You are on page 1of 3

CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR

DEVELOPMENT OF ECONOMIC CORRIDORS, INTER CORRIDORS, FINAL INCEPTION


FEEDER ROUTES AND COASTAL ROADS TO IMPROVE THE
REPORT
EFFICIENCY OF FREIGHT MOVEMENT IN INDIA – TELANGANA –
PACKAGE I - (JADCHERLA – DEOSUGUR)

Table of Contents
E.0 Executive Summary
E.1 General E- i
E.2 Site Appreciation E- i
E.3 Methodology E- ii
E.4 Work Plan E- ii
E.5 Design Standards E- ii
E.6 Deliverables E- ii
E.7 Development Plans by Local Bodies E- ii
E.8 Proposed Bypasses and Alignment E- iii
E.8 Conclusions and Recommendations E- iii

1.0 Introduction
1.1 General 1- 1
1.2 Location of the Project 1- 1
1.3 Intent of this Report 1- 3
1.4 Objective 1- 3
1.5 Scope 1- 4
1.6 Approach 1- 5
1.7 Time Frame 1- 6
1.8 Authorized Signatory 1- 6

2.0 Site Appreciation


2.1 General 2- 1
2.2 Terrain 2- 2
2.3 Abutting Land- Use 2- 2
2.4 Intersections 2- 3
2.5 Cross Drainage Works 2- 3
2.6 Railway Level Crossing/ RUB/ ROB 2- 5
2.7 Built-Up Locations 2- 6
2.8 Existing Geometrics 2- 7
2.9 Carriage Way 2- 7
2.10 Existing Pavement Condition 2- 8
2.11 Right Of Way 2- 9
2.12 Forest 2- 9
2.13 Scheme of Widening 2- 9
2.14 Additional Land Acquisition 2- 10
2.15 Technical Assessment of Existing Road 2- 10
2.16 Site Photographs 2- 11

3.0 Methodology
3.1 General 3- 1
3.2 Surveys and Investigation 3- 2
3.3 Subgrade Investigation 3- 11

AA/HIG/2067 TOC - i
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR
DEVELOPMENT OF ECONOMIC CORRIDORS, INTER CORRIDORS, FINAL INCEPTION
FEEDER ROUTES AND COASTAL ROADS TO IMPROVE THE
REPORT
EFFICIENCY OF FREIGHT MOVEMENT IN INDIA – TELANGANA –
PACKAGE I - (JADCHERLA – DEOSUGUR)

Table of Contents
3.4 Material Investigation 3 - 12
3.5 Sub-Soil Investigation 3 - 13
3.6 Topographic Surveys 3 - 15
3.7 Environmental Impact Assessment 3 - 16
3.8 Social Impact Assessment 3 - 19
3.9 Estimation of Quantities and Project Cost 3 - 21
3.10 Economic Analysis 3 - 21
3.11 Financial Analysis 3 - 22

4.0 Work Plan


4.1 Activities and Time Lines 4 - 1
4.2 Work Plan 4 - 2
4.3 Activity schedule 4 - 5
4.4 Manning Schedule 4 - 5
4.5 Task Assignments 4 - 9

5.0 Design Standards


5.1 General 5 - 1
5.2 Geometric Design 5 - 4
5.3 Vertical Alignment 5 - 5
5.4 Service Roads 5 - 6
5.5 Embankment Design 5 - 7
5.6 Pavement Design 5 - 8
5.7 Drainage Design 5 - 10
5.8 Design of Structures 5 - 11
5.9 Traffic Control Devices 5 - 12
5.10 Toll Plazas 5 - 13
5.11 Safety Barrier 5 - 13
5.12 Project Facilities 5 - 13
5.13 Environmental Impact and Assessment 5 - 14
5.14 Social Impact Assessment 5 - 14
5.15 Estimation of Quantities and Project cost 5 - 14
5.16 Standards for At-Grade Intersections 5 - 14
5.17 Project Specific Modifications From Standards 5 - 14

6.0 Deliverables
6.1 Deliverables 6- 1
7.0 Development Plans by Local Bodies
7.1 Local Body Development 7- 1
7.2 State Body Developments 7- 2
8.0 Proposed Bypasses & Alignment
8.1 Bypasses 8- 2
8.2 Realignment /Geometrical improvement 8- 8
9.0 Conclusions and Recommendations

AA/HIG/2067 TOC - ii
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR
DEVELOPMENT OF ECONOMIC CORRIDORS, INTER CORRIDORS, FINAL INCEPTION
FEEDER ROUTES AND COASTAL ROADS TO IMPROVE THE
REPORT
EFFICIENCY OF FREIGHT MOVEMENT IN INDIA – TELANGANA –
PACKAGE I - (JADCHERLA – DEOSUGUR)

Table of Contents
Linear Plan

Index Map

Key Plan

AA/HIG/2067 TOC - iii

You might also like