TRANSMITTAL

AFCONS Infrastructure Limited, PK-50, RN-1,


Akame Ngue, Meyang, Ntoum, Gabon
02-11-2021
TRANSMITTAL NO: AIL-ICO-T-5267-00272 (Revised) DATE:
12-11-2021
To: Societe Autoroutiere du Gabon

Sending Document Review Form Drawings Documents Others

Sr.No. AFC Document Number Document Title Revision Code (A/B) Remarks

Title Modified and


Submission of Capping layer Top Material
1 OTH-AFC-5267-0024
Test Results (GNT - 2 (0/31.5) - R0
0 A Resubmitted through
same Transmittal No

CODE Implications
A: For Approval

B: For Review and Comments

C: Information or Reference

Sujit Kumar Jha


Project Manager
AFCONS
1

Size QTY Document Status


A0
A1
A2 FOR APPROVAL
A3
A4
Total

0 12-11-2021 Issued for Approval RJS RJS

0 02-11-2021 Issued for Approval (Submission withdrawn) RJS RJS


Rev Issue Date DESCRIPTION PREP’D CHECKED

REHABILITATION AND UPGRADATION OF 2 LANE


PROJECT TITLE:
NATIONAL HIGHWAY ROAD (RN1) FROM PK 24+000 TO PK 105+000

EMPLOYER: SOCIETE AUTOROUTIERE DU GABON

EPC CONTRACTOR: AFCONS INFRASTRUCTURE LIMITED

CONTRACTOR
INDEPENDENT CONSULTING ENGINEERING GROUP
CONTROL OFFICER:
Subject Title: Capping layer Top Material Test Results (GNT - 2 (0/31.5) - R0

AFCONS DOC NO. OTH-AFC-5267-0024 REV – 0 1/


Revision List
Rev Date Description Remarks
Approved by CICO But
0 02-11-2021 Issued for Approval (submission with drawn) Submission with
drawn due the title
modification.

0 12-11-2021 Issued for Approval Title Modified and


resubmitted the
same revision with
the same transmittal

Capping layer Top Material Test Results JOB NO. 5267


(GNT - 2 (0/31.5) - R0
Doc NO. – OTH-AFC-5267-0024 REV.0
INDEX

01. Capping layer Top Material Test Results (GNT - 2 (0/31.5) - R0…………………………….

Capping layer Top Material Test Results JOB NO. 5267


(GNT - 2 (0/31.5) - R0
Doc NO. – OTH-AFC-5267-0024 REV.0
0 12-12-2021

0 02-11-2021
CAPPING LAYER TOP MATERIAL TEST RESULTS (GNT - 2 (0/31.5)
SUMMARY OF CAPPING LAYER TOP MATERIAL (GNT - 2 (0/31.5)