TIME SCHEDULE PEKERJAAN HARDSCAPE HOTEL MERCURE PANGKALAN BUN

PT. LOKACIPTA MANDIRI MULYA

Persiapan M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13


No Pekerjaan Bobot Durasi April'23 Mei'23 Juni'23 Juli'23
16-22 23-29 30-6 07-13 14-20 21-27 28-03 04-10 11-17 18-24 25-01 02-08 09-15 16-22

3.A ZONA 3 ( EXECUTIVE PARKING)


Atap membran AGT ex 851 OP 1 850 gsm PVDF
Luas 21.45 m x 5.05 m = 129,6 m2
1 2.896% 2 1.448% 1.448%
Aksesories :sling 6 mm clamplate : alm 3 mm
asdrat, mur baut stainless
Rangka pipa black stell 4", 3 " dan 2 " medium Aksesories plate 6, 10 mm
2 0.798% 2 0.399% 0.399%

3 Pengecatan : ftalit ( white / cream ) 0.157% 2 0.079% 0.079%


4 Jasa instalasi rangka dan membran 0.342% 3 0.114% 0.114% 0.114%
Pondasi beton bertulang & chemical hilti dgn angkur 3/4 x 500 mm finish
5 cat Mowilex warna grey 0.161% 1 0.161%

3.B CENTRAL PARK


I Pembuatan Walk Way
1 Galian tanah dan pemadatan sesuai Elevasi rencana 0.168% 3 0.056% 0.056% 0.056%
2 Pasir urug dibawah Concrete (tebal 50mm) 0.093% 3 0.031% 0.031% 0.031%
3 Lantai kerja (tebal 50mm) K100 0.673% 3 0.224% 0.224% 0.224%
4 Concrete
- Beton K250 2.525% 4 0.631% 0.631% 0.631% 0.631%
- Besi waremesh M10 (2 Layer) 2.694% 4 0.674% 0.674% 0.674% 0.674%
- Bekisting 0.465% 4 0.116% 0.116% 0.116% 0.116%
5 Pasang granit roman, kombinasi list
Fin. kombinasi (granite roman type dkilimanjaro Volcanic,dTambora 8.249% 5 1.650% 1.650% 1.650% 1.650% 1.650%
Charcoal, List Border Walk Way Ex Roman dFuji Dark)

6 Kansteen 15*40*60 2.172% 4 0.543% 0.543% 0.543% 0.543%


II Pekerjaan Tambah Parapet / DPT Walkway Central Park
1 Galian 0.508% 3 0.169% 0.169% 0.169%
2 Pasir urug t = 10 cm 0.125% 3 0.042% 0.042% 0.042%
3 Lantai Kerja t = 5 cm 0.454% 3 0.151% 0.151% 0.151%
4 Bekisting 7.204% 3 2.401% 2.401% 2.401%
5 Besi D13 -100 (2 Layer) 13.910% 6 2.318% 2.318% 2.318% 2.318% 0.0232 2.318%
6 Beton Mutu K-250 8.994% 6 1.499% 1.499% 1.499% 1.499% 1.499% 1.499%
7 Finishing dinding andesit uk. 60 x 20 x 2 cm 2.322% 5 0.464% 0.464% 0.464% 0.464% 0.464%
8 Copping Andesit uk. 60 x 30 x 2 cm 1.152% 3 0.384% 0.384% 0.384%
9 Pipa Drainage PVC 2" 0.304% 2 0.152% 0.152%
III Pembuatan system Drainase
1 Galian 0.374% 3 0.125% 0.125% 0.125%
2 Pasir urug t = 5cm 0.035% 3 0.012% 0.012% 0.012%
3 Lantai Kerja t = 5 cm 0.253% 3 0.084% 0.084% 0.084%
4 Bekisting 5.090% 3 1.697% 1.697% 1.697%
5 Besi Saluran Gutter D10 - 150 (1Layer) 2.063% 3 0.688% 0.688% 0.688%
6 Beton Mutu K-250, t=10 cm 0.199% 4 0.050% 0.050% 0.050% 0.050%
7 Beton Mutu K-250, t=10 cm 2.172% 4 0.543% 0.543% 0.543% 0.543%
8 Grill Plat Stri besi fin.Cat uk. Lebar 250 mm 7.113% 3 2.371% 2.371% 2.371%
9 Loose Peeble 3 - 5 cm warna hitam 0.484% 2 0.242% 0.242%
IV Pergola Portal
1 Galian tanah dan pemadatan sesuai Elevasi rencana 0.017% 1 0.017%
2 Pasir urug dibawah Concrete (tebal 50mm) 0.003% 1 0.003%
3 Lantai kerja (tebal 50mm) 0.019% 1 0.019%
4 Concrete
- Beton K250 0.132% 1 0.132%
- Besi D13 - 100 (2 Layer) 0.204% 1 0.204%
- Bekisting 0.148% 1 0.148%
- Angkur dia 16 mm, panjang 300mm 0.483% 1 0.483%
- Pedestal Pergola 15x20x12 0.241% 1 0.241%
Pergola kayu ulin (10x15) uk.lebar 235 cm, tinngi 300 cm 5pcs per
5 module (2 unit) 0.563% 2
0.282% 0.282%
6 Finishing Plolyurethane 0.352% 1 0.352%
V Shelter
1 Galian tanah dan pemadatan sesuai Elevasi rencana 0.021% 1 0.021%
2 Pasir urug dibawah Concrete (tebal 50mm) 0.003% 1 0.003%
3 Lantai kerja (tebal 50mm) 0.019% 1 0.019%
4 Concrete
- Beton K250 0.171% 1 0.171%
- Besi D13 - 100 (2 Layer) 0.265% 1 0.265%
- Bekisting 0.183% 1 0.183%
- Angkur dia 16 mm, panjang 300mm 0.193% 1 0.193%
Rangka utama Pergola kayu Ulin uk 10cm x 20 cm: panjang 4m, tinggi
3m (4 unit) 0.579% 2
5 0.290% 0.290%
6 Circle kisi-kisi pergola (4 unit) 1.158% 2 0.579% 0.579%
7 Bangku Kayu Ulin 4cmx6cm 0.139% 2 0.069% 0.069%
8 Penguat rangka Plat besi 4cm x 8cm (4 unit) 0.591% 2 0.296% 0.296%
9 Finishing Propan EDL 601 Twalight teak (4 unit) 0.495% 1 0.495%
VI Wood Bench+ cor
Bangku kayu Bengkirai uk: 30cmx15cmx200cm, dengan pedestail
1 40mmx12mmx500mm,dan angkur dia 16, panjang 30cm fin. Polyooritan 0.322% 2 0.161% 0.161%
natural colour

VII Circle Bench + cor


1 Galian tanah dan pemadatan sesuai Elevasi rencana 0.015% 1 0.015%
2 Pasir urug dibawah Concrete (tebal 50mm) 0.007% 1 0.007%
3 Lantai kerja (tebal 50mm) 0.050% 1 0.050%
4 Concrete
- Beton K250 0.302% 1 0.302%
- waremesh M6 (1 Layer) 0.193% 1 0.193%
- Bekisting 0.253% 1 0.253%
5 Decking uk: 3x15x150 0.752% 2 0.376% 0.376%
Finishing dinding dan topbanch kayu ulin uk: 3x15x50, fin. Polyooritan
6 natural colour 0.090% 1 0.090%

VIII Tempat duduk batu alam (by Owner)


IX Area Amphytheater
Bench Amphiteater
1 Galian tanah dan pemadatan sesuai Elevasi rencana 0.039% 1 0.039%
2 Pasir urug dibawah Concrete (tebal 50mm) 0.004% 1 0.004%
3 Lantai kerja (tebal 50mm) 0.030% 1 0.030%
4 Concrete
- Beton K250 0.130% 1 0.130%
- Besi D13 - 150 (2 Layer) 0.163% 1 0.163%
- Bekisting 0.347% 1 0.347%
- Pondasi batu kali 0.178% 1 0.178%
5 Fin. Kayu ulin 3 x 10 x 50 cm 0.756% 2 0.378% 0.378%
6 Dinding untuk topping atas 3 x 20 0.117% 1 0.117%
X Plaza amphytheather
1 Concrete
- Beton K250 0.344% 1 0.344%
- Wiremesh M6 (1 layer) 0.220% 1 0.220%
- Bekisting 0.021% 1 0.021%
2 Koral sikat 0.199% 1 0.199%
Fin, Combinasi (granite roman type d Vesivio Ash, Ex Roman dVesivio
3 Graphitie) 0.930% 1 0.930%

4 Kansteen 0.135% 2 0.068% 0.068%


XI Fountain Central Park
Pembuatan kolam hias
1 Fin.lantai type ex Roman dTidore Grigio 1.228% 2 0.614% 0.614%
2 Dinding kolam eks roman dTidore Avoiro 0.133% 2 0.067% 0.067%
Decking Kayu ulin
1 Galian tanah dan pemadatan sesuai Elevasi rencana 0.013% 1 0.013%
2 Pasir urug dibawah Concrete (tebal 50mm) 0.017% 1 0.017%
3 Lantai kerja (tebal 50mm) 0.126% 1 0.126%
4 Concrete
- Beton K250 0.474% 1 0.474%
- Wiremesh M6 (1 layer) 0.303% 1 0.303%
- Bekisting 0.128% 1 0.128%
Decking kayu ulin uk : 3x10x400cm dan dudukan lantai kayu ulin
5 4x6x400cm 3.356% 3 1.119% 1.119% 1.119%

XII Bench Fountain


1 Galian tanah dan pemadatan sesuai Elevasi rencana 0.001% 1 0.001%
2 Pasir urug dibawah Concrete (tebal 50mm) 0.001% 1 0.001%
3 Lantai kerja (tebal 50mm) 0.006% 1 0.006%
4 Concrete
- Beton K250 0.043% 1 0.043%
- Wiremesh M6 (2 layer) 0.054% 1 0.054%
- Bekisting 0.118% 1 0.118%
5 Finishing kayu ulin 3x10x240 0.547% 1 0.547%
6 Finishing Granite eks Roman dCandi Charcoal 0.019% 1 0.019%
3.C ZONA 6 Motorcycle Park (Draw AN.LS.HD.GF. 009 & 010)
1 Kanstain 0.692% 2 0.346% 0.346%
2 Canopy Parkir (termasuk Pek. Pondasi, rangka besi pipa dan atap 3.825% 2 1.912% 1.912%
wiremesh)
3.D ZONA 9 COORTYARD
1 Kombinasi Loose Pebble dan Natural Stone 0.602% 2 0.301% 0.301%
Wood Bench (Kayu Ulin) Panjang 1160mm, termasuk alat bantu, dan
2 kelengkapan lainnya sesuai gambar 0.107% 1 0.107%

3 Pasangan Granite uk. 150 X 900 mm 0.423% 1 0.423%


4 Stapping Stone 0.148% 1 0.148%
5 Pekerjaan Etnic Light Lampu Toro 0.161% 1 0.161%
3.E ZONA 10 ROOF GARDEN LT. 1
1 Wood Deck 1.643% 2 0.822% 0.822%
2 Bench (Kayu ulin uk: 50 x 2,69 cm, fin : EDL 601 Propan) 0.107% 2 0.054% 0.054%

100.000%
Jumlah bobot perminggu 0.000% 0.350% 0.434% 3.448% 11.313% 11.077% 9.947% 9.646% 9.877% 10.925% 13.928% 10.809% 5.155% 3.092%

Bobot kumulatif 0.350% 0.784% 4.232% 15.545% 26.622% 36.569% 46.215% 56.091% 67.016% 80.944% 91.753% 96.908% 100.00%

Aktual bobot perminggu


Aktual bobot kumulatif
TIME SCHEDULE PEKERJAAN HARDSCAPE HOTEL MERCURE PANGKALAN BUN
PT. LOKACIPTA MANDIRI MULYA

Maret April Mei Juni


No Pekerjaan Bobot Durasi
20-26 27-31 1-8 9 - 15 16 - 22 23-30 1-7 8 - 14 15-21 22-28 29-31 1-8 9 - 15

3.A ZONA 3 ( EXECUTIVE PARKING)


Atap membran AGT ex 851 OP 1 850 gsm PVDF
Luas 21.45 m x 5.05 m = 129,6 m2
1 #REF! 2 #REF! #REF!
Aksesories :sling 6 mm clamplate : alm 3 mm
asdrat, mur baut stainless
Rangka pipa black stell 4", 3 " dan 2 " medium Aksesories plate 6, 10 mm
2 #REF! 2 #REF! #REF!

3 Pengecatan : ftalit ( white / cream ) #REF! 2 #REF! #REF!


4 Jasa instalasi rangka dan membran #REF! 3 #REF! #REF! #REF!
Pondasi beton bertulang & chemical hilti dgn angkur 3/4 x 500 mm finish
5 cat Mowilex warna grey #REF! 1 #REF!

3.B CENTRAL PARK


I Pembuatan Walk Way
1 Galian tanah dan pemadatan sesuai Elevasi rencana #REF! 3 #REF! #REF! #REF!
2 Pasir urug dibawah Concrete (tebal 50mm) #REF! 3 #REF! #REF! #REF!
3 Lantai kerja (tebal 50mm) K100 #REF! 3 #REF! #REF! #REF!
4 Concrete
- Beton K250 #REF! 4 #REF! #REF! #REF! #REF!
- Besi waremesh M10 (2 Layer) #REF! 4 #REF! #REF! #REF! #REF!
- Bekisting #REF! 4 #REF! #REF! #REF! #REF!
5 Pasang granit roman, kombinasi list
Fin. kombinasi (granite roman type dkilimanjaro Volcanic,dTambora #REF! 5 #REF! #REF! #REF! #REF! #REF!
Charcoal, List Border Walk Way Ex Roman dFuji Dark)

6 Kansteen 15*40*60 #REF! 4 #REF! #REF! #REF! #REF!


II Pekerjaan Tambah Parapet / DPT Walkway Central Park
1 Galian #REF! 3 #REF! #REF! #REF!
2 Pasir urug t = 10 cm #REF! 3 #REF! #REF! #REF!
3 Lantai Kerja t = 5 cm #REF! 3 #REF! #REF! #REF!
4 Bekisting #REF! 3 #REF! #REF! #REF!
5 Besi D13 -100 (2 Layer) #REF! 4 #REF! #REF! #REF! #REF!
6 Beton Mutu K-250 #REF! 4 #REF! #REF! #REF! #REF!
7 Finishing dinding andesit uk. 60 x 20 x 2 cm #REF! 5 #REF! #REF! #REF! #REF! #REF!
8 Copping Andesit uk. 60 x 30 x 2 cm #REF! 3 #REF! #REF! #REF!
9 Pipa Drainage PVC 2" #REF! 2 #REF! #REF!
III Pembuatan system Drainase
1 Galian #REF! 3 #REF! #REF! #REF!
2 Pasir urug t = 5cm #REF! 3 #REF! #REF! #REF!
3 Lantai Kerja t = 5 cm #REF! 3 #REF! #REF! #REF!
4 Bekisting #REF! 3 #REF! #REF! #REF!
5 Besi Saluran Gutter D10 - 150 (1Layer) #REF! 3 #REF! #REF! #REF!
6 Beton Mutu K-250, t=10 cm #REF! 4 #REF! #REF! #REF! #REF!
7 Beton Mutu K-250, t=10 cm #REF! 4 #REF! #REF! #REF! #REF!
8 Grill Plat Stri besi fin.Cat uk. Lebar 250 mm #REF! 3 #REF! #REF! #REF!
9 Loose Peeble 3 - 5 cm warna hitam #REF! 2 #REF! #REF!
IV Pergola Portal
1 Galian tanah dan pemadatan sesuai Elevasi rencana #REF! 1 #REF!
2 Pasir urug dibawah Concrete (tebal 50mm) #REF! 1 #REF!
3 Lantai kerja (tebal 50mm) #REF! 1 #REF!
4 Concrete
- Beton K250 #REF! 1 #REF!
- Besi D13 - 100 (2 Layer) #REF! 1 #REF!
- Bekisting #REF! 1 #REF!
- Angkur dia 16 mm, panjang 300mm #REF! 1 #REF!
- Pedestal Pergola 15x20x12 #REF! 1 #REF!
Pergola kayu ulin (10x15) uk.lebar 235 cm, tinngi 300 cm 5pcs per
5 module (2 unit) #REF! 2
#REF! #REF!
6 Finishing Plolyurethane #REF! 1 #REF!
V Shelter
1 Galian tanah dan pemadatan sesuai Elevasi rencana #REF! 1 #REF!
2 Pasir urug dibawah Concrete (tebal 50mm) #REF! 1 #REF!
3 Lantai kerja (tebal 50mm) #REF! 1 #REF!
4 Concrete
- Beton K250 #REF! 1 #REF!
- Besi D13 - 100 (2 Layer) #REF! 1 #REF!
- Bekisting #REF! 1 #REF!
- Angkur dia 16 mm, panjang 300mm #REF! 1 #REF!
Rangka utama Pergola kayu Ulin uk 10cm x 20 cm: panjang 4m, tinggi
3m (4 unit) #REF! 2
5 #REF! #REF!
6 Circle kisi-kisi pergola (4 unit) #REF! 2 #REF! #REF!
7 Bangku Kayu Ulin 4cmx6cm #REF! 2 #REF! #REF!
8 Penguat rangka Plat besi 4cm x 8cm (4 unit) #REF! 2 #REF! #REF!
9 Finishing Propan EDL 601 Twalight teak (4 unit) #REF! 1 #REF!
VI Wood Bench+ cor
Bangku kayu Bengkirai uk: 30cmx15cmx200cm, dengan pedestail
1 40mmx12mmx500mm,dan angkur dia 16, panjang 30cm fin. Polyooritan #REF! 2 #REF! #REF!
natural colour

VII Circle Bench + cor


1 Galian tanah dan pemadatan sesuai Elevasi rencana #REF! 1 #REF!
2 Pasir urug dibawah Concrete (tebal 50mm) #REF! 1 #REF!
3 Lantai kerja (tebal 50mm) #REF! 1 #REF!
4 Concrete
- Beton K250 #REF! 1 #REF!
- waremesh M6 (1 Layer) #REF! 1 #REF!
- Bekisting #REF! 1 #REF!
5 Decking uk: 3x15x150 #REF! 2 #REF! #REF!
Finishing dinding dan topbanch kayu ulin uk: 3x15x50, fin. Polyooritan
6 natural colour #REF! 1 #REF!

VIII Tempat duduk batu alam (by Owner)


IX Area Amphytheater
Bench Amphiteater
1 Galian tanah dan pemadatan sesuai Elevasi rencana #REF! 1 #REF!
2 Pasir urug dibawah Concrete (tebal 50mm) #REF! 1 #REF!
3 Lantai kerja (tebal 50mm) #REF! 1 #REF!
4 Concrete
- Beton K250 #REF! 1 #REF!
- Besi D13 - 150 (2 Layer) #REF! 1 #REF!
- Bekisting #REF! 1 #REF!
- Pondasi batu kali #REF! 1 #REF!
5 Fin. Kayu ulin 3 x 10 x 50 cm #REF! 2 #REF! #REF!
6 Dinding untuk topping atas 3 x 20 #REF! 1 #REF!
X Plaza amphytheather
1 Concrete
- Beton K250 #REF! 1 #REF!
- Wiremesh M6 (1 layer) #REF! 1 #REF!
- Bekisting #REF! 1 #REF!
2 Koral sikat #REF! 1 #REF!
Fin, Combinasi (granite roman type d Vesivio Ash, Ex Roman dVesivio
3 Graphitie) #REF! 1 #REF!

4 Kansteen #REF! 1 #REF!


XI Fountain Central Park
Pembuatan kolam hias
1 Fin.lantai type ex Roman dTidore Grigio #REF! 2 #REF! #REF!
2 Dinding kolam eks roman dTidore Avoiro #REF! 2 #REF! #REF!
Decking Kayu ulin
1 Galian tanah dan pemadatan sesuai Elevasi rencana #REF! 1 #REF!
2 Pasir urug dibawah Concrete (tebal 50mm) #REF! 1 #REF!
3 Lantai kerja (tebal 50mm) #REF! 1 #REF!
4 Concrete
- Beton K250 #REF! 1 #REF!
- Wiremesh M6 (1 layer) #REF! 1 #REF!
- Bekisting #REF! 1 #REF!
Decking kayu ulin uk : 3x10x400cm dan dudukan lantai kayu ulin
5 4x6x400cm #REF! 1
#REF!
XII Bench Fountain
1 Galian tanah dan pemadatan sesuai Elevasi rencana #REF! 1 #REF!
2 Pasir urug dibawah Concrete (tebal 50mm) #REF! 1 #REF!
3 Lantai kerja (tebal 50mm) #REF! 1 #REF!
4 Concrete
- Beton K250 #REF! 1 #REF!
- Wiremesh M6 (2 layer) #REF! 1 #REF!
- Bekisting #REF! 1 #REF!
5 Finishing kayu ulin 3x10x240 #REF! 1 #REF!
6 Finishing Granite eks Roman dCandi Charcoal #REF! 1 #REF!
3.C ZONA 6 Motorcycle Park (Draw AN.LS.HD.GF. 009 & 010)
1 Kanstain #REF! 1 #REF!
2 Canopy Parkir (termasuk Pek. Pondasi, rangka besi pipa dan atap #REF! 2 #REF! #REF!
3.D wiremesh)
ZONA 9 COORTYARD
1 Kombinasi Loose Pebble dan Natural Stone #REF! 1 #REF!
Wood Bench (Kayu Ulin) Panjang 1160mm, termasuk alat bantu, dan
2 kelengkapan lainnya sesuai gambar #REF! 1 #REF!

3 Pasangan Granite uk. 150 X 900 mm #REF! 1 #REF!


4 Stapping Stone #REF! 1 #REF!
5 Pekerjaan Etnic Light Lampu Toro #REF! 1 #REF!
3.E ZONA 10 ROOF GARDEN LT. 1
1 Wood Deck #REF! 1 #REF!
2 Bench (Kayu ulin uk: 50 x 2,69 cm, fin : EDL 601 Propan) #REF! 1 #REF!

#REF!
Jumlah bobot perminggu #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Bobot kumulatif #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Aktual bobot perminggu


Aktual bobot kumulatif