You are on page 1of 1

Two Laning with Paved Shoulder of Gadag to Honnali (km 105.500 to Km 205.290 of SH 57 and Km 215.335 to km 253.713 OF SH 26 ),138.

2 KM In the State
of
Karnataka, india on Hybrid Annuity Basis.
Client KSHIP
EPC Contractor M/S GAWAR CONSTRUCTION LTD
Concessionaire SADHBAV ENGINEERING LIMITED
Independent engineer LEA ASSOCIATES SOUTH ASIA PVT.LTD

Lab Equipment and Calibration Details


at Ch : 161+850 RHS

Internal/Externa
Sl.no Equipment Discription Frequency Calibration Date Due Date Remarks
l Calibration

1 Pouring Cylinder(150MM) Internal 1 Month 17-Sep-21 16-Oct-21


2 Pouring Cylinder(200MM) Internal 1 Month 17-Sep-21 16-Oct-21
3 RMM Calibration Internal 3 Months 21-Sep-21 20-Dec-21
4 Containers Empty Weight(Big Size) Internal 6 Months 19-Sep-21 17-Mar-22
Containers Empty Weight(Big Size)
Internal 6 Months 19-Sep-21 17-Mar-22
CBR
Small Container Empty Weight Internal 6 Months 19-Sep-21 17-Mar-22
5 CBR Moulds Empty Weight Internal 6 Months 21-Sep-21 20-Mar-22
6 Rammer Internal 6 Months 18-Sep-21 17-Mar-21
7 Proctor Moulds (2250 CC) Internal 6 Months 18-Sep-21 17-Mar-21
8 Cement Mortar Cube Moulds Internal 6 Months 21-Sep-21 20-Mar-22
9 Concrete Cube Moulds Internal 6 Months 21-Sep-21 20-Mar-22

For EPC / Concessionaire Independent Engineer