You are on page 1of 19

STATIC PILE LOAD TEST REPORT

FOR THE PROPOSED CROWN REALTIES HOTEL, ABA


PORTHARCOURT OWEERI ROAD.

OCTOBER, 2023

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
Name Function Signature Date

Approved by Project Manager

Reviewed by Project Engineer

Prepared by Site Engineer

Table of Contents

1.0 Introduction……………………………………………………………………………………1
2.0 Pile Load Test Information……….……………………………………………..……………1
3.0 Equipment…………………………………………………………………………………….2
4.0 Scope of Work…………………………………………………………………………………2
5.0 Limitation:………………………………………………………………………………………2
6.0 Procedures……………………………………………………………………………………...3
7.0 Test Operations………………………………………………………………………………...3
8.0 Summary of Results…………………………………………………………………………….4
9.0 Analysis of Results & Recommendation……………………………………………………….4

LIST OF TABLES
Table 1: Load with corresponding settlements

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
APPENDICIES
Appendix A – Loading Sequence & Load/Settlement Behavior
Appendix B – Site Photos

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
1.0 INTRODUCTION

Tech Test Nigeria Limited an indigenous company has been contracted by Zaragozatech
Contruction Nigeria Limited to carry out a Static Pile Load Test on a selected pile at
proposed Ten Storeys Building Hotel at Aba Port Harcourt Owerri Road, Aba, Abia State.
The selected pile for the Static Pile Load Test was 600mm in diameter bored piles
installed at a depth of 20 meters acting mainly in end bearing with designated Safe
Working Load (SWL) of 1500KN with and Ultimate Load of 2250KN.

Report contained herein presents the results of the Static load test carried out on the
selected Pile.
The objectives of the load test on this working pile is to verify the design assumptions
for the pile capacity by proofing that the actual safe working load can be adopted and
also to determine the settlement at the safe working load (SWL). Also, to check the
ultimate load which is specified to be 1.5 Times the designed safe working loads (UL).
The pile was scheduled to be tested in two cycles.

2.0 PILE LOAD TEST INFORMATION

 Pile Initial Load Test No.: 37


 Pile location: Proposed Crown Realties Hotels site.

 Pile Type: Cast in place, Date of Casting:

 Method of Boring: Auguring bucket excavation

 Soil Type: Clayey soil with traces of silt in some tin layer (Lateritic Material)

 Design load (Safe Working Load): 1500KN

 Ultimate load (Maximum Applied Load): 2250KN

 Testing Standard: IS-2911 (IV), ASTM D1143, BS 8004. 1986

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
3.0 EQUIPMENT

The following equipment was mobilized for the pile load test

1. 1No. ENERPAC jack of 3000 Tons capacity.

2. Enerpac Hydraulic Pump with pressure gauge of 10000Bar

3. 2Nos. strain gauges for recording settlement (Ele UK)

4. A horizontal bar as reference Beam (to serve as reaction for the strain gauges)

5. A digital timer for recording time

4.0 SCOPE OF WORK:


The scope of this work are as follows,
 Setup details for carrying out pile load test: these include the following:
o Material and equipment required for the test
o Placement of loading platform
o Installation of reference beam
o Leveling and placing of plate, hydraulic jack, dial Gauge and pressure gauge
o Ensuring safety provision
 Recording of time, load and settlement data
 Preparing and submission of report that will include the following’
o Preparation of related graph
o Analyzing of recorded data
o Interpretation of results

5.0 LIMITATION: The Test was carried out in accordance with the accepted pile load test
Standards Practice. The recommendation and conclusion reach in this report are based
on the data obtained from the pile load test carried out at Pile No: 37 not carried out.

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
6.0 PROCEDURES

The above equipment was assembled in accordance with the standard specified in the
BS 8004. 1986 for the maintained load test. The test procedure was generally in
accordance with the guidelines contained in the BS 8004. 1986 section 7.5 and ASTM
D1143 – 81 (Reapproved 1994).

7.0 TEST OPERATIONS


We mobilized to site on 18th October, 2023 to carry out the pile load test. All site
preparations were done three days prior to the test and some of this included setting
of the beams on the pile and the plate to carry the static load. The testing on the Pile
commenced on 21st October, 2023 at 01:53pm and was concluded on 22nd October,
2023.
The Safe Working Load (i.e. SWL of 1500KN) was attained at 3:24pm on 21nd
October, 2023 and maintained for 6hours, whilst the Ultimate Working Load (i.e. UWL
2250KN) was successfully achieved at 2:24am on 22nd October, 2023.
The load was maintained at this level for 6 hours, after which offloading to zero and
final readings were obtained at about 10:24am on 22nd October 2023.
Note: After achieving the Ultimate Working load which is 1.5% the self-working Load,
the contractor suggested that the load be increased to 2.0% the SWL which amounted
to the UWL of 3000KN.
The pictures of the operations are presented in the Site pictures in Appendix B. While
summary of the results is presented below in section 5. The loading sequence is
however also presented in Appendix A.

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
8.0 SUMMARY OF RESULTS

The results obtained are summarized in the table below.

TABLE 1: LOAD / CORRESPONDING SETTLEMENT

1st Cycle

Load % Load Pressure Gauge Settlement Time


Reading
375 25 37.5 19.240 5
750 50 75 19.015 30
1125 75 112.5 18.355 30
1500 100 187.5 17.728 360
1125 75 112.5 17.730 10
750 50 75 17.875 10
375 25 0 18.075 10
0 0 0 16.353 60

2nd Cycle

Load % Load Pressure Gauge Settlement Time


Reading
1500 100 187.5 17.718 60
1875 125 262.5 17.395 60
2250 150 337.5 16.955 360
2625 175 412.5 16.905 10
3000 200 487.5 16.805 10
2625 175 412.5 16.408 60
2250 150 337.5 12.370 60
1875 125 262.5 12.455 10
1500 100 187.5 12.695 10
1125 75 112.5 12.910 10
750 50 75 12.675 10
375 25 31.5 12.675 10
0 0 0 12.675. 60

Note: SWL=1500KN, (1.5XSWL) = 2250KN

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
The results obtained in the field were recorded on the field logs and used for the
analysis of load/settlement behavior which is presented Appendix A for both cycles.

9.0 ANALYSIS OF RESULTS & RECOMMENDATIONS

The results reveal that at 100% SWL ( i.e. 1500KN) maximum settlement in

compression recorded after 6hours was 17.692mm and at the end of 6hours of

sustaining the ultimate load of 2250KN (150% SWL) the maximum settlement

recorded in compression was 16.905mm.

The order of settlement for these pile when compared with the values regarded as
maximum beyond which a pile is considered to have failed under the applied load (i.e.
A settlement equivalent to 10% of the nominal shaft/ diameter 600mm in this case).

In view of the above analysis, Safe Working load of 1500KN adopted for the tested
pile can be safely supported by the tested pile and similar piles installed on this site
within permissible settlement limit and with adequate factor of Safety.

Above recommendation is borne purely on the results of the 37No. Pile load test
carried out on a working pile installed on this site and can be applied solely to the
tested pile. The results show clearly that at the designed safe working load (SWL),
total settlement is negligible and tolerable.

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
APPENDIX
A
LOADING SEQUENE/LOAD SETTLEMENT
CURVE

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
LOADING SEQUENCE/SETTLEMENT CURVE
LOADING SEQUENCE AND TIMING FOR STATIC PILE LOAD TEST SWL=1500KN

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
APPENDIX
B
PILE LOAD TEST RECORDS

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
PILE LOAD TEST RECORDS
Pile Load Test Records

Location: - Aba Portharcourt Owerri Road Test Pile No.:- 37


Jack: - 300 Tons Test Load: SWL1500KN, ULT. (3000KN)
Pump: - 300 Tons Pile Dimension: 600 mm Diameter
Gauge: 1, & 2 Pile Length: 20.00m
Supervisor: - Blessing Test No: 1

DATE TIME LOAD (KN) PRESSURE % DIAL GAUGE READINGS SETTLEMENT


(BARS) LOAD Gauge 1 Gauge 2 (mm)
(mm)

21-10-2023 1:53pm 0 0 0 0.000 0.000 0.000

,, 1:54 375 37.50 25 19.895 18.585 19.240

,, 1:58 ,, ,, 19.890 18.590 19.240

,, 2:08 ,, ,, 19.885 18.580 19.233

,, 2:23 ,, ,, 19.880 18.570 19.225

,, 2:24 750 75.0 50 19.675 18.355 19.015

,, 2:28 “ “ 19.670 18.350 19.010

,, 2:38 ,, ,, 19.665 18.350 19.008

,, 2:53 ,, ,, 19.665 18.340 19.003

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
,, 2:54 1125 112.5 75 19.020 17.690 18.355
,, 2:58 ,, ,, 19.005 17.675 18.340
,, 3:08 ,, ,, 19.000 17.670 18.335
,, 3:23 ,, 18.995 17.665 18.330

,, 3:24 1500 187.5 100 18.785 16.670 17.728

,, 3:28 ,, ,, 18.765 16.650 17.728


,, 3.38 ,, ,, 18.755 16.640 17.698

,, 3:53 ,, ,, 18.750 16.635 17.693

,, 4:23 ,, ,, 18.750 16.634 17.692

,, 5:23 ,, ,, 18.750 16.634 17.692

,, 6:23 ,, ,, 18.750 16.634 17.692

,, 7:23 ,, ,, 18.750 16.633 17.692

,, 8:23 1875 262.5 125 18.750 16.633 17.692

,, 9:23 ,, ,, 18.750 16.633 17.692

,, 9:24 1500 187.5 100 18.750 16.633 17.692

,, 9:28 ,, ,, 18.750 16.633 17.692

,, 9:29 112.5 112.5 75 18.820 16.640 17.730

,, 9:38 ,, ,, 18.830 16.640 17.735

,, 9:39 750 37.5 50 18.960 16.790 17.875

,, 9:53 ,, ,, 18.960 16.790 17.875

,, 9:54 375 0 25 19.120 17.03 18.075

,, 10:53 0 0 0 18.075 14.63 16.353

,, 10:54 1500 187.5 100 18.760 16.675 17.718

,, 10:58 ,, ,, 18.760 16.675 17.718

,, 11:08 ,, ,, 18.755 16.673 17.714

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
,, 11:23 ,, ,, 18.755 16.673 17.714

22-10-2023 12:53 ,, ,, 18.755 16.673 17.714

,, 12:54 1875 262.5 125 18.450 16.340 17.395

,, 12:58 ,, ,, 18.430 16.335 17.383


,, 1:08 ,, ,, 18.420 16.333 17.377
,, 1:23 ,, ,, 18.410 16.320 17.365

,, 2:23 ,, ,, 18.400 16.300 17.350

,, 2:24 2250 337.5 150 18.360 15.550 16.955

,, 2:28 “ “ 18.340 15.540 16.940

,, 2:38 ,, ,, 18.325 15.530 16.928

,, 2:53 “ “ 18.320 15.521 16.921

,, 3:23 ,, ,, 18.321 15.520 16.921

,, 4:23 ,, ,, 18.300 15.510 16.905

,, 5:23 ,, “ 18.300 15.510 16.905

,, 6:23 ,, ,, 18.300 15.510 16.905

,, 7:23 ,, 262.5 18.300 15.510

,, 8:23 ,, ,, 18.300 15.510 16.905

,, 8:24 2625 187.5 175 18.300 15.310 16.805

,, 8:33 ,, ,, 18.300 15.310 16.805

,, 8:34 3000 112.5 200 17.505 15.310 16.408

,, 8:43 ,, ,, 17.505 15.310 16.408

,, 8:44 1500 37.5 100 12.490 12.250 12.370

,, 8:53 ,, ,, 12.490 12.250 12.370

,, 8:54 1125 0 75 12.660 12.250 12.455

,, 9:03 ,, ,, 12.660 12.250 12.455

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
,, 9:04 750 0 50 12.930 12.460 12.695

,, 9:13 ,, ,, 12.930 12.460 12.695

,, 9:23 375 0 25 13.120 12.700 12.910


,, 9:24 “ 0 13.120 12.700 12.910

10:24 0 0 13.280 12.070 12.675

APPENDIX
C
SITE PICTURES

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
Picture 1: Pile
load test
Readings is in
progress

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
Picture 2: Loading in Progress, witness by the client

APPENDIX
D
CALIBRATION CERTIFICATES

Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
Report No: C-2023/0895 – ZARAGOZATEC CONST. NIG. LTD Pile Load Test for Proposed
Crown Realties Hotel Aba Portharcourt Owerri Road. Aba, Abia State.
Picture 1: Dial Gauge Calibration Certificates