SPECIFICATION
SECTION 01
GENERAL REQUIREMENTS
PART 1 - GENERAL
1.01 GENERAL
A. All Work specified in the Specification shall comply with the requirements of the
Contract Documents for the Main Building Works, namely the Drawings, Schedules
and with all other Contract Documents.
B. General requirements specified herein shall apply in whole or in part throughout the
Specification where applicable and shall be read in conjunction with the Specific
Requirement of each section of the Specification.
C. All materials and components used in the work shall be in accordance with the
Specification and shall be uniform in type, colour, texture and finish where
applicable.
E. Substitutes for materials and components for approval shall be equivalent in quality
and suitable for the work.
F. All materials and components used in the work shall be free from any defects that
may impair the strength, function, durability, integrity or appearance of the work.
1.03 CO-ORDINATION
A. Work of every trade shall be scheduled and coordinated with all other trades and
disciplines and shall not proceed until other work and/or job conditions are in place.
B. The Contractor shall familiarize himself thoroughly with the Drawings and
Specifications for all the trades and disciplines and fully understand all the provisions
in each trade and discipline to co-ordinate the fabrication, delivery to site, installation
and finishing of all related work for the proper completion of the whole work.
D. Delegation of co-ordination work by the Contractor does not absolve the Contractor
from his full responsibility to ensure satisfactory completion.
E. Where permits from all relevant authorities are required, they shall be secured in
advance preceding the supply, fabrication and installation work.
A. Take site measurements where necessary prior to the preparation of Shop Drawings
and fabrication to ensure proper fit between the work and adjacent work.
A. Protection:
1. The Contractor shall protect all work from misuse or damage upon the completion of
each section of the work.
2. Special precaution shall be taken to protect work from damage by tradesmen of other
trades.
3. Any work damaged with marks or scratches during the progress of the work shall not
be accepted and shall be replaced with new work and all costs arising from the
replacement of such damaged work shall be borne by the Contractor.
4. The Contractor shall not only protect his work at all times but shall also protect all
adjacent work and materials where necessary using suitable coverings or other
suitable approved methods during the progress of his work.
5. Upon the completion of the whole work and at such time as directed, all materials
used in the protection of the work shall be removed and the exposed surfaces of all
work checked for smears, scratches, and abrasions.
6. Any damages to exposed finishes shall be repaired and make good and all costs
arising from the repair and making good shall be borne by the Contractor.
B. Acceptance:
2. Defective, broken or damaged work shall be removed and replaced with new work of
the same design and specification at no cost to Tagum Cooperative.
C. Cleaning:
1. At regular intervals, during the course of the work, remove all debris and excess
material from the site and clean up the area including its surrounding where
necessary.
2. Upon completion of the whole work, remove all temporary protection from the work
and clean all finished work and leave all items in a satisfactory condition.
1.06 SCHEDULES
A. All work described and itemized in the respective Schedule shall comply with all
the requirements of the Specification.
C. The revised schedule shall show the name of the manufacturer, brand name, type of
material, profile, dimension, size, location, quantity and shall be submitted with
technical data showing applicable standard and codes, where applicable.
Description Specification
1.0 SITEWORKS
5.0 FINISHES
6.0 SPECIALTIES
Fittings
Shower Head
- Single hole, single lever mixer,
gooseneck tubular swivel spout and
aerator
7.0 FORMS/SCAFFOLDING