DOCUMENT REVIEW COMMENT SHEET

Comments Sheet Number: OM72-BVN-DCC-CMM-0019

Transmittal Number:
Document Number: OM72-BVN-CT23-FAC-RPT-0003
Reviewed By:
STRUCTURAL BASIS OF ASSESSMENT
Document Tittle: Felix Ajayi
Approved By:
Date: 12-10-2023
B
Submitted By: Return Code:

Item Section / para Comment Contractor Response Client’s Final Position

1 Section 1.4 – 1) “The above water inspection and structural modelling Noted and implemented
Objective of wellhead…….” It is not clear what water inspection is
referred here. Kindly rephrase sentence to make clearer.

2 Section 1.5.1 – On item (2) The acronym BoA was not defined upfront. It should be Noted and implemented
Project defined
Objectives/High Level
Scope
3 Section 1.6.2.2 In - For item (7) the most probable combination of environmental loads Noted and implemented
Place Strength should be applied.

Page 1 of 4
West African Exploration and Production Co. Limited
DOCUMENT REVIEW COMMENT SHEET

Analysis
4 Section 3 – 1) Kindly include the DPR design regulation 1992 in the list of Noted and implemented
Reference references. The only local regulation available
documents 2) For ease of reference, kindly number all documents and
state clearly the versions of the documents used
5 Section 3.4 – Unit Metric units is said to be in use but a combination of metric and Noted and implemented
imperial units appear in the unit table. Align both
6 Section 4.2 Pile Since this is a brownfield assessment, pile penetrations are known Noted and implemented
variables and should be assessed for adequacy “as-is” and not re-
designed. The penetrations used should be stated unambiguously
7 Section 4.3 Bridge The boundary conditions applicable for the bridge analysis is Noted and implemented
missing. Detailed drawings for the bridge connections may not
currently be available but it is expected that this should be captured
on site notes.
8 Section 5.4 Corrosion Corrosion allowance on splash zone needs to be specified in terms Noted and implemented
Allowance of actual wall thickness.
9 Table 5 5: 100-year For extreme analyses, the three conditions (wind wave and current) The details used are as
all-directional are not to be combined at 100-years. They can’t all exist derived from the client
extreme values. concurrently. (100yr vs 1 year for all 3) supplied DNV metocean
criteria. It did not stipulate
the method described in
the comment raised.
However, MPN Metocean
stipulates such. The DNV
metocean criteria were
dominant for this analysis
while that of MPN was
used for information not

Page 2 of 4
West African Exploration and Production Co. Limited
DOCUMENT REVIEW COMMENT SHEET

contained in DNV
especially Fatigue criteria.
Client (Lloyd’s / WAEP) to
advise if MPN data should
be used for entire project.
10 6.4.1 Pile Axial Allowable safety factor per DPR 1992 is 2.0 for all conditions. This Noted and implemented
Capacity is local regulation, and we are bound by it
11 7.1.1 Not-To- NTE is only applicable to pile capacity. The capacity of any platform Noted and implemented
Exceed NTE Deck can always be extended to meet the capacity of the pile system.
Max Operating Loads This is simply because, once installed, the capacity of piles can no
longer be extended but other segments of the platform can. Re-
phrase the section to reflect this.
A sensitivity analysis would have to be done to establish the NTE
(based on the pile system)
12 7.1.3 Uniform Kindly note that carry-down factors are only applicable to global Noted and implemented
(Blanket) Area Loads member assessments. Pile assessments are not to be included
13 General Applicable allowable stress modifiers are missing, please include Noted and implemented

Page 3 of 4
West African Exploration and Production Co. Limited
DOCUMENT REVIEW COMMENT SHEET

DOCUMENT RETURN CODES:

CODE MEANING
A ACCEPTED- Do not resubmit unless document is modified: Operations may proceed.
B ACCEPTED AS NOTED- Revise to incorporate comments & resubmit: Operations may
proceed.
C NOT ACCEPTED- Revise to incorporate comments and resubmit: Operations must not
proceed
D INFORMATION ONLY- No impact on program