Karnataka State Highways Improvement Project - III

Two Laning with Paved Shoulder of Gadag to Honnali (km 105.500 to Km 205.290 of SH 57 and Km 215.335 to km 253.713 OF SH 26 ),138.2 KM In the State of
Karnataka, india on Hybrid Annuity Basis.
Client Karnataka State Highways Improvement Project (KSHIP)
Independent Engineer LEA Associates South Asia Private Limited
Concessionaire Sadbhav Gadag Highways Private Limited
EPC Contractor M/S. Gawar Construction Ltd.
CONCRETE CORE TEST REPORT (As per IS 516)
Description : RFI NO
Chainage: Date :

Core Strength after applying


Core strength (N/mm2)

Corrected for Core strength


Dia less than 100mm (IS SP
(A=0.11(H/D)+0.78 OR

H/D Ratio factor (Fig-01-IS


Correction Factor for
Cutting & Capping

Dia. Of Core (mm)

Equivelent Cube
Strength (IS 516
Ht. of Core after

Wt.of Core (gm)

(Fig-01-IS 516)

Area (mm2)

24 Cl.16.3.2)
Load (KN)
H/D Ratio

H/D Ratio

Cl.5.6.1)
(mm)

516)

Avg.
Structure Date of
S.No. Date of Testing
Details Casting

B = π*

H/D
H D A C E=(C/B)X1000 F=E*1.08 G=F*A ECS=G*1.25
(D/2)2

Remarks:-

EPC Contractor's Concessionaire's Independent Engineer


Representative Representative Representative