Professional Documents
Culture Documents
d Adopted = 350 mm
r = a/d = 0.071 SAFE
Overall Depth D 420 ≈ 560 mm
k 𝑘=𝐹_𝑣∕ 〖 0.88𝑓_𝑐𝑘= 0.0032
Determination of lever arm 𝑏𝑑 〗
(𝑧∕𝑑)^2−(□(64&𝑟/(𝑟+𝑘)))(𝑧∕𝑑)+(□(64&𝑘/
(𝑟+𝑘))) (𝑎∕𝑑)^2=0
(z/d)2 -0.957 (z/d) + 0.0002 = 0
z/d 0.956 & 0.0002
Lever Aram distance z 334.70 mm
𝑥=2.22𝑑(1−□(64
x = Height of Compression Concrete at&𝑧/𝑑))
the root of Corbel 33.963 mm
x/d = 0.097 < 0.46 Limiting x/d
Nominal Steel is Required in Compression Zone
Ft = Tensin in Horizontal Direction due to Fv
Minimum Ft = 20 kN
Ft = 2.99 kN
Additional Horizontal Force 0 kN
Adopt Ft = 20 kN
Area of Tension Steel Ast
𝜀_𝑠=0.0035(𝑑−𝑥)/𝑥
= 0.0326 Yielding 0.0045
fs is calculated as
Yielding = Fy/1.15 OR = 434.783 N/mm2
From Graph of SP16 Fig 3
Ast = 46 mm2
Ast Min = 2240 mm2