy is the screen version, and thus, it is the holder’s responsibility to make sure that he/she holds the latest valid version.

Main Stupa (SP1) Platform – Pneumatic Instruments Gas


Consumption Calculations

D 05-JAN-2011 AFC Approved For Construction ADB/BGS KVA JM


C 10-NOV-2010 IFA Issued For Approval BGS KVA JM
B 06-OCT-2010 IFC Issued For Comment BGS KVA JM
A 12-AUG-2010 IFC Issued For Comment BGS MRO/KVA JM
Rev. Date Status Revision Memo Issued Checked Approved COMPANY

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Doc type: CAL Syst./S-Syst.: Discipline: INS Revision Date: 05-JAN- 2011
o
Originator Document N Page 2 of 13

TABULATION OF REVISED PAGES

REVISIONS REVISIONS
SHEET SHEET
A B C D E F G H A B C D E F G H
1 X 51
2 X 52
3 X 53
4 X 54
5 X X X X 55
6 X X X X 56
7 X X X 57
8 X 58
9 X X X X 59
10 X 60
11 X 61
12 X X 62
13 X X 63
14 64
15 65
16 66
17 67
18 68
19 69
20 70
21 71
22 72
23 73
24 74
25 75
26 76
27 77
28 78
29 79
30 80
31 81
32 82
33 83
34 84
35 85
36 86
37 87
38 88
39 89
40 90
41 91
42 92
43 93
44 94
45 95
46 96
47 97
48 98
49 99
50 100

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Doc type: CAL Syst./S-Syst.: Discipline: INS Revision Date: 05-JAN- 2011
o
Originator Document N Page 3 of 13

COMMENTS RESPONSE SHEET


DOCUMENT REF.:

Document/
No Company Comments Contractor Response Initial Remarks
Page Ref.

Refer comment response sheet attached separately at the end of this document.

REVISION DETAIL TABULATION

DATE PAGE REVISION REVISION DETAILS

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Doc type: CAL Syst./S-Syst.: Discipline: INS Revision Date: 05-JAN- 2011
o
Originator Document N Page 4 of 13

TABLE OF CONTENTS
1. SCOPE ................................................................................................................................................... 5
2. TERMS AND ABBREVIATIONS ........................................................................................................... 5
3. REFERENCE DOCUMENTS ................................................................................................................. 5
4. CALCULATION METHOD ..................................................................................................................... 6
5. SUMMARY OF CALCULATION RESULT ............................................................................................ 7
6. CONCLUSION ....................................................................................................................................... 7
APPENDIX 1 – PNEUMATIC INSTRUMENT GAS CONSUMPTION CALCULATION ............................... 8

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Doc type: CAL Syst./S-Syst.: Discipline: INS Revision Date: 05-JAN- 2011
o
Originator Document N Page 5 of 13

1. SCOPE

This document defines the estimated instrument gas consumption at (SP1) Stupa Platform for SOUTH
MAHAKAM FIELD DEVELOPMENT PROJECT.

In the Main Stupa (SP1), the instruments related items including instrumentation packages that need the
instrument gas are on/off valves (ESDV, PSDV, SDV, BDV, and XV), adjustable choke valves (HCV), control
valves (LV) and gas driven pump for WHCP: HP1 (DHSV) and HP2 (SSV & WV) for both present and future
instruments / equipments.

The mechanicals and electricals related items including packages that need the instrument gas are Corrosion
Inhibitor Pump, ORMAT CCVT, Closed Drain Transfer Pumps, Open Drain Pump, Disposal Tube Pump,
Flare/Vent Purge, Flare Pilot, Methanol Injection Pump and Biocide Injection Pump. The pneumatic
instrument gas consumption calculations for those equipments shall be refered to project document CN –
Utility Balance Report ref.[19].
D

2. TERMS AND ABBREVIATIONS

AML : Approved Manufacturer List


BDV : Blowdown Valve
CCVT : Closed Cycle Vapour Turbo
DHSV : Down Hole Safety Valve
ESDV : Emergency Shutdown Valve
FEED : Front End Engineering Design
HPU : Hydraulic Power Unit
LV : Level Control Valve
PSDV : Process Shutdown Valve
SSV : Surface Safety Valve
WHCP : Wellhead Control Panel
WV : Wing Valve
XV : Isolation Valve

COMPANY : Total E&P Indonésie

CONTRACTOR : The EPSC Contractor in charge of the engineering, supply, fabrication,


assembly, transportation, installation and hook-up of the new facilities

VENDOR : The party that manufacturers and/or supplies respective equipment,


materials, goods and/or services for the project

3. REFERENCE DOCUMENTS
D
This calculation shall refer the project documents listed below:

[1] ID-SMK-MS-2045-112001 Main Stupa Platform – Typical Splitter Well Piping &
Instrumentation Diagram
[2] ID-SMK-MS-2045-112002 Main Stupa Platform – Typical Single Well (Future) Piping &
Instrumentation Diagram

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Doc type: CAL Syst./S-Syst.: Discipline: INS Revision Date: 05-JAN- 2011
o
Originator Document N Page 6 of 13

[3] ID-SMK-MS-2045-112003 Main Stupa Platform – Production and Test Manifold Piping
& Instrumentation Diagram
[4] ID-SMK-MS-2045-112004 Main Stupa Platform – Multiphase Flowmeter Piping &
Instrumentation Diagram
[5] ID-SMK-MS-2045-112005 Main Stupa Platform – 24" Trunkline Departure Piping &
Instrumentation Diagram
[6] ID-SMK-MS-2045-112006 Main Stupa Platform – Vent System Piping &
Instrumentation Diagram
[7] ID-SMK-MS-2045-112007 Main Stupa Platform – Fuel Gas System Piping &
Instrumentation Diagram
[8] ID-SMK-MS-2045-112008 Main Stupa Platform – Fuel Gas Distribution System Piping
& Instrumentation Diagram
[9] ID-SMK-MS-2045-112009 Main Stupa Platform – Closed Drain System Piping &
Instrumentation Diagram
[10] ID-SMK-MS-2045-112011 Main Stupa Platform – Open Drain System Piping &
Instrumentation Diagram
[11] ID-SMK-MS-2045-112012 Main Stupa Platform – Offloading Pump Piping &
Instrumentation Diagram
[12] ID-SMK-MS-2045-112014 Main Stupa Platform – Fuel Gas Distribution for Valve
Actuators (Main Deck) Sheet 1/2 Piping & Instrumentation
Diagram
[13] ID-SMK-MS-2045-112015 Main Stupa Platform – Fuel Gas Distribution for Valve
Actuators (Main Deck) Sheet 2/2 Piping & Instrumentation
Diagram
[14] ID-SMK-MS-2045-112016 Main Stupa Platform – Fuel Gas Distribution for Valve
Actuators (Cellar Deck) Piping & Instrumentation Diagram
[15] ID-SMK-MS-2045-112020 Main Stupa Platform – Pig Receiver (future) Sheet 1/2
Piping & Instrumentation Diagram
[16] ID-SMK-MS-2045-112021 Main Stupa Platform – Pig Receiver (future) Sheet 2/2
Piping & Instrumentation Diagram
[17] ID-SMK-ALL-2045-171009 Specification for Wellhead Control Panel
[18] ID-SMK-ALL-3005-070018 SMK-PO102A_DTS_Utilities Consumption List (LEDEEN)
[19] ID-SMK-ALL-2045-116001 CN – Utility Balance Report

4. CALCULATION METHOD

This calculation based on number of instrumentation devices driven by instrument gas. The quantity shall be
taken from Piping and Instrument Diagram (P&ID). The pneumatic instrument gas consumption volume will
depend on the devices that need the pneumatic instrument gas.
D
The considered gas consumption values of every item based on final selected vendor data.

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Doc type: CAL Syst./S-Syst.: Discipline: INS Revision Date: 05-JAN- 2011
o
Originator Document N Page 7 of 13

5. SUMMARY OF CALCULATION RESULT

Continuous Consumption Intermittent Consumption


Instrument Type Total Standard Total Standard
Consumption Instrument Type Consumption
(Nm3/h) (Nm3/h)
Adjustable Choke Valves 2.85 On/Off Valves 30.02
D Control Valves 0.38 HP1 Hydraulic Pump 39.73
HP2 Hydraulic Pump 49.38

Total Continuous Total Intermittent


3.23 119.13
Consumption Consumption

122.36
Total Instrument Gas Consumption (Nm3/h)

Assumptions and Notes:


D 1. The considered gas standard including total consumption values of every item based on final selected
vendor data.
2. ON/OFF valves (ESDV, PSDV, BDV, XV) fuel gas consumption is calculated as 3 cycles / hour based on
SMK-PO102A_DTS_Utilities Consumption List (LEDEEN) ref.[18].
3. The quantity of fuel gas consumption for HP1 systems is considered only for one pump by presuming
selected duty pump only will be under operation/running & stand by pump will be off.
4. The quantity of fuel gas consumption for HP2 systems is considered only for one pump by presuming
selected duty pump only will be under operation/running & stand by pump will be off.
5. The gas consumption for Well head control panel pumps (HP1 & HP2) is calculated based on minimum
instrument gas supply pressure i.e. 4.5 barg. So in this calculations considered 4.5 barg is the instrument
gas supply pressure as a worst case condition & selected pneumatic pumps, which resulted in
considerably increase in the instrument gas demand.

6. CONCLUSION

Based on the above calculation, the following is conclusion:


D Estimated instrument gas consumption for Main Stupa (SP1) Platform will be 122.36 Nm3/h (excluded
Corrosion Inhibitor Pump, ORMAT CCVT, Closed Drain Transfer Pumps, Open Drain Pump, Disposal Tube
Pump, Flare/Vent Purge, Flare Pilot, Methanol Injection Pump and Biocide Injection Pump. The pneumatic
instrument gas consumption calculations for those equipments shall be refered to project document CN –
Utility Balance Report ref.[19]).

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Doc type: CAL Syst./S-Syst.: Discipline: INS Revision Date: 05-JAN- 2011
o
Originator Document N Page 8 of 13

APPENDIX 1 – PNEUMATIC INSTRUMENT GAS CONSUMPTION CALCULATION

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Doc type: CAL Syst./S-Syst.: Discipline: INS Revision Date: 05-JAN- 2011
o
Originator Document N Page 9 of 13

Calculation-1. Continuous Consumption

No. Description Qty Total Units Remarks


Consumption
1. Choke Valves (Note-1)
50-HCV-100105 1 0.19 Nm3/h
3
50-HCV-100205 1 0.19 Nm /h
50-HCV-100305 1 0.19 Nm3/h
50-HCV-100405 1 0.19 Nm3/h
D 50-HCV-100505 1 0.19 Nm3/h
50-HCV-100605 1 0.19 Nm3/h
50-HCV-100705 1 0.19 Nm3/h
3
50-HCV-100805 1 0.19 Nm /h
50-HCV-100905 1 0.19 Nm3/h
50-HCV-101005 1 0.19 Nm3/h
50-HCV-101105 1 0.19 Nm3/h
50-HCV-101205 1 0.19 Nm3/h
50-HCV-101305 1 0.19 Nm3/h Future
3
50-HCV-101405 1 0.19 Nm /h Future
50-HCV-101505 1 0.19 Nm3/h Future

2. Control Valves (Note-2)


50-LV-450118 1 0.38 Nm3/h

Required Instrument Gas Consumption - Continuous 3.23 Nm3/h

Note:
1. Standard consumption of choke valves are based on FIELDVUE DVC6000 series digital positioner with low
bleed relay on Master Flo 200 DA Linier Pneumatic Actuator (Double Acting).
2. Standard consumption of control valves are based on FIELDVUE DVC6000 series digital positioner with
standard relay on Fisher 667 series Diaphragm Actuator (Single Acting).

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revC
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Revision Date: 30-Dec-
Doc type: CAL Revision Date: 05-JAN- 2011
2010
o
Originator Document N Page 10 of 13

Calculation-2. Intermittent Gas Consumption

No. Description Size/Rating Qty Total Units Remarks


Consumption
1. Emergency Shutdown Valves
50-ESDV-450111 24” / B31.8 1 4.16 Nm3/h
50-ESDV-450211 12” / B31.8 1 0.58 Nm3/h
50-ESDV-700118 2” / 150# 1 0.02 Nm3/h
50-ESDV-700119 2” / 150# 1 0.02 Nm3/h
50-ESDV-700136 2” / 150# 1 0.02 Nm3/h
50-ESDV-450311 10” / B31.8 1 0.36 Nm3/h Future
50-ESDV-450411 14” / B31.8 1 0.54 Nm3/h Future

2. Process Shutdown Valves


50-PSDV-100111 18” / 600# 1 0.88 Nm3/h
50-PSDV-100118 8” / 600# 1 0.24 Nm3/h
50-PSDV-100119 8” / 600# 1 0.24 Nm3/h
50-PSDV-100218 8” / 600# 1 0.24 Nm3/h
50-PSDV-100219 8” / 600# 1 0.24 Nm3/h
50-PSDV-100318 8” / 600# 1 0.24 Nm3/h
50-PSDV-100319 8” / 600# 1 0.24 Nm3/h
50-PSDV-100418 8” / 600# 1 0.24 Nm3/h
50-PSDV-100419 8” / 600# 1 0.24 Nm3/h
50-PSDV-100518 8” / 600# 1 0.24 Nm3/h
50-PSDV-100519 8” / 600# 1 0.24 Nm3/h
50-PSDV-100618 8” / 600# 1 0.24 Nm3/h
50-PSDV-100619 8” / 600# 1 0.24 Nm3/h
50-PSDV-100718 8” / 600# 1 0.24 Nm3/h
50-PSDV-100719 8” / 600# 1 0.24 Nm3/h
50-PSDV-100818 8” / 600# 1 0.24 Nm3/h
50-PSDV-100819 8” / 600# 1 0.24 Nm3/h
50-PSDV-100918 8” / 600# 1 0.24 Nm3/h
50-PSDV-100919 8” / 600# 1 0.24 Nm3/h
50-PSDV-101018 8” / 600# 1 0.24 Nm3/h
50-PSDV-101019 8” / 600# 1 0.24 Nm3/h
50-PSDV-101118 8” / 600# 1 0.24 Nm3/h
50-PSDV-101119 8” / 600# 1 0.24 Nm3/h
50-PSDV-101218 8” / 600# 1 0.24 Nm3/h
50-PSDV-101219 8” / 600# 1 0.24 Nm3/h
50-PSDV-101318 8” / 600# 1 0.24 Nm3/h Future
50-PSDV-101319 8” / 600# 1 0.24 Nm3/h Future
50-PSDV-101418 8” / 600# 1 0.24 Nm3/h Future
50-PSDV-101419 8” / 600# 1 0.24 Nm3/h Future
50-PSDV-101518 8” / 600# 1 0.24 Nm3/h Future
50-PSDV-101519 8” / 600# 1 0.24 Nm3/h Future
50-PSDV-110113 8” / 600# 1 0.24 Nm3/h
50-PSDV-360110 6” / 600# 1 0.12 Nm3/h
50-PSDV-450115 2” / 600# 1 0.02 Nm3/h
50-PSDV-450208 12” / 600# 1 0.45 Nm3/h
50-PSDV-450212 8” / 600# 1 0.24 Nm3/h
50-PSDV-700116 2” / 150# 1 0.02 Nm3/h
50-PSDV-700117 2” / 150# 1 0.02 Nm3/h
50-PSDV-700120 2” / 150# 1 0.02 Nm3/h
50-PSDV-700121 2” / 150# 1 0.02 Nm3/h
This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Revision Date: 30-Dec-
Doc type: CAL Revision Date: 05-JAN- 2011
2010
o
Originator Document N Page 11 of 13

50-PSDV-700122 2” / 150# 1 0.02 Nm3/h


50-PSDV-700149 2” / 150# 1 0.02 Nm3/h
3
50-PSDV-450308 10” / 600# 1 0.36 Nm /h Future
50-PSDV-450408 14” / 600# 1 0.54 Nm3/h Future
50-PSDV-450312 8” / 600# 1 0.24 Nm3/h Future
50-PSDV-450412 8” / 600# 1 0.24 Nm3/h Future

3. Blowdown Valves
3
50-BDV-100104 3” / 600# 1 0.09 Nm /h
50-BDV-110102 2” / 600# 1 0.02 Nm3/h
50-BDV-450113 3” / 600# 1 0.09 Nm3/h
50-BDV-450217 2” / 600# 1 0.02 Nm3/h
50-BDV-700111 2” / 150# 1 0.02 Nm3/h
50-BDV-450317 2” / 600# 1 0.02 Nm3/h Future
3
50-BDV-450417 2” / 600# 1 0.02 Nm /h Future

4. Isolation Valves
50-XV-280113 2” / 150# 1 0.02 Nm3/h
50-XV-280114 2” / 150# 1 0.02 Nm3/h
50-XV-280210 2” / 150# 1 0.02 Nm3/h
3
50-XV-280305 2” / 150# 1 0.02 Nm /h
50-XV-450106 24” / B31.8 1 4.16 Nm3/h
50-XV-450107 24” / B31.8 1 4.16 Nm3/h
50-XV-450108 24” / 600# 1 1.95 Nm3/h
50-XV-450206 12” / B31.8 1 0.58 Nm3/h
50-XV-450207 12” / B31.8 1 0.58 Nm3/h
3
50-XV-700101A 2” / 600# 1 0.02 Nm /h
50-XV-700101B 2” / 600# 1 0.02 Nm3/h
50-XV-700137 2” / 150# 1 0.02 Nm3/h
50-XV-700138 2” / 150# 1 0.02 Nm3/h
50-XV-450306 10” / B31.8 1 0.36 Nm3/h Future
50-XV-450307 10” / B31.8 1 0.36 Nm3/h Future
3
50-XV-450406 14” / B31.8 1 0.54 Nm /h Future
50-XV-450407 14” / B31.8 1 0.54 Nm3/h Future
Required Instrument Gas Consumption - Intermittent 30.02 Nm3/h

Note:
1. ON/OFF valves (ESDV, PSDV, BDV, XV) fuel gas consumption is calculated as 3 cycles/hour based on
SMK-PO102A_DTS_Utilities Consumption List (LEDEEN) ref.[18].

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Revision Date: 30-Dec-
Doc type: CAL Revision Date: 05-JAN- 2011
2010
o
Originator Document N Page 12 of 13

Calculcation-3. DHSV Circuit (HP1 Pumps)

Based on final selected WHCP vendor calculation, fully charge the accumulators HP1 at the minimum Instrument gas
pressure (4.5 barg) from zero to normal operating hydraulic pressure (615 barg) within 1 minute and from normal
operating hydraulic pressure (615 barg) to maximum operating hydraulic pressure (650 barg) within 4.9 minutes.

The selected Pump for HP1 is HASKEL DSTV-150 and pump performance as shown in the Chart-1.

Required Pressure = Maximum Operating Pressure = 650 barg.


Required Flow = 400 cc/ minute = 0.4 liter / minute

Chart - 1

So the Instrument gas consumption for HP1 Pump (at 4.5 barg gas driven pressure) = 0.66 s m3/min = 39.73 Nm3/h
= 24.7 SCFM

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
o
Contract: SMK1&2/EPSCI COMPANY Document N

Main Stupa (SP1) Platform – Pneumatic Instruments Gas ID-SMK-MS-2045-178033


Consumption Calculations Revision: D Status: AFC
Revision Date: 30-Dec-
Doc type: CAL Revision Date: 05-JAN- 2011
2010
o
Originator Document N Page 13 of 13

Calculcation-4. SSV, WV Circuit (HP2 Pumps)

Based on final selected WHCP vendor calculation, fully charge the accumulators HP2 at the minimum Instrument gas
pressure (4.5 barg) from zero to normal operating hydraulic pressure (330 barg) within 3 minutes and from normal
operating hydraulic pressure (330 barg) to maximum operating hydraulic pressure (380 barg) within 8 minutes.

The selected Pump for HP2 is HASKEL DSTV-100 and pump performance as shown in the Chart-2.

Required Pressure = Maximum Operating Pressure = 380 barg.


Required Flow = 800 cc/ minute = 0.8 liter / minute

Chart - 2

So the Instrument gas consumption for HP2 Pump (at 4.5 barg gas driven pressure) = 0.82 s m3/min = 49.38 Nm3/h
= 30.7 SCFM

This document is the property of TOTAL and it shall not be disclosed to third parties or reproduced without permission of the COMPANY.
Electronic Filename: ID-SMK-MS-2045-178033_revD
COMMENTS RESPONSE SHEET
DOCUMENT REF.: ID-SMK-MS-2045-178033, Rev C

Document/
No Company Comments Contractor Response Initial Remarks
Page Ref.
The Calculation is updated
based on the selected Vendor
data.
The selected pump curve shall be
based on the 4.5 barg air driven,
The selected Pump (HASKEL
and it was highlighted in previous
DSTV-150 for HP1 and
1. 13 submission.
HASKEL DSTV-100 for HP2)
CTR shall update it to ensure the
already based on 4.5 barg gas
selected pump based on the pump
driven on the pump
performance curve.
performance curve.