CPT RYAN ROY A BORRA PN(M)

NCSC CL90
FURNITURE

AC DESCRIPTION DURATION PRECEEDI DAYS


TIVI ( DAYS) NG
TY ACTIVITIE
S 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 23 2 2 2 2 2 2 3 3 3 3 3 3 3 3 3 3 4 4 4 4
0 1 2 3 4 5 6 7 8 9 0 1 2 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3

CHAIR

A AUTOMATIC STUDY 15 NONE


FOR CHAIR

B DESIGN CHAIR 5 A

C BUY MATERIALS 6 B
FOR CHAIR SEAT

D MAKE CHAIR SEAT 3 C

E BUY CHAIR 5 B
CASTORS

F BUY STREET FOR 10 B


CHAIR FRAME

G MAKE CHAIR FRAME 3 F

H PAINT CHAIR FRAME 2 G,U

I ASSEMBLE CHAIR 1 D,E,H

J APPLY FINAL 2 I
FINISHES TO CHAIR

DESK

K DESK DESIGN 10 NONE

L BUY STEEL FOR 10 K


DESK FRAME

M MAKE DESK FRAME 5 L,O

N PAINT DESK FRAME 2 M,U

O BUY WOOD AND 5 K


FITTING FOR DESK

P MAKE DESK 6 O
DRAWER

Q MAKE DESK TOP 1 O

R ASSEMBLE DESK 1 N,P,Q

S APPLY FINAL 2 R
FINISHES TO DESK

GENERAL
ACTIVITIES

T DECIDE PAINT 10 NONE


COLORS

U BUY PAINT AND 9 T


VARNISH

V FINAL PROJECT 5 J,S


EVALUATION
NETWORK DIAGRAM
S=6 S=6
C 20 26 D 26 29
6 26 32 3 32 35

S=0 S=0 S=10

FINISH
A 0 15 B 15 20 E 20 25
S=0
15 0 15 5 15 20 5 30 35
I 35 36
S=0 S=0 S=0 1 35 36
F 20 30 S=0
START

G 30 33 H 33 35
10 20 30 3 30 33 2 33 35 J 36 38
2 36 38
S=15
S=15 S=0
T 0 10
U 10 18 V 38 43
10 15 25
8 25 33 5 38 43
S=8 S=8 S=8
S=8
L 10 20 M 20 25 N 25 27
S 28 30
10 18 28 5 28 33 2 33 35 S=8
2 36 38
S=8 R 27 28
K 0 10 S=14 1 35 36
10 8 18 P 15 21
S=14 6 29 35
O 10 15
S=19
5 24 29
Q 15 16
Critical Path = START-A-B-F-G-H-I-J-V-FINISH = 15+5+10+3+2+1+2+5 = 43 DAYS