You are on page 1of 1

S

CTW

Temperature Suhu (°C) Cooling Tower


TC CTW
R Controller Water

Tekanan (atm) Cooling Tower


FC Flow Controller CTWR
Water Return
Titik Neraca
Steam 10 bar
LI Level Indicator Massa (kg/ S
(180°C)
hari)
PI Pressure Indicator R Refrigerant SC Steam Condensate
5
F-110 J-111 J-114 30
1

42 F-410 Tangki Penyimpanan Furfural


J-113 TC
C-112 S-116 16 41 E-344 Heater V
30
Waste
1.27 40 E-343 Cooler III
Asam Sulfat
J-117 39 E-342 Reboiler II
21 38 E-341 Kondensor II
J-118
1
30
1
37 D-340 Menara Distilasi II
LI 30 18
1 FC TC 30
36 L-331 Pompa IX
J-119 TC
1.27
TC FC
35 H-330 Dekanter
F-120 6
2 30 TC
TC
34 L-321 Pompa VIII
1 FC FC

FC
30
LC
11
D-310 D-340
33 M-320 Mixing Tank
1 LC 30 H-330
F-213
5.87 PI 15 FC V-331
20
32 E-142 Heater IV
PI
7 8 10 13 30
Air Proses L-121 30 158 30 H-220 30 14
FC
1.27 30
1
31 L-141 Pompa VII
6 6 5.9 8.8 170
M-122 8.8 V-231
M-320 30 F-140 Tangki Penyimpanan Dietil Eter
R-210 L-221
M-124
L-125 9
29 E-314 Heater III
R-230 L-321 TC
L-123
LI
158
6
LC 28 E-313 Cooler II
Waste
Waste 19
27 E-312 Reboiler I
12
30
1
26 E-311 Kondensor I
F-130 170 22
FC
5.87 30 25 D-310 Menara Distilasi I
1
LC
Waste 24 R-230 Reaktor II
17 23 E-222 Heater II
Dietil Eter 3 30
L-131
30 1.27
22 L-221 Pompa VI
FC
1 21 H-220 Centrifuge
20 L-213 Pompa V
LI
19 F-212 Tangki Akumulator
Refrigerant LI
18 E-211 Cooler I
17 R-210 Reaktor I
16 E-126 Heater I
Udara Keluar
F-140 15 L-125 Pompa IV
Udara Masuk
14 M-124 Mixing Tank II
F-410
13 L-123 Pompa III
12 M-122 Mixing Tank I
11 L-131 Pompa II
FC TC
10 F-130 Tangki Penyimpanan Air
9 L-121 Pompa I
4 8 F-120 Tangki Penyimpanan Asam Sulfat
30
L-141 1
7 J-117 Belt Conveyor IV
6 J-114 Belt Conveyor III
5 S-116 Screening
SC
4 J-113 Belt Conveyor II
3 C-112 Grinder
CTW
2 J-111 Belt Conveyor I
1 F-110 Gudang Penyimpanan Tandan Kosong Kelapa Sawit
Laju Massa (kg/hari) NO KODE ALAT NAMA ALAT
No. Komponen DIRENCANAKAN DAN DIGAMBAR OLEH:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 NO NAMA MAHASISWA NRP PARAF
1 David 160219021
1 Xylan 2,423.8774 605.9694 2,423.8774 2,423.8774 63.0208 63.0208 63.0208 3.1510 59.8697724 59.8697724 59.8697724 0.0000 59.8698 0.0000 0.0000
2 Jonathan Brian 160219049
2 Asam Asetat 174.7989 43.6997 174.7989 174.7989 177.7891 177.7891 177.7891 168.899687 168.899687 168.899687 0.0169 168.8828 0.0172 0.0172
3 Erfan Zawawi 160219067
3 Glucan 3,449.3640 862.3410 3,449.3640 3,449.3640 3,094.0795 3,094.0795 3,094.0795 DOSEN PEMBIMBING: MENYETUJUI
4 Insoluble Lignin 2,412.2242 603.0560 2,412.2242 2,412.2242 2,425.0427 2,425.0427 2,425.0427 1 Dr. Emma Savitri
5 Soluble Lignin 256.3717 64.0929 256.3717 256.3717 243.5531 243.5531 243.5531 2 Prof. Restu Kartiko Widi
6 Asam Sulfat 233.6580 233.6580 233.6580 233.6580 233.6580 233.6580 233.6580 221.975097 221.975097 221.975097 221.9751 FLOWSHEET
7 Air 1,038.8878 3,660.6419 259.7220 3,660.6419 4,699.5298 4,699.5298 4,399.3240 4,399.3240 4,399.3240 4179.35782 4179.35782 5019.83583 5019.3338 0.5020 5019.4119 4617.5622 404.9497 404.9092 0.0405 DESAIN PROYEK PABRIK FURFURAL DARI TANDAN KELAPA SAWIT
8 Abu 629.2759 157.3190 629.2759 629.2759 629.2759 629.2759 629.2759 629.2759 DENGAN PROSES HIDROLISA-DEHIDRASI KATALITIK KAPASITAS 5.000
9 Xylose 2,546.7564 2,546.7564 2,546.7564 127.3378 2419.41855 2419.41855 84.6796492 84.6796 TON/TAHUN
10 Glukosa 380.6611 380.6611 380.6611 380.6611 JURUSAN TEKNIK KIMIA
11 Furfural 85.7871 85.7871 85.7871 4.2894 81.4977305 81.4977305
1575.75862 1575.7586 0.0000 1575.7678 28.2997 1544.3681 0.1544 1544.2137 FAKULTAS TEKNIK
12 Dietil Eter 1,215.5866 1215.58663 70.7492 1144.8375 1144.7942 0.0000 UNIVERSITAS SURABAYA
2023
Total 10,384.7998 233.6580 3,660.6419 1,215.5866 2,596.2000 3,894.2999 14,279.0998 14,279.0998 14,278.9477 14,278.9477 14,278.9477 1,144.7151 7,131.0187 7,131.0187 7,131.0187 6,595.1094 535.9093 7,810.7835 4,716.6282 3,094.1553 1,549.8579 1,544.2542

You might also like