West African Exploration and Production Co.

Limited
DOCUMENT REVIEW COMMENT SHEET

Comments Sheet Number: OM72-BVN-DCC-CMM-0018

OM72-BVN-CT23-FAC-RPT-0004- KCDP-A- Transmittal Number:


Document Number: R01
Reviewed By:
TO KCPP-A Link Bridge Inplace Analysis
Document Tittle: Report Felix Ajayi
Approved By:
Date: 12-10-2023
B
Submitted By: Return Code:

Item Section / para Comment Contractor Response Client’s Final Position

1 Section 2 – 1) Kindly include the DPR design regulation 1992 in the list of Noted. To be
Reference references. The only local regulation available implemented in the next
documents 2) For ease of reference, kindly number all documents and update.
state clearly the versions of the documents used
2 Section 5 – Analysis Member group table is missing. Table should display the original Noted. To be
Model sizes of tubular members and the reduced size for corrosion implemented in the next
simulation update.

3 Section 6.1 Basic 1) What is the difference between load cases 4 and 5.? There Noted. To be
load cases seem not to be any considering the application and load implemented in the next
values. update.

Page 1 of 3
West African Exploration and Production Co. Limited
DOCUMENT REVIEW COMMENT SHEET

2) Include in table 6.1, the load factors (as in table 6.3),


factored values and gravity load summation (which must
align with LC 100
The basis of load cases needs to be discussed. Especially LC 8.
State clearly the assumptions built into arriving at the unit loads.
4 Section 7.2 – Joint 3) Joint UCs appears to be very high. Are allowable stress Yes, allowable modifiers
UC modifiers applied? And proper offsets done? Kindly check were applied. Offsets
done. The analysis will be
rechecked.
5 General The analysis is satisfactory but the comments need to be Noted.
incorporated to proceed

Page 2 of 3
West African Exploration and Production Co. Limited
DOCUMENT REVIEW COMMENT SHEET

DOCUMENT RETURN CODES:

CODE MEANING
A ACCEPTED- Do not resubmit unless document is modified: Operations may proceed.
B ACCEPTED AS NOTED- Revise to incorporate comments & resubmit: Operations may
proceed.
C NOT ACCEPTED- Revise to incorporate comments and resubmit: Operations must not
proceed
D INFORMATION ONLY- No impact on program