PROFILE: More than 20 years of experience in Architecture,


Consultancy, Quantity Surveying,
Project Coordination,
Construction Supervision and Project Planning

Extensive Experience in Architectural Design through all stages, from


concept to execution

Extensive Experience in Project Tendering

Extensive Experience in Quantity Surveying

Expertise in Site Management & Strategic Planning

Excellent presentation skills utilizing photoshop

Trade/Cross-over skills in Structural Design and MEP

BS ARCHITECTURE – Polytechnic University of the Philippines, Manila


(1992)

POSITION APPLIED FOR: SENIOR QUANTITY SURVEYOR

ARCHITECTURAL DESIGN
SPECIALIZATION: QUANTITY SURVEYING & PROJECT TENDERING
PROJECT COST CONTROL
PROJECT COORDINATOR

AUTOCAD
SOFTWARE SKILLS: ADOBE PHOTOSHOP
MS PROJECT
MS OFFICE
ADOBE ACROBAT PROP
SKETCHUP 7

DATE OF BIRTH: 07 JUNE 1970 AGE: 45

NATIONALITY: FILIPINO RELIGION: CATHOLIC

CIVIL STATUS: MARRIED

NO OF CHILDREN / AGE 3-SONS / AGE-17, AGE-15 AND AGE-12


EDUCATIONAL ATTAINMENT:
PERIOD OF
NAME & ADDRESS OF EDUCATION SCHOOL EDUCATION CERTIFICATE OBTAINED &
SPECIALIZATION
FROM TO

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES BACHELOR OF SCIENCE IN


1987 1992
Sta. Mesa, Manila, Philippines ARCHITECTURE

JOSE ABAD SANTOS HIGH SCHOOL


1983 1987 SECONDARY EDUCATION
Binondo, Manila, Philippines

ISABELO DELOS REYES ELEMENTARY SCHOOL


1977 1983 PRIMARY EDUCATION
Morga Street, Tondo, Manila, Philippines

SPECIAL TRAININGS & SEMINARS:


NAME & ADDRESS OF TRAINING PERIOD OF TRAINING
COURSES ATTENDED
INSTITUTION
FROM TO

GALAXY COMPUTER EDUCATION


101 Bin Saqar Tower, Najda St., November 2008 December 2008 MICROSOFT PROJECT
Abu Dhabi, UAE 2007
OCCI-Organizational Change Consultant
International., NORFIL Foundation September 9, September 10, FOUNDATION OF
No.16 Mother Ignacia St., 2003 2003 LEADERSHIP EXCELLENCE
Quezon City, Philippines

R-II BUILDERS INC.,


November 16, COMPUTER AIDED
Diliman Quezon City, Philippines August 27, 2002
2002 PROJECT MANAGEMENT

CMDF
CONSTRUCTION PROJECT
Makati City, Philippines August 24, 2000 August 25, 2000
COST MANAGEMENT

U.A.E. WORK EXPERIENCES:


NAME OF EMPLOYER JOB TITLE: PERIOD

FORESIGHT
Engineering Consultancy & Town Planning SENIOR QUANTITY SURVEYOR Nov 2013 Aug 2015
Ajman, UAE

TYPE OF BUSINESS: CONSULTANCY - TOWN PLANNING - PROJECT MANAGEMENT


DUTIES AND RESPONSIBILITIES: PREPARED PROJECT PACKAGE FOR TENDERING
SUCH AS:
1. Detailed Quantification and costing for Architectural & Civil
Works
2. Closed Coordination with Specialized Sub-Contractors for
their submission of Quantities and Cost, and put this
information
on in-house format for tendering.
3. Cross Checked and Validated the Project Development
Cost, if it is within the Owners Project Budget and
submitted it to the Project Manager.
4. Coordination in the preparation of specifications, contract
drawings and other necessary contract documents.
5. Final checking against the checklist of the Project For
Tendering prior to the submission to the Team in-charge of
the Tendering.

NAME OF EMPLOYER JOB TITLE: PERIOD

AL WASL AL JADEED CONSULTANTS


ARCHITECTS-ENGINEERS-PLANNERS LEAD ARCHITECT May 2011 Jan 2013
Bur Dubai, UAE

TYPE OF BUSINESS: ENGINEERING CONSULTANCY and TOWN PLANNING

DUTIES AND RESPONSIBILITIES: ASSIGNED FULL TIME AT THE PROJECT SITE OF


SEAVIEW 5-STAR HOTEL & RESORT
Palm Jumeirah, Dubai, UAE

Worked in closed coordination with the Construction Manager in the


Full Implementation of the Project Construction such as;
1. Checked, Evaluated and replied to RFI’s
2. Checked and Evaluated Shop Drawings
3. Checked and coordinated with the Architects the Request
for Inspections
4. Replied to all emails from other disciplines
5. Attended Project Meetings together with the CM
6. Prepared and regularly update project reports
7. Get earliest approval from all other consultant if there is
changes
In the design.

NAME OF EMPLOYER JOB TITLE: PERIOD

PAUL DEVYLDER ARCHITECTS


SENIOR ARCHITECT July 2010 Mar 2011
Dubai, UAE

TYPE OF BUSINESS: CONSULTANCY - TOWN PLANNING - PROJECT MANAGEMENT


DUTIES AND RESPONSIBILITIES: 1. Developed / executed the design prepared by the Design
Manager
2. Prepared Project Design Presentation using Photoshop for
client presentations.
3. Prepared initial project cost estimates to validated project
budget
4. Prepared initial project duration using MS Project

NAME OF EMPLOYER JOB TITLE: PERIOD

CONCEPT ARCHITECTURE & PLANNING


SENIOR ARCHITECT May 2007 Mar 2010
Abu Dhabi, UAE

TYPE OF BUSINESS: CONSULTANCY - TOWN PLANNING - PROJECT MANAGEMENT

DUTIES AND RESPONSIBILITIES: 1. Developed / executed the design prepared by the Design
Manager
2. Perform design coordination, checking and drafting.
Analysis and integration of engineering designs. (exp
Structural and MEP)
3. Prepared Project Design Presentation using Photoshop for
client presentations.
4. Prepared initial project cost estimates to validated project
budget
5. Prepared initial project duration using MS Project
6. Dedication and full support the team during project
development and design presentation during design
competition
7. Prepared Architectural Design Detailing.

NAME OF EMPLOYER JOB TITLE: PERIOD

PARIS GROUP INTERNATIONAL LLC


ARCHITECTURAL DESIGNER Apr 2006 May 2007
Dubai, UAE

TYPE OF BUSINESS: RETAILING

DUTIES AND RESPONSIBILITIES: ASSIGNED AS FULL TIME IN-HOUSE ARCHITECTURAL


DESIGNER
UAE MALL OUTLETS

Worked in closed coordination with the Project Manager in the Full


Preparation of Outlet Designs & Construction such as;
1. Headed the preparation of the outlet design and materials
board for Mall Approval.
2. Supervised the full preparation detailed drawings of the
approved design for permitting and constructions.
3. Prepared all necessary documents for the acquisition of
Mall Permit
4. Regularly updated Outlet Design Approval and Monitoring
reports.
PHILIPPINE MAJOR WORK EXPERIENCES:
NAME OF EMPLOYER JOB TITLE: PERIOD

R-II BUILDERS, INC


TECHNICAL ARCHITECT Oct 1996 Feb 2006
Quezon City, Philippines

TYPE OF BUSINESS: TRIPLE-A, LARGE-B GENERAL CONTRACTOR

DUTIES AND RESPONSIBILITIES: During my Project Posting I worked in closed coordination with the
Project Manager in the Full Implementation of the Project
Construction such as;
1. Prepared Project Interim Payment
2. Prepared and Monitored Project Development Cost
3. Regularly updated and reminded Site Engineers for their
construction targets.
4. In closed coordination with Site Engineers for the
preparation and getting approval of necessary documents
for variations orders.
5. Keeping of project construction records and update it all the
time
6. Attended Project Meetings with the PM and Site Engineers
7. Checked and Evaluated sub-contractor claims.
8. Prepared sub-contractor agreement
9. Assisted and keep records of the survey team.

MAJOR PROJECT HANDLED: ASSIGNED FULL TIME AT THE PROJECT SITE FOR
REHABILITATION OF SURIGAO-DAVAO COASTAL ROAD
CWU-RU-1.4A
Jct. Bacuag-Claver Section (Surigao Del Norte)
The project involve the Concreting of 44KM roadway that
includes earthworks, drainage system, reshaping of mountains
being affected, blasting of hard rocks, construction of box culverts
and other miscellaneous structures

ASSIGNED FULL TIME AT THE PROJECT SITE FOR


REHABILITATION OF SURIGAO-DAVAO COASTAL ROAD
CWU-RU-1.4C
Manay-Mati Section (Davao Oriental)
The project involve the Concreting of 44KM roadway that
includes earthworks, drainage system, reshaping of mountains
being affected, blasting of hard rocks, construction of box culverts
and other miscellaneous structures

ASSIGNED FULL TIME AT THE PROJECT SITE FOR


CONSTRUCTION OF DIKE & EVACUATION ROADS
Bacolor Pampanga, Philippines
The project involve the Construction of 100M Bridge,
Construction of 29.10KM Protection Dike and Concreting of 31KM
Evacuation Road
DUTIES AND RESPONSIBILITIES: ASSIGNED FULL TIME AT THE PROJECT SITE FOR
Continuation: CONSTRUCTION OF PHILIPPINE ARMY 200 BEDS HOSPITAL
Bicutan, Philippines
The project involve the Construction of 6-Storey Combined
Steel and Concrete Hospital.

ASSIGNED FULL TIME AT THE PROJECT SITE FOR


CONSTRUCTION OF MEDIUM RISE PHILIPPINE ARMY
HOUSING
Upper Bicutan, Philippines
The project involve the Construction of 28 Units of Medium
Rise Housing for Philippine Army.

DUTIES AND RESPONSIBILITIES: ASSIGNED FULL TIME AT THE ENGINEERING DEPARTMENT


AS
SENIOR QUANTITY SURVEYOR
R-II Builder’s Inc. main office
Worked with the team and with the Office Manager for
acquiring projects through bidding such as;
1. Value Engineering the acquired construction documents
2. Attended pre-bid conferences and site inspection
3. Familiarized FIDIC
4. Prepared Detailed Quantifications and Costing of the
Project
5. Assisted and helped in the preparation of other necessary
bid documents
6. Closed coordination with the Purchasing Manager for the
costing
Of Construction Materials and getting quotations for the
specialized items.
7. Coordinated with the team in the checking of prepared bid
against the bid checklist prior to mass printing.
8. Stationed at the office, waiting and support the submitting
team until bid is accepted

NAME OF EMPLOYER JOB TITLE: PERIOD

WELLINGTON P.ONG
Architects and Associates ARCHITECT-IN-CHARGE Oct 1993 Oct 1996
Samson Road, Philippines

TYPE OF BUSINESS: CONSULTANCY AND CONSTRUCTIONS


DUTIES AND RESPONSIBILITIES: ASSIGNED FULL TIME AT THE ARCHITECTURAL
DEPARTMENT AS
TECHNICAL ARCHITECT CUM ESTIMATOR
WPO main office
Worked with the Design Manager for Design Development of
the Project such as;
1. Developed the Design given by the Design Manager
2. Supervised and assisted in the preparation of Architectural
Detailing and Construction Drawings
3. Prepared Needed Contract Documents
4. Coordinated and attended meetings with other consultants
5. Assisted in the preparations and filling up of necessary
forms for the application of permits.
6. Periodic Site Visits and Prepared Project Reports
7. Prepared Project Cost and Project Duration Timeline

ASSIGNED FULL TIME AT THE PROJECT SITE OF


6-STOREY with PENTHOUSE RESIDENTIAL/COMMERCIAL
BUILDING
Jose Abad Santos, Philippines

Worked as the PROJECT-IN-CHARGE and handled the following;


1. Responsible for the Overall On-time Delivery of the Project
2. Oversees the Project Construction
3. Read, Monitored and Safeguard the timely execution of
project activity
4. Closed coordination with the Operations Manager and the
Owner
as to budget and expenditures.

NAME OF EMPLOYER JOB TITLE: PERIOD

BC CONSTRUCTION
QUANTITY SURVEYOR Jul 1991 Oct 1993
Monumento, Philippines

TYPE OF BUSINESS: GENERAL CONTRACTOR

DUTIES AND RESPONSIBILITIES: 1. Value Engineering the acquired construction documents


2. Attended pre-bid conferences and site inspection
3. Familiarized FIDIC
4. Prepared Detailed Quantifications and Costing of the
Project
5. Assisted and helped in the preparation of other necessary
bid documents