Item No.

Description Qty

PART I FACILITIES FOR THE ENGINEER


PART A FACILITIES FOR THE ENGINEER
A.1.1 Offices and Laboratory for the Engineer
A.1.1(3) Construction of Field Office for the Engineer 1
A.1.4 Photographs
A.a.4(1) Provision of Progress Photographs 120
SUB-TOTAL OF PART A
TOTAL OF PART I
PART II OTHER GENERAL REQUIREMENTS
PART B OTHER GENERAL REQUIREMENTS
B.3 Permits and Clearances 1
B.5 Project Billboard/Signboard 2
B.7(2) Occupational Safety and Health Program 1
B.9 Mobilization/Demobilization 1
SUB-TOTAL OF PART B
TOTAL OF PART I
PART III CIVIL, MECHANICAL, ELECTRICAL AND SANITARY/PLUMBING WORKS
PART A EARTHWORK
801 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
801(6) Removal of Structures and Obstructions (Concrete) 83.62
801(7) Removal of Structures and Obstructions (Steel) 467.1
803 Structural Excavation
801(1)a Structure Excavation (Common Soil) 67.04
804 Embankment
804(1)a Embankment (from Structure Excavation) 92.99
804(1)b Embankment (from Borrow) 56.94
804(4) Grave Fill 78.96
Unit Total Direct Cost Total Mark up 5% VAT Total Indirect Total Cost
% Value Cost

ls 84609.69 20% 16921.94 4230.4845 21152.42 105762.11

ea 720 8% 57.60 36 93.60 813.60


85329.69
85329.69

ls 5000 0% 0.00 250 250.00 5250.00


ea 7035 20% 1407.00 351.75 1758.75 8793.75
ls 440733.52 8% 35258.68 22036.676 57295.36 498028.88
ls 42771.56 0% 0.00 2138.578 2138.58 44910.14
49806.56
49806.56

cu.m. 203983.47
kg 6319.86

cu.m. 32102.1

cu.m. 23397.22
cu.m. 4679.44
cu.m.
Unit Cost

105762.11

813.60

5250.00
8793.75
498028.88
44910.14