Professional Documents
Culture Documents
June-22
Internal Code Name of Capacity / Last Time Supervisor Control Quality Control
No Maker
No. Equipment Resolution Verivicated
Submission Date to Customer Name Schedule Delivery to Acual Verification
PIC Interval PIC Remark
Operator (Project Name) Verification Factory Date
7 QC‐CP‐204 Caliper (Manual) 150mm/0,05mm Krisbow 22-Mar-2022 11-May-2022 Supervisor Daman 1 bulan 11-Jun-2022
8 QC‐CP‐205 Caliper (Manual) 150mm/0,05mm Krisbow 20-Jan-2022 11-May-2022 Supervisor Chandra 1 bulan 11-Jun-2022
Returned to Factory
Submitted to Operator
Inform Project name