Professional Documents
Culture Documents
Structures
離岸風電運維驗證技術交流會
Dr. Albert Ku, Principal Project Manager and Business Development Manager
23 October 2023
Providing Project Certification experience to:
▪ Project
developer >160 30
▪ Owner offshore wind
offshore wind
▪ Network farms in top emerging
operator
farms
markets
Wind turbine
manufacturer
Component
manufacturer
ISO 19901-9
ISO 19901-9
API RP-2SIM
17 DNV © 23 OCTOBER 2023
SIM Assessment
API RP-2SIM
El (+)10 m
< (-) 0 m
Horiz. Framing
Below Water Framing
(+)0m to (+)22.25m
(+)0m to (+)22.25m
H3
- * * * * * * * * * * * * * * * * * * * * * * * * * *
• Example program
El (-)12 m Horiz. Framing/CGF
• Floating structure
(-)0m to (-)50m H2 2003 16 16 16 16 16
Revised By: D. Gallagher Close Visual (CVI) [diver / above w ater surveyor] Flooded Member Detection (FMD) Scour Measurement C2 Moderate Corrosion (10 - 25% w astage) MM Missing member
29 DNV © 23 OCTOBER 2023 Close Visual ROV (R-CVI) NDT ACFM / ECI / MPI Conduct Repairs or Upgrades C3 Heavy Corrosion (>25% w astage) VI Visual indication
CP Measurement (CP) ( * = Drop Cell Only) NDT UT / Thickness Measurement Inspection Completed x% Anode Grade (percent depletion) DB Debris
(Note: Numbers on R-CVI, NDT or FMD indicate quantitiy of required measurements) PD Physical damage (dent, abrasion, etc.)
RBI Development Process
Establish
Long-Term
Define RBI
Inspection Program
Risk Scope
Assessment
Workshop
Reliability
Assessment
Structural
Breakdown
Albert.Ku@dnv.com
www.dnv.com