CARPENTRY 10 - LeaP - LESSON 4
CARPENTRY 10 - LeaP - LESSON 4
__________ Place the platform and secure connectors using claw hammer
__________ Secure connectors of cross brace A on the first and second frame
using wrenches or pliers
__________ Lift the first frame and attach the upper and lower ends of the
cross-brace A
__________ On the second frame attach the upper and lower end of cross
braces A and B
__________ Check levelness of the plat form using spirit level
__________ Secure connectors of cross brace B on the first frame and second
frame
__________ While holding the first frame attach the upper and lower ends of
cross brace B
__________ Check levelness of the frame using plumb bob
Step 3 Install platform C on side braces B so that the platform is fully seated
within inner channel on top of side braces.
Suggested
IV. LEARNING PHASES Learning Activities
Timeframe
Step 5 Install 4 castors D into legs of frame A and pin with lock pins E.
Step 7 While standing on the first platform, insert third frame A into the top of
the first mobile scaffold frame. Then insert fourth frame A into the top of the
first mobile scaffold frame.
Step 8 Attach second side brace B to two frames A, ensuring the L-shaped
lock pin is engaged and attached to the end of the side brace.
Repeat on the other side.
B. Development
Pagpapaunlad When procedures are followed properly, the quality of performed jobs are
assured and its safety. Assembling metal scaffolding components is relatively
easy and simple but is still considered hazardous when not properly
accomplished.
D. Assimilation Fifth Day Performance Task 2: Recall the procedures in assembling metal scaffolding.
Paglalapat 1 hour Identify as to what order are the following steps that are shown and describe
each in 2 – 3 sentences.
Procedure #___________
Suggested
IV. LEARNING PHASES Learning Activities
Timeframe
Procedure #___________
Procedure #___________
Procedure #___________
Procedure #___________
Procedure #___________
Procedure #___________
Suggested
IV. LEARNING PHASES Learning Activities
Timeframe
V. ASSESSMENT Week 5 Performance Task 3: Identify the following procedures according to its
(Learning Activity Sheets for First Day sequence of performance. Write the letter of the best answer.
Enrichment, Remediation or
Assessment to be given on Weeks
1 hour
3 and 6) 1. After installing all side braces of the metal scaffolding, what is the next step?
A. Attach side brace B to two frames A
B. Install 4 outriggers into the legs of bottom frame.
C. Rotate the platform clips into the engaged position.
D. Install 4 outriggers into the legs of bottom frame