You are on page 1of 33

Inspection Planning for Offshore

Structures
離岸風電運維驗證技術交流會

Dr. Albert Ku, Principal Project Manager and Business Development Manager
23 October 2023
Providing Project Certification experience to:
▪ Project
developer >160 30
▪ Owner offshore wind
offshore wind
▪ Network farms in top emerging
operator
farms
markets

Wind turbine
manufacturer

Component
manufacturer

2 DNV © 23 OCTOBER 2023


Trend and forecast of worldwide energy production

DNV © 23 OCTOBER 2023


3
4 DNV © 23 OCTOBER 2023
Energy Transition Outlook

5 DNV © 23 OCTOBER 2023


LCOE for Onshore/Offshore Wind vs Fossil Fuel
Power Plants

6 DNV © 23 OCTOBER 2023


Offshore wind cumulative and 2020 installations by
countries

7 DNV © 23 OCTOBER 2023


2015-2021 yearly global offshore wind installations

8 DNV © 23 OCTOBER 2023


Global wind resources

Offshore wind power - Wikipedia

9 DNV © 23 OCTOBER 2023


Taiwan - Shallows to West and deep water, typhoons
and big waves to the East!
Suitable Water Depths
BUT still windy/waves
and soil conditions
challenging
&
Liquefaction

DNV © 23 OCTOBER 2023


10
Standards for Offshore Structure Integrity Management

11 DNV © 23 OCTOBER 2023


Destroyed Platforms After Hurricane

12 DNV © 23 OCTOBER 2023


Wave in Deck
Top reason for platform failure in Gulf of Mexico

13 DNV © 23 OCTOBER 2023


Typical Damages for Underwater Members

Tubular joint cracks


Buckled members
Severed braces

14 DNV © 23 OCTOBER 2023


Typical Damages for Splash-Zone Members

Coating failure and excessive corrosion


15 DNV © 23 OCTOBER 2023
MOEA O&M Guideline, General

ISO 19901-9

16 DNV © 23 OCTOBER 2023


SIM Process

ISO 19901-9

API RP-2SIM
17 DNV © 23 OCTOBER 2023
SIM Assessment

• Typhoons, earthquakes, etc.


• Change of condition, e.g., stiffness change detection

18 DNV © 23 OCTOBER 2023


API RP-2SIM Assessment Criteria

19 DNV © 23 OCTOBER 2023


MOEA O&M Guideline, Relevant Sections

20 DNV © 23 OCTOBER 2023


MOEA O&M Guideline, Monitoring Requirement

• For historical offshore platforms (O&G), no monitoring requirement


• O&G platforms all have inspection planning programs

21 DNV © 23 OCTOBER 2023


MOEA O&M Guideline, Inspection Scope

22 DNV © 23 OCTOBER 2023


Frequency & scope

API RP-2SIM

23 DNV © 23 OCTOBER 2023


Baseline, Periodic … Inspections

24 DNV © 23 OCTOBER 2023


MOEA Guideline, Post Extreme Weather

25 DNV © 23 OCTOBER 2023


Post Hurricane Inspection in US

26 DNV © 23 OCTOBER 2023


MOEA Guideline, Post Earthquake

27 DNV © 23 OCTOBER 2023


Example of Post Earthquake Actions

• A platform performance chart is


calculated
• For given earthquake magnitude
and epicenter distances
• Enable quick reactions post-
earthquakes

DNV © 23 OCTOBER 2023


Historical 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Elevation Activity Region Condition


Location Structural System
is Conducted ID
Last 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Anom aly
Insp.
Frame B Trans. Vert. Framing (+)0m to (+)22.25m B6/L3

Frame C Trans. Vert. Framing (+)0m to (+)22.25m B6

Frame E Trans. Vert. Framing (+)0m to (+)22.25m B6

Frame G Trans. Vert. Framing (+)0m to (+)22.25m B6/L3

Frame 2 Broadside Vert. Framing (+)0m to (+)22.25m B5/L3

Frame 4 Broadside Vert. Framing (+)0m to (+)22.25m B5/L3

El (+)22.25 m Horiz. Framing (+)0m to (+)22.25m H3

El (+)22.25 m MSF Box Girder (+)0m to (+)22.25m MSF

El (+)10 m
< (-) 0 m
Horiz. Framing
Below Water Framing
(+)0m to (+)22.25m

(+)0m to (+)22.25m
H3

- * * * * * * * * * * * * * * * * * * * * * * * * * *
• Example program
El (-)12 m Horiz. Framing/CGF

• Floating structure
(-)0m to (-)50m H2 2003 16 16 16 16 16

El (-)28.3 m Horiz. Framing/CGF (-)0m to (-)50m H2 2003 11 11 11 11 11

El (-)50 m Horiz. Framing/CGF (-)50m to (-)125m H1 2003 18 18 18 18 18

El (-)67 m Horiz. Framing/CGF (-)50m to (-)125m H1 2003 example


El (-)88 m Horiz. Framing/CGF (-)50m to (-)125m H1 2003

El (-)125 m Horiz. Framing/CGF (-)50m to (-)125m H1 2003

Row B Trans. Vert. Framing (-)0m to (-)50m B4 2003 7 6 7 7 7 3 7

Row B Trans. Vert. Framing (-)50m to (-)125m B2 2003 1 7 1 7 7 1 7 7 1

Row B Corner Legs (-)0m to (-)50m L2 2003

Row B Corner Legs (-)50m to (-)125m L1 2003

Row B Skirt Sleeves/Mudmats (-)50m to (-)125m L1 2003 2 2 2 2 2

Row C Trans. Vert. Framing (-)0m to (-)50m B4 2003 9 9 9 9 9

Row C Trans. Vert. Framing (-)50m to (-)125m B2 2003 13 3 13 13 3 13 13 3

Row E Trans. Vert. Framing (-)0m to (-)50m B4 2003 9 9 9 9 9

Row E Trans. Vert. Framing (-)50m to (-)125m B2 2003 13 3 13 13 3 13 13 3

Row G Trans. Vert. Framing (-)0m to (-)50m B4 2003 7 5 7 6 7 7 2 7

Row G Trans. Vert. Framing (-)50m to (-)125m B2 2003 1 7 1 7 7 1 7 7 1

Row G Corner Legs (-)0m to (-)50m L2 2003

Row G Corner Legs (-)50m to (-)125m L1 2003

Row G Skirt Sleeves/Mudmats (-)50m to (-)125m L1 2003 2 2 2 2 2

Row 2 Broadside Vert. Framing (-)0m to (-)50m B3 2003 1 10 4 10 3 10 10 4 10

Row 2 Broadside Vert. Framing (-)50m to (-)125m B1 2003 4 12 7 12 12 5 12 12 7

Row 2 Inner Legs (-)0m to (-)50m L2 2003

Row 2 Inner Legs (-)50m to (-)125m L1 2003

Row 4 Broadside Vert. Framing (-)0m to (-)50m B3 2003 1 10 4 10 1 10 10 10

Row 4 Broadside Vert. Framing (-)50m to (-)125m B1 2003 4 12 7 12 12 5 12 12 7

Row 4 Inner Legs (-)0m to (-)50m L2 2003

Row 4 Inner Legs (-)50m to (-)125m L1 2003

Revision: Rev. A Inspection Key Anomaly Codes


Revision Date: 22-Sep-09 General Visual (GVI) Anode Grading (AG) Marine Grow th Measurement C1 Light Corrosion (<10% w astage) DF Displaced/deformed member

Revised By: D. Gallagher Close Visual (CVI) [diver / above w ater surveyor] Flooded Member Detection (FMD) Scour Measurement C2 Moderate Corrosion (10 - 25% w astage) MM Missing member
29 DNV © 23 OCTOBER 2023 Close Visual ROV (R-CVI) NDT ACFM / ECI / MPI Conduct Repairs or Upgrades C3 Heavy Corrosion (>25% w astage) VI Visual indication

CP Measurement (CP) ( * = Drop Cell Only) NDT UT / Thickness Measurement Inspection Completed x% Anode Grade (percent depletion) DB Debris

(Note: Numbers on R-CVI, NDT or FMD indicate quantitiy of required measurements) PD Physical damage (dent, abrasion, etc.)
RBI Development Process

Establish
Long-Term
Define RBI
Inspection Program
Risk Scope
Assessment
Workshop

Reliability
Assessment

Structural
Breakdown

DNV © 23 OCTOBER 2023


API 2SIM Requirement for Above-Water Inspection

31 DNV © 23 OCTOBER 2023


API 2SIM Requirement for Below-Water Inspection

32 DNV © 23 OCTOBER 2023


Thank you

Albert.Ku@dnv.com

www.dnv.com

33 DNV © 23 OCTOBER 2023

You might also like