VESSEL : MONTH :
CRANE - 2
1 L.O. Filter 1 month
2 Cooler Air Side Chem Cleaning 3 months
3 Oil Renewal As Reqd
4 Oil Analysis 6 moths
5 Hoist Brake Inspn 1 month
6 Luffing Brake Inspn 1 month
7 Greasing limit mechanism 2 months
8 Greasing points, motor/hinges 2 months
9 Hoist/luff limits check 1 month
10 Slack wire trip check 1 month
11 Slewing Slip Ring Inspn/Cleaning 1 month