Structural works
1.1 Substructure works
Roofing
Multilayer Liner-Deck roof system consisting is proposed for roofing. A typical roof section
shall consist of following items
1. Standing seam sheet
2. Insulation
3. E Clip
4. Top hat Sub purlin
5. Vapour control layer
6. Liner-Deck profile steel or aluminum.
Finishing works
1. Floor finishes - Marble, fully vitrified glazed tiles, timber or wood flooring or any other items as
per the discussion with client can be used as flooring material.
2. Infill walls – All infill walls including external and internal partitions for superstructure shall be
of cement board.
3. Ceiling works – False celling works shall be done for which gypsum boards shall be used.
Cement board shall be used in places such as toilets where there is a possibility of contact
with water.
4. Doors – Seasoned Sal wood shall be used for door frames. For door shutters pressed
readymade plywood shutter shall be used.
5. Windows – Aluminum shall be used for all windows and ventilators,
6. Partitions – All partitions shall be made of aluminum framed glazed
7. Expansion joint treatment shall be done as per requirement.
8. Fire proofing – All material for windows, doors and the partitions shall be made fireproof as per
requirement.
9. Painting works – All internal and external wall and ceiling surfaces shall be painted by
emulsion paints. All steel sections shall be sand blasted and painted.
10. Anti-termite treatment – All building area shall be given pre anti-termite application.
Apron shall be made of cement concrete rigid pavement, taxiway and car parking area shall
be made of flexible pavement using asphalt material. All kerbs in the landside area of building