Professional Documents
Culture Documents
Dimensions: Installation Instruction
Dimensions: Installation Instruction
Dimensions
Solar Street Luminaire
511
83
369
23
Voltage : 12.8 V DC
188
IP Classification : IP 65
Net Weight : 19 Kg
Protective
Cover
Luminaire
Switch
Mounting
3 Core Cable Bracket
Note: Remove Shrink Wrap and Protective
cover before installation.
3
Mount the luminaire with the Pole. 4 For Vertical Mounting installation Precaution:
Horizontal Mounting Unscrew the Screw and remove the
pole Mounting Bracket and assemble
it as shown in Fig. B. 1. This luminaire will not operate below 0 degree ambient.
2. Maximum installation height is 5m.
3. Before installation check the luminaire by pressing the switch
Note: Tightened the bolts Vertical Mounting and make sure that it is glowing.
with torque of 8Nm.
4. After three months of manufacturing it is necessary to check the
Fig. A glowing of the luminaire, if it is not working then contact to
customer care.
5. After installation and during commissioning of luminaire, first
Fig. B press the switch to switch it ON and then connect AC 230Vrms
Pole Dia:48 to 60mm
input to the luminaire.
For accurate angle positioning, marks
6. If two red and orange colour LED’s start blinking then first remove
5 Below mentioned inclinations are possible. 6 are made over the clamping position AC input connections and press the switch to switch off the
0°,5°,10°,15°.
of the luminaire. Match the pole
mounting piece marking with luminaire
lumianire and wait for min two minutes. Subsequently follow
marking 15° same commissioning sequence as per point no. 5
0°-15°
7. The Light source of this luminaire is not replaceable; when the
10° light source reaches its end of life the whole luminaire shall be
replaced.
5°
0°
* Note - Representation product images and actual product may vary based on
versions