You are on page 1of 2

36-VM-16U-02

Issue 12
Page 1 of 2

SmartLine®
VersaFlow Vortex 100 Model Selection Guide
VM02 Size 1/2" to 4" Sandwich

• Secondary pressure containment around sensor


• Easily drained and easy to clean
• Regardless of type of installation and externalfactors
• Excellent zero stability
• Low energy consumption, low operating and installation costs
• Rapid signal processing even with product and temperature changes and sudden changes in density
• Modular electronics concept: electronics and sensor easy to replace
• Data redundancy: accurate plug & play replacement of electronics

Instructions
Select the desired key number. The arrow to the right marks the selection available.
Make the desired selections from Tables I through VIII using the column below the
proper arrow. A dot ( ) denotes availability.

Table I II III IV V VI VII VIII

VM02 - 4 _____ ___ ___ __ _____ _____ __

KEY NUMBER Description Selection Availabili


VM02 VM02

TABLE I
Instrument code 4

TABLE II
Sandwich D/N 15 / 1/2" 2____ a
Sandwich D/N 25 / 1" 4____ b
Sandwich D/N 40 / 1 1/2" 6____ c
Flange Connection size
Sandwich D/N 50 / 2" 7____ d
Sandwich D/N 80 / 3" A____ e
Sandwich D/N 100 / 4" B____ f
PN 16 EN 1092-1 _ 3_ _ _
PN 25 EN 1092-1 _ 4_ _ _
PN 40 EN 1092-1 _ 5_ _ _
PN 63 EN 1092-1 _ 6_ _ _
Pressure Class
PN 100 EN 1092-1 _7___
150 lb ASME _ A_ _ _
300 lb ASME _B___
600 lb ASME _D___
Flange face Sandwich __0__
DN 15 / 1/2" ___2_
DN 25 / 1" ___4_
DN 40 / 1 1/2" ___6_
Sensor Size
DN 50 / 2" ___7_
DN 80 / 3" ___A_
DN 100 / 4" ___B_
Material: Sensor / Sensor 1.4404 (316L) / 1.4435 (316L) / FPM ____1
HC 22 / HC 276 / FPM ____3
gasket / Pressure sensor
1.4404 (316L) / 1.4435 (316L) / FFKM ____5
gasket ____7
HC 22 / HC 276 / FFKM

TABLE III
Standard aluminium 1__
Converter
Aluminium painted for increased requirements 3__

Uncompensated for gases, steam and liquids respectively; temperature compensation for saturated steam _0_ g

Density compensation for overheated steam (only in connection with internal pressure sensor) _1_ h
Software version Density compensation for gases (only in connection with internal pressure sensor) _2_ h
Density compensation for overheated/superheated steam and Gross heat measurement (only in
_3_ h
connection with internal pressure sensor)
Density compensation for gases, wet gases and mixed gases and FAD measurement
_4_ h
(only in combination with internal press. sensor)
Compact __1 m
Design
Separate - alu. Conn. Box Price is based on cable length selected below) __6 n

TABLE IV
Compact Converter no cable. 0__
Separate - 5m / 15ft 1__
Cable length
Separate - 10m / 30ft 2__
Separate - 15m / 45ft 3__
None _0_
EEX Zone 1 - Ex II 2G EEx d ia [ia] IIC T6 _1_
EEX Zone 2 - Ex II 3G EEx nA T4 _2_
Approval IECEx - Ex d ia [ia] IIC T6 Gb _3_
FM Class 1 DIV 1 + FMc _4_
NEPSI - Ex d ia (ia) II C T6 _7_
None __0
Identification stn stl tag (40 x 20 mm) __1
stn stl tag (120 x 46 mm) __2
36-VM-16U-02
Issue 12
Page 2 of 2
TABLE V
None 0_
Integrated pressure sensor 4 bar 3_
Integrated pressure sensor 6 bar 4_
Integrated pressure sensor 10 bar 5_
Integrated pressure sensor 16 bar 6_
Integrated pressure sensor 25 bar Be certain to select 7_
Integrated pressure sensor 40 bar pressure sensor in 8_
Integrated pressure sensor 60 bar A_
Pressure sensor options Integrated pressure sensor 100 bar accordance with B_
Integrated pressure sensor 4 bar with isolation valve pressure requirements C_
Integrated pressure sensor 6 bar with isolation valve D_
Integrated pressure sensor 10 bar with isolation valve on customer's E_
Integrated pressure sensor 16 bar with isolation valve application data sheet F_
Integrated pressure sensor 25 bar with isolation valve G_
Integrated pressure sensor 40 bar with isolation valve H_
Integrated pressure sensor 60 bar with isolation valve K_
Integrated pressure sensor 100 bar with isolation valve L_
Communication HART (Pactware Communication) _0
TABLE VI
Display With 1____
None ( M20 x 1,5 thread) _0___
1/2"NPT _1___
Cable connection
G 1/2 _2___
M 20 x 1,5 _3___
German __1__
Programming language English __3__
French __4__
No Selection None ___V_
None ____0
General confirmations
Certificate of compliance 2.1 acc. EN 10204 ____1
TABLE VII
3 point calibration certificate 0____
Calibration
5 point calibration certificate 1____
None _0___
Pressure test
Pressure test + inspection certificate 3.1 _1___
None __0__
Material confirmation for pressure bearing parts + 3.1 certificate __1__
3.1 certificate plus 10 year storage and traceability of material __2__
Material test / Certificates Material according to NACE MR 0175/ ISO 15156 __4__
PMI of pressure bearing metal parts + APZ 3.1 __7__
Material confirmation for pressure bearing parts + 3.1 certificate + PMI __B__
3.1 certificate plus 10 year storage and traceability of material + PMI __C__
None ___0_
Hardness test
Hardness test of pressure bearing parts +3.1 certificate ___1_
None ____0
Cleaning class 2 ____1
Cleaning Cleaning class 2 + 3.1 (EN 10204) ____2
Cleaning class 1 ____4
Cleaning class 1 + 3.1 (EN 10204) ____5
TABLE VIII
None 0_
Certificates X-ray test of pressure bearing weldings 4_
Dye penetration test on press. weldings 5_
German _1
Manual English _3
French _4
Certificates
General arangement drawing (Contact Honeywell for price and availability)
Inspection & test plan ITP (Contact Honeywell for price and availability)
Welding procedure, welding plan, welder qualification (Contact Honeywell for price and availability)
X-ray test of pressure bearing weldings (See Table VIII)
Dye penetration test of pressure bearing weldings (See Table VIII)
Stress Calculation (Contact Honeywell for price and availability)

RESTRICTIONS
Restrictions Available only with Not Available with
Letter Table Selection Table Selection
a II ___2_
b II ___4_
c II ___6_
d II ___7_
e II ___A_
f II ___B_
g V 0_
h V 0_
m IV 0__
IV _ 3 _, _ 4 _
n
IV 0__