ARE YOU EXPLORING

01 POSSIBILITIES WITH
PRE ENGINEERED BUILDINGS?
01-16

W hat is a Pre Enginee red Building?

02 DO YOU WISH TO KNOW ABOUT


PRE ENGINEERED BUILDINGS?
17-26

W hat a re the g rey a reas in a typic al PEB t ran sactio n?


Index

03 WOULD YOU LIKE TO KNOW


MORE ABOUT US?
26-34

The B rand Story

04 EXCITED! LET’S TALK! 35-38


01

Are you
Expl o r i n g
possibilities
with Pre
Engineered
Buildings?
What is a Pre
Engineered Building?

Element Components

Primary Beam, Column & Rafters.

Purlins, Cladding Systems, Mezzanine


Secondary Systems, Crane Systems, Fascias &
Canopies.

Ridge Vents, Turbo Vents, Skylights,


Louvers, Sand Trap Louvers, Sliding
Accessories Doors, Fastners, Self tapping screw,
Sheeting Fasteners & Sealants.

The advantages of PEBs over Conventional Buildings are:

C ont rolled Q uali ty

SCAN TO
KNOW MORE

Page - 02 | Are you exploring possibilities with Pre Engineered Buildings?


SCAN TO
KNOW MORE

Land
The location must be strategic,
you must check the level of the
land in reference to nearest road
level, Soil & Strata, Ground water
level and road network available.

Layout
The layout must be professionally planned,
considering factors such as vehicle
movement, parking area, utility space and
drainage system must be mapped out.

The project schedule must be


translated into a GANTT chart,
Building material inspection must be
Identify the wind corridor, Size done prior to dispatch, place of
must be optimised, Finalise unloading loading materials
machine layout, Load must be pre planned and make
calculations must be done at sure your PEB vendor follows
design stage. You must be best erection practices.
cautious of the factors such as
No. of air exchanges per hour,
heat, light requirement, no. of
openings, expansion plan, etc.

Civil Foundation
Drainage work must be done prior
to the civil foundation work. Don’t

an old civil foundation. Be cautious


of the Soil Bearing Capacity. The
centre line & anchor the bolt plan
shoul be as per GA drawing.

customer to the PEB vendor at the time of handover.

Page - 03 | Are you exploring possibilities with Pre Engineered Buildings?


What can you do

Buildings?

Structu ral Steel

Industrial

Steel Plants Metal Smelters Cement Plants

Page - 04 | Are you exploring possibilities with Pre Engineered Buildings?


Industrial

Chemical Fertilizers Oil & Gas


Plants & Petrochem Structures

Power Plants Airport Terminal


Buildings

Railway Bridges Metro Stations

Page - 05 | Are you exploring possibilities with Pre Engineered Buildings?


Light Gauge Steel Framed Structures

Health care Community Centers Schools


centers

Mass Housing Relief Camps

Labor camps Defense Shelters Auditorium

Page - 06 | Are you exploring possibilities with Pre Engineered Buildings?


High Rise Commercial
Buildings & Residential

Shopping Malls Multiplexes

Storage Solutions
Warehouse

Page - 07 | Are you exploring possibilities with Pre Engineered Buildings?


Pre Engineered Buildings

L Canopy Rigid Frame Lean To

Single Slope Multi Gable

Multi Span

Page - 08 | Are you exploring possibilities with Pre Engineered Buildings?


Ridge Skylights Turbo Vents
Ventilators

Insulation Louvers Sand Trap


Louvers

Primary & Sheeting Fastners Sealants


Secondary
Bolts

Page - 09 | Are you exploring possibilities with Pre Engineered Buildings?


Page - 10/11 | Are you exploring possibilities with Pre Engineered Buildings?
Primary Framing
Members
Primary members are the main steel frames of PEB. The main frames
include columns, rafters, crane beams, mezzanine beams and other
supporting members. The sections are fabricated with High strength steel
plates using the state-of-the-art manufacturing technology.
The application and requirement determines the shape and size of these
members.

Members
Secondary Framing Members are the structural members which carry
loads to the primary framing members. Secondary structural framing
refers to C sections and Z sections, Grits, Eave struts, Wind bracing,
Flange bracing, Base angles, Clips and other miscellaneous structural
parts.

Standing Seam

Systems
Screw Down Sheeting Method:
Roof and wall cladding are formed by cold rolling metal sheet ranging
Screw down
between 0.5 to 0.7mm thick in bending press machine. They are used to
provide shelter and support from wind pressure and live load.

Standing Seam Sheeting method:


It is connected indirectly by forming clips into the seam. Steel roof is
coated with zinc-aluminuim alloy, it is available in two grades with
tensile strength of 345 MPA & 550 MPA.

Page - 12 | Are you exploring possibilities with Pre Engineered Buildings?


Mezzanine Systems
It consists of a steel deck with a varying thickness between 0.5 to 1mm
supported by steel joists, Steel joists acts as a secondary menbers,
connected to main primary beams. Main beams are connected to the
mainframe columns or intermediate column, based on the load & span,
which transfer the load to the foundation.

Crane Systems
Crane systems are required in manufacturing buildings that require

running crane, underhung crane, Monorail Crane and jib Crane. The most
commonly adopted is the top running crane system.

Facias are used for aesthetic appearance. A variety of fascias either


straight or inclined can be provided. They are cantilivered from the main
frame coloumns in the sidewall & from the wind columns on the end wall.

Canopies
Canopies are narrow roof systems that provide various functions such as
a shade to block direct sunlight on the building walls, an extended cover
to protect the buildings against the rain, and a cover at entrances of the
buildings or adjacent to the walls for car parking.

Page - 13 | Are you exploring possibilities with Pre Engineered Buildings?


the estimated cost

???

Bay Spacing

Transpo rtation C ost


In stallation C ost
SCAN TO
KNOW MORE

Page - 14 | Are you exploring possibilities with Pre Engineered Buildings?


Excellent PEB customer?
Regular PEB
Customer Customer

Selects a vendor who provides the cheapest Selects a vendor who understands PEB as a
price. solution, and provides the best quality
without being too expensive.
Only shares the dimensions of the Building
while sharing the requirements. Understands land selection, overall layout,
and ground water drainage & then asks for
Demands low weight structure without being an estimate.
concerned about the stability of the
structure. Demands an optimum structure with seismic
load & wind pressure calculations.
Directly convert steel prices to arrive at the
estimate.
make of steel.
Not too much bothered about the GA
Drawings. Involving himself in understanding the GA
Drawings with the Engineer.
Demands fast erection and doesn't care
about Best Erection Practices. Demands fast erection with Best Erection
Practices.
Ignorant towards handing over facilities.
Ensures to complete formalities & issues
Does not maintain a relationship with the
vendor.
Facilitates strategic relationship with the
vendor.

SCAN TO
KNOW MORE

Page - 15 | Are you exploring possibilities with Pre Engineered Buildings?


a good PEB Vendor?

Observe their Promise Quotient

Page - 16 | Are you exploring possibilities with Pre Engineered Buildings?


17

Do you
about Pre
Engineered
Buildings?
What will ensure that
PEB roofs do not leak?
Leaking roof is the most common problem faced in metal buildings. You must understand the root cause of this
annoying problem. We have learned about these problems through our years of experience in the PEB industry.

Another area very prone to leakes in the roof is the

gets disturbed due to the movement around the

leakages. So it is a wise decision


to consider replacing worn or

keep your building dry.


SCAN TO
Use good quality sealants that KNOW MORE

lasts longer period of time.

We always recommend using

system as it is screw less so there is no chance of


leakage.

-
bonate sheets & turbo ventilators should be
matching with the original roof sheet properly.

fasteners is recommended as after the chamber

red rust and thus there is no leakage due to


rusting of the fasteners.

Page - 18 | Do you know about Pre Engineered Buildings?


Lorem ipsum

What are the grey


areas in a typical
PEB transaction?

SCAN TO
KNOW MORE

Page - 19 | Do you know about Pre Engineered Buildings?


More Rupee Per Rupee
on PEB?

SCAN TO
KNOW MORE

Page - 20 | Do you know about Pre Engineered Buildings?


Is your PEB
Paintworthy?
The quality of the paint used in PEB is perhaps the most ignored factor which results in a lot
of damage. Inorder to avoid being in trap of your PEB vendor, SCAN TO
KNOW MORE

Do they use the right quality of paint?


What micron of paint do they use on your PEB structure?
Is there a heat oven to cure the paint applied?

Page - 21 | Do you know about Pre Engineered Buildings?


The most common

erecting PEB structures


SCAN TO
KNOW MORE

Skipping the Not Creating a Choosing the


Base Plan Wrong Insulation
Building Permits
and Codes
Neglecting the
Necessary
Materials and
Operating Equipment Hiring a Wrong
Without an or
Instruction inexperienced
Manual Builder

MISTAKE METER

Page - 22 | Do you know about Pre Engineered Buildings?


What are the green
building practices of
your PEB vendor?
Pre Engineered Building Teachnique evolving steel as a primary material
has emerged into green & sustainable alternative to conventional
building practices. The key features that makes PEBs Green Buildings are:-

1. Use of steel is optimised as per the structural analysis as a

vendor ensures you an optimum use of steel to prevent wastage


of universal resource.

2. There is comparatively less pollution & waste produced while


construction of a PEB. As all the members are manufactured
in controlled environment as per engineering standards in a

3. Structural Steel used in Pre Engineered Buildings can be

steel to your vendor.

4. The use of electricity is reduced by innovation and


engineering. Your vendor must provide proper ventilation to save
cooling costs and at the same time they must give opening for
entrance of the sunlight in the building. Additionally insulation is

roof & wall systems with galvalume steel coat to provide thermal
insulation & minimise heat transfer.

Page - 23 | Do you know about Pre Engineered Buildings?


Page - 23 | Do you know about Pre Engineered Buildings?
Is your PEB designed

Type of Building

Warehouse

Light manufacturing

Heavy manufacturing
3 to 5

5 to 10

10 to 20
C
SCAN TO
KNOW MORE

Page - 24 | Do you know about Pre Engineered Buildings?


Why should PEB vendor’s

SCAN TO
KNOW MORE

oous
ustotomme
CC Bigger stockyard reduce
Material Handling Cutting
Cutting must be done Shearing
Shearing must be

o
the turnaround cycle of with the cold process
Interdependence of any facilitated for proper

YY
each batch of that ensures the
process on the
molecular stability of the

aatt
production. availability of material
steel.

Automated Shot Blasting Paint Shop


There must be a
Shot blasting as per SA DTM Paint should be
provision of 2 separate
Due to automation 2.5 standards is a must used in a booth, an oven
automated splicing
welding is far superior. for smooth surface and a conveyor roller
machines that
The process becomes system must be there for
guarantees strong joints
with no faults.

Page - 25 | Do you know about Pre Engineered Buildings?


er
e rCC en
e t
n r
t i
r
m n t r i c Tea m

i
r C e

v v
m e

r r
“Coust o

ee
e”

SS
er v i c

r r
o u r S

u u
a t Y

o
Y o
27

ircicTe
Teaamm
vic e
ce
Page - 28 | Would you like to know more about us?
The Brand Story

Philosophy

Personality

Promise

Purpose

Page - 29 | Would you like to know more about us?


TQM* compliance Project
Management standards
Optimized PEB designs to Installed capacity of 4000 that allow us to deliver
save on your cost of MT to never say "No" to "right product" to "right
structure. your demand. person" at "right time".
(*TQM = Total Quality
Management)

Our experience in PEB


structures ensures that we
Our economy of scale will never play with structural
always give you the engineers do not learn at strength for short term
cutting-edge advantage. customer's cost. gains leading to long term
disadvantage to our
clients.

Page - 30 | Would you like to know more about us?


We cherish these Values

Rage

Page - 31 | Would you like to know more about us?


From the
Director’s
Desk

“We see a huge p otential in

- Sa njay Singh

Page - 32 | Would you like to know more about us?


Our Machinery:
Cutting

Drilling

Welding

Bending Painting

Cutting:

Page - 33 | Would you like to know more about us?


Drilling:

Welding:

Page - 34 | Would you like to know more about us?


Bending:

Painting:



Page - 35 | Would you like to know more about us?


Welcome letter

Page - 37 | Would you like to know more about us?


Page - 38 | Would you like to know more about us?
PEB360 Solutions (India) LLP

DESCRIPTION DETAILS

5.
6.
7.
8.
9.

ADDITIONS/
ACCESSORIES

ACCESSORIES

NOTES
Contact Us:
PEB360 Solutions (India) LLP SCAN ME
H.O: PEB 360 Solutions, M-1, Saraf Court, Dhantoli, Nagpur- 440012

Plant: R.R. Industrial Area, Gumthala, Bhandara Road, Nagpur- 441104

www.peb360.com getintouch@peb360.com +919373107780, +919307489608

Follow us on:

You might also like