Blasting Confined Space Same as Above plus suffocation, accidents Same as Above
due to reduced vision, failure to escape in Blasting Hood with air supply
emergency Emergency Exit Lighting Torch
to be provided Exhaust fan at
openings
Assigned Personnel at opening for communication
Personnel working inside must take breaks in every 30-45 mins Entries to be
made for personnel entering inside confined space Signage Outside Area -
“Blasting in Progress”
Electric Equipments / Power Failures Fire, Electrocution All equipments visually inspected
All equipments to be maintained well
All cables and connection to be checked regularly To be
used only by trained personnel
Calibration by TPI for compressor 12 Months
Body Contact Lining Material Dermatitis, allergic reactions, Eye Applicator to wear full boiler suits
irritation Safety goggles
Vaseline for eye protection
Safety Gloves
Wash hands and face after application
First Aid Box with Anti allergic creams, Tablets and Eye wash
Lining Material Fumes Asphyxiation, Dizziness, Narcotic Gas Mask with Cartridge - Applicator
Addiction Exhaust Fans in confined areas
Face Mask for all individuals near coating area
Storage Fire, Leakage, Material Shelf Life Regular Inspection of Material and working condition of AC DG
reduced set for AC Container in case of power failure
Care while managing Lining Material Drums Avoid
keeping Hardener close to Component A
Fire Property Damage, Injury to manpower Avoid any hot work involving welding grinding etc near material
Avoid too much heat generating machine new material Signage for -
“Inflammable Material”
Fire Extinguishers to be present at temporary storage of IS as well as working site location