You are on page 1of 1

CONTRACTOR TO ENSURE

COMPLIANCE AS PER APPROVED


STRUCTURAL GENERAL NOTES.

ADD EIL REFERNCE DRAWING NUMBER

CLIENT:
GSPL INDIA GASNET LIMITED

GSPL INDIA GASNET LIMITED

CONSULTANT:
ENGINEERS INDIA LIMITED

TPIA:
CERTIFICATION ENGINEERS INTERNATIONAL LTD.

EPC CONTRACTOR: JSIW Infrastructure Pvt.Ltd

DEC:
GENERAL CIVIL COMMENTS: PETROCON ENGINEERS & CONSULTANTS
.
CONTRACTOR TO FURNISH THE CONSOLIDATED COMMENT
RESOLUTION SHEET (CRS) (i.e. comments/ resolution provided since first PROJECT:
submission to latest submission of drawing) WITHOUT CRS THE DRAWINGS
SHALL NOT BE REVIEWED AND SHALL BE DEEMED AS NULL & VOID. CONTRACTORS RESPONSIBILTY TO ENSURE COMPLIANCE AS PER DRAWING MEHSANA–BATHINDA PIPELINE PROJECT
A286-000-16-47-4003 AND EDB A286-000-16-47-EDB-0001 ATTACHED WITH
CONTRACT DOCUMENT. ALSO COMMENTS GIVEN ON DESIGN CALCULATION TITLE:
OF RCC ROAD SHALL BE FOLLOWED AND ENSURED COMPLIANCE. TYPICAL DRAWING OF RCC ROAD

Doc. GIGLM-1004-0000-CS-DRW-TYP-R-0040 Rev. 00 SIZE:


SCALE:
SHEET:

09-APR-2020
RAJESH BHIMRAO THUL (B894)
2 of 2

Page 2 of 2

You might also like