You are on page 1of 6

Technical rider

Show: "Prometheus`22"
COMPANY
1. Theatre’s name: Hungarian Theatre of Cluj
2. Address: Str. Emil Isac nr.26-28 Cluj-Napoca, Romania
3. Director:Gábor Tompa
4. Contact person: Zoltán Csép tel: 0040-742-557857
E-mail:zoltan.csep@huntheater.ro office@huntheater.ro
5. Technical manager: Levente Borsos tel: 0040-744-392673
E-mail: borsoslevente@yahoo.com
INFORMATION ABOUT THE SHOW

1. Title: Prometheus`22

2. Author:adaptation after Aeschylus Prometheus bound by Ágnes Kali


and Gábor Tompa

3. Directed by: Gábor Tompa

4. Assistant director: Erwin Șimșensohn

5. Dramaturgy: Ágnes Kali

6. Elements of décor and costumes : Carmencita Brojboiu

7. Original music: Vasile Șirli

8. Coreography: Ferenc Sinkó

9. Video: Radu Daniel

10. Set and costumes assistent: Gyopár Bocskai

11. Stage manager: Réka Zongor


Running time: 1h 30min Intermission(s): None

Staff on tour: Technical crew : 9 Artists: 18

Required dimensions:
Stage opening 10mx6m
Stage’s dimension 18mx16m
Height of grid: 12m min.
Fly line drift 11m
Batten lenght 12m
Batten capacity 150kg min.

Stage:
General remarks:
• The stage and the fly bars will be entirely clear before the coming of the technical crew.
• Allow a ramp or a fork lift for loading/unloading.
• Unless verbal agreement between both venues, the schedule of the technical rider must be respected.
• Black, even floor (a 1% rake is accepted)
• Cleaning the stage is necessary before rehearsals and performances
• The use of the auditorium is necessary, a middle corridor is necessary
• There will be water on stage
• As the production uses smoke effects the venue smoke detectors should be isolated prior to the show
• We must screw the set elements to the floor
• 10 chairs on stage, behind the set
• An adequate place with table, chair in the lobby for our promotional materials
• There are scenes in which the actors are smoking
• Please provide a Genie lift (Genie aerial work platform AWP20-S) will be used by actors as part of the set

Equipment required:
Quantity Equipment Description
1 Genie AWP-20S Needed as part of the set
1 Set of black backdrop, legs, suffites
2 Ladder(s) Height of work: 8 m
3 Automatic screwdriver
4 Props table(s) 1mx1m
5 Dressing room(s) minimum With mirrors, table, towels, drinking water, shower
1 Washing machine
1 Dryer
2 Iron and iron board
2 Hair dryer
1 Electric shaver
1 Hair-curler

Equipment supplied by the Hungarian Theatre of Cluj


Quantity Equipment Description
The whole set

Props:
To provide for each rehearsal and performance (will be discussed separately):
Quantity Equipment Description
Light:
General remarks:
• All spotlights will be provided with clamps, safety cables, colour frames, iris and all necessary accessories.
The equipment will be supplied with the necessary cables.

Quantity Equipment Description


60 Circuits on stage 2,4 KW
1 Lighting board Compulite Micron 4D or Compulite SparkTop
4 Moving heads Spot preffered (we use Ispot 575EB)
18 Profiles ETC 750W / 25° - 50°
24 Par 64 1000W CP 61
10 Par 64 1000W Cp62 backstage
14 PC on stage 1000W 1 KW / 60° with barn doors(15)
4 Stands Adjustment from 1 to 2 m high
4 Stands Adjustment from 2 to 4m high
2 T-bars for the stands
All the necessary cables and clamps All items will be hanged on fly bars above the set

Equipment supplied by the Hungarian Theatre of Cluj


Quantity Equipment Description
1 Lighting board Compulite SparkTop
4 Led bar 150W
4 Sunstrip bar 800W w each
2 Smoke machine

- All the devices of the company have a Schucko connector, 220V, 50Hz in case of differences please
provide adequate adaptors for them
Sound:
Equipment required:
Quantity Equipment Description
1 Main Mixing board 16 in, 8 buses
FOH Nexo Ps15-series or similar (LRC plus Ls500 subs)
4 Active speaker Stage monitoring, behind the set
Wireless lavalier mics, bodypack transmitters,
4 Sennheiser ew500 series
receivers
3 Sennheiser ew500 series Wireless handheld microphone, receiver
4 Intercom Light booth, sound booth, stage manager, fly man
2 Intercom Stage, wireless!

Equipment supplied by the Hungarian Theatre of Cluj


Quantity Equipment Description
1 MacbookPro Playback from Qlab
1 DIGIDESIGN external soundcard Connected to the mixer

- All the devices of the company have a Schucko connector, 220V, 50Hz in case of differences please
provide transformers, adequate adaptors for them

Video:
Equipment required:
7000Ansi min. with different lenses (choosing the
2 Video projector right one depends on the position of the projector for
the subtitles and the projected film during the show)
It will be hanged on a fly bar above the audience area
2 Hanging system for the projector
or from FOH
1 Video camera For stage monitoring
2 Tv set Min 37cm for stage monitoring (behind the set)
The necessary cables for video

Equipment supplied by the Hungarian Theatre of Cluj


1 Laptop For the projected films with Resolume
2 Video cameras Used by actors during the show
2 Wireless video transmitters For the cameras
2 Video monitors As part of the set
2 Battery (UPS800) For the video monitors

Subtitles – ( performance in Hungarian, Romanian, Slovenian and English with Hungarian, Romanian and
Slovenian subtitles)
Equipment required:
1 Laptop For ppt files with Resolume
2 TV-set On stand stage left and right
1 Video projector For subtitles
1 Video screen Above the stage (front) for subtitles

Dressing rooms:
General remarks:
• All dressing rooms fitted with toilet, shower, table, mirror, make up light, keys.
• Space for 7 actors, 9 actress
• Separate room for the technical crew (9 persons)
• Still water and towels will be provided.
Schedule:

Chiefectrician

Maintenance/
cleaning man
Technician

Electrician
chief/Tech
Required technicians.

Prop man
Date Timetable Description

Dresser
Flyman
Sound
Crew
9h– 10h Unloading,get in 1 6 1 1 1 1 1
Day 1 10h – 13h Set up, lights set up also 1 4 1 1 1 2 1 1
14h – 18h Set up goes on 1 4 1 1 1 2 1 1
Set up goes on, focusing,
19h – 22h 1 1 1 1 1 2 1 1
cuing

Day 2
10h – 11h Technical rehearsal 1 1 1 1 1 2 1 1 3
11h – 16h Rehearsal 1 1 1 1 1 2 1 1
16h – 17h Corrections 1 1 1 1 1 2 1 1 3
18.30h Doors opening
19h – Performance 1 1 1 1 1 2 1 1 3

17h - Final set in 1 1 1 1 1 1 1 1 3


Day 3 18.30h Doors opening
19h – Performance 1 1 1 1 1 2 1 1 3
22-02 Strike out, loading 1 6 1 1 1 2 1 1 3

You might also like