You are on page 1of 3

23/2/23, 17:06 9R4 - ATR42 - Line Maintenance - 01-Jan-2023 - ATR-A-29-XX-XX-00001-281A-A - Scheduled Inspection of the Hydraulic Fluid Leve…

AIRCRAFT REVISION TAIL NUMBER -


CUSTOMIZATION DOCTYPES TITLE
TYPES DATE MSN
Line 01-Jan- ATR-A-29-XX-XX-00001-281A-A - Scheduled Inspection of the
9R4 ATR42
Maintenance 2023 Hydraulic Fluid Level through the Reservoir Sight Glass

DM status information

DM Code : ATR-A-29-XX-XX-00001-281A-A
Airline : 9R4
Issue Number : 004
Issue Date : Jan 01/23
Breakdown Title : HYDRAULIC POWER
DM Title : Scheduled Inspection of the Hydraulic Fluid Level through the Reservoir Sight Glass
Applicability : ON A/C MSN ALL
Aircraft Type : ATR42
DM Producer : FB429
Language : Simplified English
Copyright : ATR-A-00-65-XX-10000-021A-D

ON A/C MSN ALL


TASK ATR-A-29-XX-XX-00001-281A-A
Scheduled Inspection of the Hydraulic Fluid Level through the Reservoir Sight Glass
FIN: 6007GX
Personnel Required.

Minimum Number of person 1


Skills Airframe
Manhours 0.5 h
Elapsed Time 0.50 h

1. General
A. Reason for the Job
Self Explanatory

2. Job Set-Up Information

A. Work Zones.

ZONE ZONE DESCRIPTION


195 HYDRAULIC COMPARTMENT

B. Access/Panel.

ACCESS/DOOR
195NL ( Door )

C. Referenced Information.

REFERENCE DESIGNATION
ATR-A-12-12-29-00ZZZ-212Z-A MP - Filling of the Hydraulic Reservoir
ATR-A-29-XX-XX-00ZZZ-562Z-A MP - Depressurization of the Green and Blue Hydraulic Systems (Aircraft Source)
ATR-A-29-XX-XX-00ZZZ-762Z-A MP - Pressurization of the Green and Blue Hydraulic Systems (Aircraft Source)

3. Job Set-Up
SUBTASK 29XXXX-10100090001
A. Open access door(s):

about:blank 1/3
23/2/23, 17:06 9R4 - ATR42 - Line Maintenance - 01-Jan-2023 - ATR-A-29-XX-XX-00001-281A-A - Scheduled Inspection of the Hydraulic Fluid Leve…
195NL.

4. Procedure
SUBTASK 29XXXX-60000010001
A. Pressurize the green and blue hydraulic systems with the electric pumps Ref. MP ATR-A-29-XX-XX-00ZZZ-762Z-A.
SUBTASK 29XXXX-60000020001
B. Depressurize the green and blue hydraulic systems and stop the electric pumps Ref. MP ATR-A-29-XX-XX-00ZZZ-562Z-A.
SUBTASK 29XXXX-60000030001
Ref. Fig. Sight Glass Location
C. General Visual Inspection of the Hydraulic Fluid Level through the Reservoir Sight Glass
(1) Do a general visual inspection of the hydraulic fluid level through the sight glass indicator on the top part of the
hydraulic reservoir.
(2) Make sure that the hydraulic pressure values for the green and the blue hydraulic systems are at 0 psi.
(3) Make sure that the hydraulic pressure value for the parking/emergency accumulator is at 3000 psi.
(4) If the fluid level is below the FULL mark, fill the hydraulic reservoir Ref. MP ATR-A-12-12-29-00ZZZ-212Z-A.

5. Close-Up
SUBTASK 29XXXX-10200070001
A. Close Up
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close any access opened/removed before.

Figure ICN-ATR-A-290000-A-FB429-00TVM-A-002-01 SHEET 1/1 - Sight Glass Location

about:blank 2/3
23/2/23, 17:06 9R4 - ATR42 - Line Maintenance - 01-Jan-2023 - ATR-A-29-XX-XX-00001-281A-A - Scheduled Inspection of the Hydraulic Fluid Leve…

FR27A FR30

Z195
A

FLOW
FLOW

BLUE

6007GX

A
TOP FULL
FULL
SIGHT GLASS OIL QUANTITY
REFILL INDICATIONS
LT USG

TOP FULL 9.60 2.54

FULL 9.35 2.47


B
REFILL 8.50 2.25
SIGHT GLASS

ICN-ATR-A-290000-A-FB429-00TVM-A-002-01
Figure ICN-ATR-A-290000-A-FB429-00TVM-A-002-01 (SHEET 1) - Sight Glass Location

© ATR ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

about:blank 3/3

You might also like