OCTOBER, 2023
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
Name Function Signature Date
Table of Contents
1.0 Introduction……………………………………………………………………………………1
2.0 Pile Load Test Information……….……………………………………………..……………1
3.0 Equipment…………………………………………………………………………………….2
4.0 Scope of Work…………………………………………………………………………………2
5.0 Limitation:………………………………………………………………………………………2
6.0 Procedures……………………………………………………………………………………...3
7.0 Test Operations………………………………………………………………………………...3
8.0 Summary of Results…………………………………………………………………………….4
9.0 Analysis of Results & Recommendation……………………………………………………….4
LIST OF TABLES
Table 1: Load with corresponding settlements
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
APPENDICIES
Appendix A – Loading Sequence & Load/Settlement Behavior
Appendix B – Site Photos
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
1.0 INTRODUCTION
Tech Test Nigeria Limited an indigenous company has been contracted by Zaragozatech
Contruction Nigeria Limited to carry out a Static Pile Load Test on a selected pile at
proposed Ten Storeys Building Hotel at Aba Port Harcourt Owerri Road, Aba, Abia State.
The selected pile for the Static Pile Load Test was 600mm in diameter bored piles
installed at a depth of 20 meters acting mainly in end bearing with designated Safe
Working Load (SWL) of 1500KN with and Ultimate Load of 2250KN.
Report contained herein presents the results of the Static load test carried out on the
selected Pile.
The objectives of the load test on this working pile is to verify the design assumptions
for the pile capacity by proofing that the actual safe working load can be adopted and
also to determine the settlement at the safe working load (SWL). Also, to check the
ultimate load which is specified to be 1.5 Times the designed safe working loads (UL).
The pile was scheduled to be tested in two cycles.
Soil Type: Clayey soil with traces of silt in some tin layer (Lateritic Material)
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
3.0 EQUIPMENT
The following equipment was mobilized for the pile load test
4. A horizontal bar as reference Beam (to serve as reaction for the strain gauges)
5.0 LIMITATION: The Test was carried out in accordance with the accepted pile load test
Standards Practice. The recommendation and conclusion reach in this report are based
on the data obtained from the pile load test carried out at Pile No: 37 not carried out.
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
6.0 PROCEDURES
The above equipment was assembled in accordance with the standard specified in the
BS 8004. 1986 for the maintained load test. The test procedure was generally in
accordance with the guidelines contained in the BS 8004. 1986 section 7.5 and ASTM
D1143 – 81 (Reapproved 1994).
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
8.0 SUMMARY OF RESULTS
1st Cycle
2nd Cycle
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
The results obtained in the field were recorded on the field logs and used for the
analysis of load/settlement behavior which is presented Appendix A for both cycles.
The results reveal that at 100% SWL ( i.e. 1500KN) maximum settlement in
compression recorded after 6hours was 17.692mm and at the end of 6hours of
sustaining the ultimate load of 2250KN (150% SWL) the maximum settlement
The order of settlement for these pile when compared with the values regarded as
maximum beyond which a pile is considered to have failed under the applied load (i.e.
A settlement equivalent to 10% of the nominal shaft/ diameter 600mm in this case).
In view of the above analysis, Safe Working load of 1500KN adopted for the tested
pile can be safely supported by the tested pile and similar piles installed on this site
within permissible settlement limit and with adequate factor of Safety.
Above recommendation is borne purely on the results of the 37No. Pile load test
carried out on a working pile installed on this site and can be applied solely to the
tested pile. The results show clearly that at the designed safe working load (SWL),
total settlement is negligible and tolerable.
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
APPENDIX
A
LOADING SEQUENE/LOAD SETTLEMENT
CURVE
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
LOADING SEQUENCE/SETTLEMENT CURVE
LOADING SEQUENCE AND TIMING FOR STATIC PILE LOAD TEST SWL=1500KN
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
APPENDIX
B
PILE LOAD TEST RECORDS
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
PILE LOAD TEST RECORDS
Pile Load Test Records
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
,, 2:54 1125 112.5 75 19.020 17.690 18.355
,, 2:58 ,, ,, 19.005 17.675 18.340
,, 3:08 ,, ,, 19.000 17.670 18.335
,, 3:23 ,, 18.995 17.665 18.330
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
,, 11:23 ,, ,, 18.755 16.673 17.714
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
,, 9:04 750 0 50 12.930 12.460 12.695
APPENDIX
C
SITE PICTURES
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
Picture 1: Pile
load test
Readings is in
progress
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
Picture 2: Loading in Progress, witness by the client
APPENDIX
D
CALIBRATION CERTIFICATES
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
Picture 1: Dial Gauge Calibration Certificates
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.