You are on page 1of 1

ABU ALI SECURITY SYSTEMS UPGRADE AND FIRE STATION PROJECT

SURVEY REPORT
INSTRUMENT:
LOCATION: Fire Water Line P1, P2 & P2 Sand Bedding
Refrence Point/ Benchm ark
BM-No Easting Northing Elevation
Bench Mark Location: Near Adminstration Buildation
3617-10 368648.447 3020705.16 1.833
Design Coordinates Actual Coordinates Difference Coordinates Difference in
ITEM NO Design Actual Remarks
Easting Northing Easting Northing Easting Northing Elevation Elevation Eelevation
1 368526.374 3020715.000 368526.375 3020715.012 0.001 0.012 0.4 0.3977 0.0023 P1
2 368618.565 3020686.180 368618.567 3020686.157 0.002 -0.023 0.4 0.3919 0.0081 P2

Surv eyor Civ il Engineer QC-Civ il


Name Name Name
Sign Sign Sign
Date Date Date