SUMMARY OF ACTIVITY:
Do the report for monthly and quarterly of Project HSE Assessment Result
Attend the report presentation with HOD.
Attend the ISO 45001 awareness briefing.
Assist the manager in ISO 45001 awareness presentation.
Attend the Emergency Drill committee meeting.
Assist HSE manager to conduct Emergency Drill at main office.
Attend the Induction with HR.
Attend the ACONEX teaching and learning.
Presentation for HSE monthly (August) assessment findings
Update the HSE report.
Attend the presentation about ISO 14001 and ISO 45001 with HOD and HSE officer.
Attend the Emergency Drill rehearsal at section 4 Kulai (Logistic Unit)
Attend the Kursus Keselamatan Diri di Landasan KTMB 038
Site visit at Kluang Railway Station
Took the exam for KTMB 038 valid certification.
Learn to do the environmental report from Environmental Officer
Site visit and collect data from Rain Gauge at section 2 Labis.
Do the documentation for Environmental.
Contact the subcons for the update of rectification on the environmental control
measures.
Attend the HSE committee meeting.
Collected data from rain gauge at Labis Station in section 2.
Site visit at section 2 for the environmental.
Weekly environmental inspection
Assist SHO in crawler crane inspection.
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
EOH Practicum: Log Sheet
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date:
EOH Practicum: Log Sheet
TO BE FILLED BY STUDENT
Date Date
MONTH: SEPTEMBER 01/09/2022 30/09/2022
From: To:
SUMMARY OF ACTIVITY:
Do the documentation regarding environmental issues.
Weekly environmental inspection at section 1 & section 2
Meeting with Environmental Manager
Collect rain gauge data at section 1 & section 2.
Completing the EIA 1-18 document for environment
Attended the client monthly audit at section 1 & section 2.
Attended the HSE Assessment for section 1 with HSE Manager
Do the rectification for environmental observation report issued by the consultant.
Site walk and observing the crane lifting heavy machinery.
Attended the HSE Department Meeting.
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date:
EOH Practicum: Log Sheet
TO BE FILLED BY STUDENT
Date Date
MONTH: OCTOBER 01/10/2022 31/10/2022
From: To:
SUMMARY OF ACTIVITY:
Do the documentation regarding the environment issues.
Weekly environment inspection at section 1 & section 2.
Collect rain gauge data at section 1 & section 2.
Completing the EIA document for environment.
Do the rectification for environmental observation report.
Site walked.
Cleaning the wash trough
Assist EO in the DOE third party Audit Section 1&2.
Joined the HSE assessment in Section 2.
Attended the HSE Department Meeting.
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date:
EOH Practicum: Log Sheet
TO BE FILLED BY STUDENT
Date Date
MONTH: NOVEMBER 01/11/2022 30/11/2022
From: To:
SUMMARY OF ACTIVITY:
Do the documentation regarding the environment issues.
Weekly environment inspection at section 1 & section 2.
Collect rain gauge data at section 1 & section 2.
Completing the EIA document for environment.
Do the rectification for environmental observation report.
Site walked.
Flooding mitigation at section 2
Making video for emergency escape route.
Do the river monitoring test.
Represent section 2 in HSE Committee Meeting
Site inspection at section 2
Gave toolbox briefing.
Machinery inspection
Document inspection
Acting SSS
Assist Environmental Manager for preparation of Prime Minister Hibiscus Award
Documentation.
Join the Prime Minister Hibiscus Award Presentation.
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date:
EOH Practicum: Log Sheet
TO BE FILLED BY STUDENT
Date Date
MONTH: DECEMBER 01/12/2022 31/12/2022
From: To:
SUMMARY OF ACTIVITY:
Assist Managers for documentation.
Preparation for Workshop on HIRARC, EAI and Legal Register
Attended and assist the managers for the workshop as the committee member.
Preparation for SSS Site Diary presentation.
Preparation for 22 million safe manhour event & HSE conference.
Presentation of SSS Site Diary with HOD at DOSH HQ Putrajaya.
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date:
EOH Practicum: Log Sheet
TO BE FILLED BY STUDENT
Date Date
MONTH: JANUARY 02/01/2023 30/01/2023
From: To:
SUMMARY OF ACTIVITY:
Attended the HSE Department Meeting
Attended the HSE Conference committee meeting.
Meeting with KL project team.
Preparation for HSE Conference.
Presentation with HOD.
Assist managers and HOD for documentation.
Site walk with HOD & Director at Johor Data Center project Kulai.
DOSH visit with YTL safety and health personnel at Kluang Main Office.
Site walk with HOD from Section 1- Section 5.
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date:
EOH Practicum: Log Sheet
TO BE FILLED BY STUDENT
Date Date
MONTH: FEBRUARY
From: To:
SUMMARY OF ACTIVITY:
Assist HOD for the documentation and presentation.
Assist the managers for the management of the documentation, presentation and
trainings.
Assist the HOD and Managers for the preparation of HSE Conference event.
Attended the HSE Conference as the event committee.
Site walkabout with the HOD at Section 1 – Section 5 for EDTP project.
Assist to produce the incident investigation report.
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date:
EOH Practicum: Log Sheet
TO BE FILLED BY STUDENT
Date Date
MONTH: MARCH
From: To:
SUMMARY OF ACTIVITY:
Site visit with managers and SHO at flood affected area.
Assist HOD for the documentation and presentation.
Assist the managers for the management of the documentation, presentation and
trainings.
Preparing the internship presentation.
Site walk, site visit and attended the consultant audit for EDTP project.
Internship presentation with Dr. Faridah at Kluang Main Office.
Site visit at Kuala Lumpur project for the ISO documentation.
Attended the ISO Internal Audit training as participant.
Assist the HOD and managers for NCOSH Award 2023.
Attended the HSE Department Meeting.
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date:
EOH Practicum: Log Sheet
TO BE FILLED BY STUDENT
Date Date
MONTH: APRIL
From: To:
SUMMARY OF ACTIVITY:
Assist HOD for the documentation and presentation.
Assist the managers for the management of the documentation, presentation and
trainings.
Site walk and site visit with managers from Section 1 – Section 5 and JDC project.
Assist HOD and Managers to conduct HSE Department Iftar and Raya celebration.
Celebrating 22 million Safe Manhour achievement for the EDTP project at Kluang.
Attended the HSE Department Meeting.
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date:
EOH Practicum: Log Sheet
TO BE FILLED BY STUDENT
Date Date
MONTH: MAY
From: To:
SUMMARY OF ACTIVITY:
Assist the managers for the management of the documentation, presentation and
trainings.
Site walk and site visit at Section 1, Section 2 and JDC project.
Attended the meeting with Master Builders Association Malaysia (MBAM).
Site visit and site walk at Kuala Lumpur project.
Attended the meeting for ISO document.
Conducted COVID-19 mass screening at Kluang Main Office.
Assist HOD for the documentation and presentation.
Attended the ISO Internal Audit training.
Attended the Consultant audit for EDTP project.
HSE study visit at ECRL project (Section 6) Marang with YTL HSE Department team.
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date:
EOH Practicum: Log Sheet
TO BE FILLED BY STUDENT
Date Date
MONTH: JUN
From: To:
SUMMARY OF ACTIVITY:
Attended the ISO Awareness briefing for Johor Data Center project with HOD and
Manager.
Attended the HSE Department Meeting
Do the documentation for ISO 45001:2018 & ISO 14001:2015 certification for JDC
project.
Assist the managers for the management of the documentation, presentation and
trainings.
Conducted COVID-19 mass screening at Kluang Main Office.
Site walk and site visit with managers.
Attended the HSE Committee Meeting for JDC project.
Attended the Hearing Loss Prevention and Audiometry Training.
Attended the ISO Internal Audit training.
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date:
EOH Practicum: Log Sheet
TO BE FILLED BY STUDENT
Date Date
MONTH: JULY
From: To:
SUMMARY OF ACTIVITY:
Completing the internship
TO BE FILLED BY SUPERVISOR
COMMENTS/REMARKS:
PO9: Leadership
……………………………………………….
Signature
Name:
Designation: Stamp/ Company Stamp
Date: