Scope of Works:
1. Mobilization / Demobilization
3. Permits
a. Building Permit
1 of 6
1. Based on the conceptual drawings/lay-out provided, design and develop
drawings and submit complete drawings and documents as required by
PEZA.
b. Occupancy Permit
1. Submit As-built Drawings and documents as required by PEZA.
a. The contractor shall prepare the structural design and drafting of building and
structures as mentioned above, in compliance with NSCP 2015, National
2 of 6
Building Code, National Plumbing Code, Fire Code of the Philippines, and
Philippine Mechanical Code.
b. All construction plans and drawings shall be approved by DMPI before
implementation.
c. Loads:
Wind
Earthquake
Mechanical Service load = 1.0 kPa
Electrical Service Load = 0.5 kPa
Maintenance Service Live Load = 1.0 kPa
Scope will include site clearing, excavation, earth works, and surface
preparations.
a. Excavation:
The contractor shall make all necessary excavation for foundation to
grade as indicated in the drawings.
No footing and columns shall rest in the fill. Where excavations for
foundations reveal that footing will rest on fill, it shall be carried deeper
until the desired stratum for safe bearing power is reached.
Whenever water is encountered in any excavations, the same shall be
removed using pail of pump. Care being taken that the surrounding
earth is not disturbed.
All excavation for drainage, water service systems and septic tanks
and such excavation as may be necessary for the completion of the
project are included.
3 of 6
Fills shall be placed in layers not exceeding 0.25 m (10 inches) in
thickness, each layer being thoroughly compacted by wetting, tamping
or rolling. After the back fill has settled, the contractor shall fill up all
shallow places to bring same up to grade.
3. Construction of Building
Lay-out and Excavation for Foundation
Construction of concrete foundation and pedestal
Fabrication, Manufacturing and Erection of steel columns
Fabrication of Trusses, Girders, Strut and cross brace
Construction of Roofing and SS gutter
Catch Basin, Waste Water Piping and Storm Drain
4. Architectural
a. Preparation Area
Flooring - 6mm Thick PU Mortar
Ceiling - PVC Ceiling on Light Metal Frame
Walling - PVC Wall on Light Metal Frame
b. Extraction Area
Flooring - 6mm Thick PU Mortar
Ceiling - PVC Ceiling on Light Metal Frame
Walling - PVC Wall on Light Metal Frame
c. Processing Area
Flooring - 6mm Thick PU Mortar
Walling - PVC Wall on Light Metal Frame
Ceiling - PVC Ceiling on Light Metal Frame
4 of 6
e. Filling Room
Flooring - 6 mm thick PU Mortar, * with moisture barrier
Walling - 100mm Thick Polyurethane Insulated Wall Panel
Ceiling - 100mm Thick Polyurethane Insulated Ceiling
f. Pre-Staging Area
Flooring - 6 mm thick PU Mortar,* with moisture barrier
Walling - 100mm Thick Polyurethane Insulated Wall Panel
Ceiling - 100mm Thick Polyurethane Insulated Ceiling
g. Genset Room
Flooring - PU Laminated
Walling - 4” CHB Wall smooth cement plaster finish, Wire Mesh,
with louver
h. Offices
Flooring - Vitrified Floor Tiles
Walling - 4" CHB wall smooth cement plaster finish, epoxy finish
i. QA Laboratory
Flooring - PU Laminated
Walling - 4" CHB wall smooth cement plaster finish, epoxy finish
j. Comfort Room
Flooring - Vitrified Floor Tiles
Walling - 4" CHB wall with Vitrified Wall Tile Finish (floor to ceiling)
o. Roofing
a. Prepainted Galvalume, 0.6mm thick, rib-type with ½” thick thermal
insulation, Double sided foil
b. Provide Ridge Ventilator with SS Insect Screen
5. Plumbing Works
All Plumbing works shall conform to all the rules and regulation of the
National plumbing code and local health authorities.
Plumbing works shall include water service to all fixtures within the building.
Piping shall be concealed whenever possible and shall be carefully pitched
and supported by suitable brackets or hanger.
Minimum slope of soil and waste pipes shall be two (2) percent.
Traps shall be of the same diameter as the waste pipe from the fixture which
they serve.
Pipes:
a. uPVC Sanitary Pipe – Series 1000/SDR 34 Neltex, Atlanta or Approved
Equivalent
b. Water Supply Line – PPR Pipes
c. Down spout – shall be uPVC.
d. Waste water line – *Ø150mm (6 in Ø), HDPE pipe.
6. Fixtures