1 Job No.:
2 Customer PV Engineering Reference No.:
3 Address Waterloo, ON Proposal No.:
4
Plant Location Date: August 24, 2010 Rev. 2
5
6 Service of Unit: Hot oil heater Item No: E-101
7 Size 17 / 96 in Type BEM Connected in 1 parallel 1 series
8 Surf/unit (eff.) 213.7 ft2 Hor Shells/unit Surf/shell (eff.) 213.7 ft2
1
PERFORMANCE OF ONE UNIT
9
Fluid allocation Shell Side Tube Side
10
Fluid name
11
Fluid quantity, Total lb/h 10443 116667
12
Vapor (In/Out) lb/h 10443 0 0 0
13
Liquid lb/h 0 10443 116667 116667
14
Noncondensable lb/h
15
16
Temperature (In/Out) F 572.59 571.2 380 479.19
17
Dew / Bubble point F 572.59 572.59 578.38 578.38
18
Density (Vap / Liq) lb/ft3 2.625 / / 44.755 / 53.323 / 50.581
19
Viscosity cp 0.0215 / / 0.0953 / 0.3576 / 0.2262
20
Molecular wt, Vap 18.01
21
Molecular wt, NC
22
Specific heat 1.4586 / / 1.1674 / 0.5199 / 0.5641
23
BTU/(lb*F)
Thermal conductivity 0.039 / / 0.301 / 0.079 / 0.071
24
BTU/(ft*h*F)
Latent heat
25
BTU/lb
Pressure psi 1250 1249.96 30 26.86
26
Velocity ft/s 2.93 6.5
27
Pressure drop, allow./calc. psi 13.95 0.05 10 3.14
28
Fouling resist. (min) 0.0005 0.001 0.0012 Ao based
29
ft2*h*F/BTU
Heat exchanged 6273921 BTU/h MTD corrected 140.31 F
30
Transfer rate, Service 209.93 Dirty 209.91 Clean 326.28 BTU/(h*ft2*F)
31 CONSTRUCTION OF ONE SHELL Sketch
32 Shell Side Tube Side T2 S3
33
Design/Vac/Test pressure psi 1400 / FV / 150 / /
34
Design temperature F 650 650
35
Number passes per shell 1 4
36
Corrosion allowance 0.0625 0.0625
37
in
Connections In in 6 / 900 ANSI 1 4 / 300 ANSI
38 Size/rating
T1 S2 S1
Page 1 of 5
NOTES
1- Two (2) rows of impingement rods on a 30 deg layout are to be used for impingement protection 2-
Baffles to have a 1" V notch at the bottom
3- The shell inlet nozzle is to be located on the side
4- Dummy tubes (6) are to be installed in the horizontal pass partition lane.
www.hcheattransfer.com 1-877-542-1214
HC Heat Transfer Solutions Inc.
Page 3 of 5
www.hcheattransfer.com 1-877-542-1214
HEAT EXCHANGER SPECIFICATION SHEET
1 Job No.:
2 Customer PV Engineering Reference No.:
3 Address Waterloo, ON Proposal No.:
4 Plant Location Date: August 24, 2010 Rev. 2
5 Service of Unit: Hot oil heater Item No: E-101
6 Size 17 / 96 in Type BEM Hor Connected in 1 parallel 1 series
7 Surf/Unit(eff) 213.7 ft2 Shells/Unit 1 Surf/Shell(eff) 213.7 ft2
Tubesheet Layout
Tube Layout
Design Codes
ASME Code Sec VIII Div 1
1.00 24 28 TEMA B - chemical service
Drawing Number
CustomerSpecifications
1 Job No.:
2 Customer PV Engineering Reference No.:
3 Address Waterloo, ON Proposal No.:
4 Plant Location Date: August 24, 2010 Rev. 2
5 Service of Unit: Hot oil heater Item No: E-101
6 Size 17 / 96 in Type BEM Hor Connected in 1 parallel 1 series
7 Surf/Unit(eff) 213.7 ft2 Shells/Unit 1 Surf/Shell(eff) 213.7 ft2
Setting Plan
V iews on arrow A
A
3.25 131.125 Overall
T2
11.125 7.125 6.5 81.0
T2 S3
T1
3.25
S 1 S3
T1 S2 S1
S2 16
7.125 19.1875 57.625
Pulling Length 79
2.0 2.0
4.0 4.0
2 Bolts 2 Bolts
Fixed Sliding
Nozzle Data Design Data Units Shell Channel C ustome r : H&C H eat Tr ansfer Solutions
Ref OD W all Standard Notes Design Pressure psi 1399.99 150. Ad dress : Sarnia, ON Aspen Shell & Tube Exchang er
S1 6. 625" 0. 432" 900 ANSI W eld neck Design T emperat ure F 650. 650. Se rvic e of Unit:
S2 3.5" 0. 216" 900 ANSI W eld neck F ull Vacuum Item N o .:E- 101
S3 2. 375" 0. 154" 900 ANSI W eld neck Corrosion Allowance in 0. 0625 0.0625 D ate: Au g 2010 R ev N o.: 1 J ob N o .: Setting Plan
T1 4.5" 0. 237" 300 ANSI W eld neck T est Pressure psi
T2 4.5" 0. 237" 300 ANSI W eld neck Number of Passes 1 4 Design Codes BEM 17 - 96
Radiography ASME Section VIII Div. 1
PWHT T EMA B
Internal Volume ft³ 12. 5125 4.4291 Drawing Number
Customer Specifications
W eight Summary
Empty F looded Bundle Revision Date Dwg. Chk. App.
3709 lb 4554 lb 1198 lb 24/ 08/ 2010