Date: April 4, 2023

REPORT ON NON-CALIBRATED AND CALIBRATED WEIGHING SCALES FOR


ACCURACY AND PRECISION

Location Work Performed: Ungka 1, Pavia, Iloilo

Date Performed: April 3, 2023

Machine Under Test: Weighing Scale

Brand: Not Specified

NON-CALIBRATED CALIBRATED
WEIGHING SCALE WEIGHING SCALE

Accuracy 9.98 kgs 10.01 kgs

Calibration Not Calibrated Calibrated (August 22,


2022), expire (August
22, 2023)

Standard Tolerance +/- 0.5 kg +/-0.05 kg

Based on the Report, the non-calibrated weighing scale provided a reading of 9.98kgs, while the
calibrated weighing scale provided a reading of 10.01 kgs. The standard tolerance for the non-
calibrated weighing scale is +/-0.5kg, meaning that the actual weight of the sample could be
anywhere between 9.48kgs to 10.48kgs. The Standard tolerance for the calibrated weighing scale
is +/-0.5kg, meaning that the actual weight of the sample could be anywhere between 9.96kgs –
10.06kgs.

Therefore, the non-calibrated weighing scale are within the tolerance, which means that they
provide consistent and reliable measurements.

Tested by: Witnessed by:

JOEMARIE B. FRANCISCO ENGR. JUSTINE E. TORREÑA


Laboratory Technician III Resident Engineer

Attested by:

JOHN HERBERT A. MICMIC


Unit Head, Materials Testing
INTERNATIONAL BUILDERS CORP.
2ND Floor TTW Bldg., #58 Avanceña St., Molo, Iloilo City, 5000 Philippines
Tel. No. (63+33) 337-65-68; 338-34-87 to 88 Fax No. (63+33) 336-38-06

GENERAL CONTRACTOR DEVELOPER READY MIX SUPPLIER


CONSTRUCTION SUPPLIER AGGREGATES SUPPLIER LIGHT & HEAVY EQUIPMENT RENTAL

August 25, 2023

CERTIFICATION

This is to certify that PETER JOHN ARAQUIL, is a Dump Truck Driver of


IBC International Builders Corporation from November 2022 to the Present.
He has demonstrated competence and safe handling of all times

This certification is issued to Mr. Araquil for whatever legal purpose it may
serve him best.

JULIUS RAY C. VALEÑA


Transport Assistant Dept. Head
Transport Department