Professional Documents
Culture Documents
D.6 Irrigation
D.11 Disposal /
Stormwater Stormwater Drains Recharge
Greywater
Disposal /
D.11
Recharge
T.1 Settler
Faeces T.2 Imhoff Tank
Filtration / Disinfection
T.3 ABR
U.4 Pour Flush
T.4 Anaerobic
Toilet S.10 ABR
Blackwater Effluent Filter
U.5 Cistern Flush S.11 Anaerobic T.5 WSP D.6 Irrigation
Toilet Filter
D.9 Fish Pond
Urine Effluent D.10 Plant Pond
D.11 Disposal /
Conventional Recharge
C.6
Gravity Sewer
POST
Flushwater
Pre-Treatment
Cleansing
Water T.16 Co-
Composting D.5 Application
of Sludge
Sludge D.12 Surface
Disposal and
Transfer
C.7 Storage
Station
PRE
Disclaimer: This sanitation system was created using Eawag’s Sanitation System Drawing Tool (Version 1). The user of this tool alone is responsible for the correctness and completeness of this system.
On-Site Sanitation System With Stablitation Pond
D.6 Irrigation
D.11 Disposal /
Stormwater Stormwater Drains Recharge
Disposal /
D.11
Greywater Recharge
T.1 Settler
T.2 Imhoff Tank
Filtration / Disinfection
T.3 ABR
T.4 Anaerobic
Filter
Pre-Treatment
Faeces
Motorized T.5 WSP D.6 Irrigation
U.4 Pour Flush
C.3 Emptying and D.9 Fish Pond
Toilet
Blackwater S.9
S.9 ABR
SepticTank Effluent Transport Effluent D.10 Plant Pond
U.5 Cistern Flush
C.7 Transfer D.11 Disposal /
Toilet
Station Recharge
Urine
POST
PRE
Motorized
C.3 Emptying and
Flushwater Transport T.13 Sedimen-
Sludge
C.7 Transfer tation /
Pre-Treatment
Thickening D.5 Application
Station of Sludge
T.16 Co-
Sludge D.12 Surface
Composting
Anal Disposal and
Cleansing Storage
Water
PRE
D.12 Surface
Disposal and
Storage
Disclaimer: This sanitation system was created using Eawag’s Sanitation System Drawing Tool (Version 1). The user of this tool alone is responsible for the correctness and completeness of this system.