Chair:
Action log completed b
Attendees:
Apologies
Distribution
Ref Issue
1.0 DESIGN
Resin type
1.3 (epoxy VS
polyrethane)
Floor joint
1.5
detail
Security door
1.6
at NE
Security doors
1.7
at north
relocation of
1.8
utility services
Compressed
1.9
air network
1.10
PROCUREME
2.0
NT
2.1 Resin
2.2 escalier
gas exhausts
2.3
on roof
2.4
3.0 WORKS
Siphoid
3.1
network
Existing wall
3.2
opening
3.3 Concrete pour
3.4 Micorpilling
3.5 Crinolines
removal of wall
3.6
between F4-7
3.7
HEALTH &
4.0
SAFETY
4.2
5.0 HANDOVERS
5.1
6.0 PLANNING
Timing follow-
6.1
up
MISCELLANE
7.0
OUS
Minutes
7.1
Upgrade
B&U - POP - PACKING: Packing 3
Gerardo Wastenes
Gerardo Wastenes
Luca Nardo (LN) - Mathieu Gris (MG) - Elodie Couturier (EC)
Yoann Saintot (YT) - Maxime Gosselin (MG) - Alexandre Besnard (AB)
Francois Montuy (FM) - Manoel Hoguet (MG)
Stephane Treunet (ST) - Guillaume Lavieu (GL)
As above
Action
epoxy installed at Packing 2, query on wether it would be worth to install a more resistant
mixture (polyrethane) to Packing 3 (cost?)
Floor joint detail between concrete resin floor to be obtained and shared with stakeholders
(E80, factory) for approval
gas/sprinkler compressed air pipes to be raised at 2 different locations at the east elevatio
of the packing 3 (inside existing building)
Missing information on POP equipment requirements for tendering to be launced
set of stairs over siphoid pipes at south elevation, no person from factory can advise on
load that existing Packing roof can receive - explore solution of 2nd crinoline
installation of crinolines
Works validated by HSE, B&U and POP. Input from Quality team
Sandwich panel fell on operative's head who was removing the protective plastic film while
suspended from crane
Have the same level of detail (zone and day) as AES DANA for all other external companie
working inside packing 3 from S21 forward (until building delivery)
For next meeting add a "due date" column and a critical tier column
Open 4
Ongoing 14
Done 2
Date: 20-Mar-2023
Time: 15:00
Next
27-Mar-2023
Meeting
Packing/
W20 ongoing
POP
B&U ongoing
E&A ongoing
B&U/
ongoing
POP
POP Ongoing
B&U ongoing
B&U ongoing
B&U open
W19 &
B&U ongoing
21
Packing W6 done
For some equipment we won't have the exact surface by the date needed, it should be eno
with the previous estimates presented. To be followed up.
Linked to previous resin point, good opportunity visit of supplier this week to clarify any qu
Point to discuss with Letitia, do we have the required number of fire exits? If we don't do i
problem? Zach will take the lead, with support from Mathieu.
Budget to take into account around 8k€, be careful with delay for components.
First feedback from supplier received, next action will be to place order, however best opti
until installation of line 4 .
Gerardo to check this action is correctly added into the timeline
Meeting lead by Gerardo done. Requirements from Fréderique taken into consideration and
installation added to B&U planning. Recap of the discussion sent in separate e-mail. Action
To be done in 3 steps:
- W19: Between F5/6/7
-W21: Between F4/5
-W24: All the rest
Monday, Tuesday,Wednesday W14.From 6am until 2pm
- Validated by production plan
meeting held on 13/2/23 to perform the GSTD, review the method statement and adapt ac
operative has been red carded
To discuss for next meeting?
Yes
No
Yes
No
Yes
Yes
No
Yes
Yes
Yes
Yes
No
No
No
Yes
Yes
Yes
No
No
Yes