1.1 The Services to be performed by Contractor shall consist of the following works
(collectively referred to as “Service”):
1.1.1 Supply of Services in accordance with the scope of work, specifications, and
requirements;
1.1.3 Supply, maintain, care, custody, and delivery at the Project Site of Fit-for-Purpose
equipment and materials necessary for the timely and successful performance of
the Services;
1.1.4 Obtain all Required Approvals and maintain all valid permits, licenses, franchises,
and comply with regulatory requirements, Applicable Laws and this Contract to
satisfactorily carry-out the Services; and
1.1.5 Such other services that may be required by the Owner which are necessary and
directly related to the performance of the Services and the timely completion
thereof (“Other Services”).
2.1.1 The Services are intended for use by Owner in Mt. Apo Geothermal Project
(MAGP) (the “project Site”). The climate at the Project site is characterized by a
more or less even distribution of rainfall throughout the year. The intense rain
period usually occurs during the months of June to February season. Contractor
is to expect said climate condition throughout the duration of Works and should
prepare for such eventualities and not use this as an excuse to suspend work or
ask for extension of time to complete the Works and Services, except as provided
on this Contract.
2.1.2 The Contractor shall perform the following as described in detail below:
i. In not less than 10 BD prior to all work at site, Contractor shall submit a Work
Program (including bar-chart/s-curve), PERT-CPM, Resource Loading, and
Working Table of Organization subject to the review and approval of the
Owner. Should Contractor fail to submit these and any necessary documents
Conforme:
_____________________________ _______________________________________
Business Name Authorized Representative (Print Name & Sign)
Project Name : PROPOSED SIP BUILDING FACILITY
ii. Contractor shall be responsible for the installation of signages and other
compliance to Owner’s requirements on Health, Environment, Safety and
Security.
2.1.3 Contractor shall provide supervision and technical expertise, labor, tools, Fit-for-
Purpose Equipment, Materials, other consumables, and incidentals necessary to
undertake the Proposed SIP Building Facility in MAGP in conformity with this
Contract. The Works shall include but not limited to the following:
Conforme:
_____________________________ _______________________________________
Business Name Authorized Representative (Print Name & Sign)
Project Name : PROPOSED SIP BUILDING FACILITY
B. DESCRIPTION OF WORKS
1.0 SITEWORK
a. Excavation
b. Backfilling
c. Grading
d. Dewatering
e. Soil Treatment
4.0 METALS
a. Structural Metal Framing (includes truss, purlins, sag rods, rivets, etc.)
b. Steel Grating for Area & Catch Basin
c. Stair railings at Stairs
d. Stair railings at Hallway
e. Stainless Steel gutter
f. Aircon louvres using 25 x 50mm steel
g. Clothes rack using 25 x 50mm steel tubing in powder coated matte
black finish
h. Kitchen Stainless steel counter
Conforme:
_____________________________ _______________________________________
Business Name Authorized Representative (Print Name & Sign)
Project Name : PROPOSED SIP BUILDING FACILITY
_____________________________ _______________________________________
Business Name Authorized Representative (Print Name & Sign)
Project Name : PROPOSED SIP BUILDING FACILITY
9.0 FINISHES
Floor Finishes
a. Vitrified Floor Tiles
1. Lobby
2. Hallway
3. Kitchen
4. Front Office
5. Clinic
6. Lobby Toilets
7. Lounge
8. Mess Hall
9. Kitchen
10. F&B Storage
11. Electrical/Engineering/ I.T. Room
12. Multi-Purpose Hall
13. Laundry/ Linen Storage
14. Security Room
15. Shower Rooms
Wall Finish
a. Concrete Windows & Doors Casing at Exterior
b. Wall Tiles in All Bathrooms
Ceiling Finishes
a. 13mm thk. Gypsum Board on metal furring
b. 13mm thk. Moisture Resistant Gypsum Board on Metal furring for
Bathrooms
c. 4.5mm thk. Fiber Cement Board on Metal furring for Exterior Ceiling
d. Apo Galfan Spandrel as manufactured by Puyat Steel Corporation or
approved equal for ceiling eaves
Painting Works
a. Concrete Surfaces
1. Exterior - Acrytex System by Boysen- Plain Finish
2. Interior - Semi-gloss latex by Boysen
b. Varnish finish for Wooden Surfaces
c. Gypsum Surfaces - Latex Flat by Boysen
d. Metal Surfaces - Automotive Painted Finish by Boysen
Conforme:
_____________________________ _______________________________________
Business Name Authorized Representative (Print Name & Sign)
Project Name : PROPOSED SIP BUILDING FACILITY
Countertop
a. Marble top at lavatory counters for 22 bathrooms and lobby toilets (Use
emperador brown)
b. Marble top at lavatory counters at muti-purpose hall showers (Use
emperador brown)
c. Marble top at reception counter (use emperador brown)
11.0 ELECTRICAL
Conforme:
_____________________________ _______________________________________
Business Name Authorized Representative (Print Name & Sign)
Project Name : PROPOSED SIP BUILDING FACILITY
d. Lighting fixtures
3. Power & Receptcle System
a. Roughing-ins
b. Wires and Cable
c. Wiring Devices "Omni Brand"
4. Grounding System
a. Roughing-ins
b. Wires and Cable
c. Equipment & Devices
5. Telephone System
a. Roughing-ins
b. Wires and Cable
c. Wiring Devices
6. CCTV System
a. Roughing-ins
b. Wires and Cable
c. Equipment & Wiring Devices
7. CaTV System
a. Roughing-ins
b. Wires and Cable
c. Equipment & Wiring Devices
8. Fire Detection and Alarm System
a. Roughing-ins
b. Wires and Cable
c. Wiring Devices
9. Generator System
10. Miscellaneous and Incidentals
12.0 MECHANICAL
Conforme:
_____________________________ _______________________________________
Business Name Authorized Representative (Print Name & Sign)
Project Name : PROPOSED SIP BUILDING FACILITY
1. Sprinkler heads
2. Sprinkler adaptors
3. Elbow / tee / reducer fittings
4. Siamese Connector
5. Gate valve ( heavy Duty )
6. Main pipe line
7. Branch lines
8. Main vertical line
9. End connector cap
10. Angle valve
11. Fire hose cabinet / fire extinguisher
12. 90 pounds fire extinguisher
13. Mounting screws
14. Mounting brackets
15. Fireman's valve
16. Consumables
17. Flanges / screws
18. Testing & Commissioning
_____________________________ _______________________________________
Business Name Authorized Representative (Print Name & Sign)
Project Name : PROPOSED SIP BUILDING FACILITY
The Safety Officer shall be responsible in implementing the applicable safety and
health rules and regulations. Contractor shall abide by all occupational safety and
health laws, standards, rules, regulations and procedures set, ordered, enforced and
administered by the Department of Labor and Employment (DOLE) – Bureau of
Working Condition (BWC), the Department of Energy (DOE) and the Owner.
3.2 Appointment and replacement of Key Personnel shall require prior approval by
Owner.
Conforme:
_____________________________ _______________________________________
Business Name Authorized Representative (Print Name & Sign)
Project Name : PROPOSED SIP BUILDING FACILITY
3.3 In case the Contractor fails to provide the minimum Key Personnel, Owner shall
deduct for the total Service Price the corresponding rate per day of the lacking Key
Personnel, in accordance with the table rates below, until such time that the lacking
Key Personnel is present at Project Site, or at the location agreed upon by the
parties, except when the absence of the Key Personnel is approved by the Owner
and a prior written notice was sent to Owner’s Representative.
3.4 Contractor shall submit the list and identities of Contractor Personnel to be
assigned to perform the Services. The list shall be accompanied by:
4.1 Contractor shall engage for the third party Contractor for the inspection of all
Contractor’s lifting, heavy and hauling equipment including agreed vehicles with
semi or full trailers (i.e. cranes, boom trucks, forklifts, loaders, earth moving
equipment, etc.) to be used for the Works.
4.2 Contractor shall have its drivers/operators for lifting, heavy and hauling
equipment certified by Technical Education and Skills Development
Authority/Association of Carriers and Equipment Lessors, Inc. (TESDA/ACEL) or by
TESDA/ACEL accredited entities and undergo safety and security orientation prior
to mobilization at Project Site.
5. INSURANCES
5.1 In addition to other requirement set forth herein, the Contractor is likewise
required to provide the following insurances
Conforme:
_____________________________ _______________________________________
Business Name Authorized Representative (Print Name & Sign)
Project Name : PROPOSED SIP BUILDING FACILITY
5.1.1 Contractor’s All Risk (CAR/EAR) Insurance to cover the entire Works
(permanent and temporary) including materials supplied by the Owner,
to their full replacement value, from any causes whatsoever with:
Conforme:
_____________________________ _______________________________________
Business Name Authorized Representative (Print Name & Sign)