C O L U M N, TIE BEAM/ROOF BEAM S C H E D U L E


SCALE 1 : 20

COLUMN ( C-1 ) TIE-BEAM ( TB-1 ) ROOF BEAM ( RB-1 )


250.00 200.00 200.00
250.00

300.00

300.00

1200.00
MAIN BAR:
6-12mmØ MAIN BAR: MAIN BAR:
TIES: 4-12mmØ 4-12mmØ
10mmØ, 1@50mm, TIES: TIES:
8@75mm,REST@ 150mmTO 10mmØ 10mmØ
CENTER
300.00

SCHEDULE OF FOOTING

1000.00
100.00
DET. OF FOOTING TIE BEAM
1000.00

6-12mmØ
8-16mmØ Column Main Reinforcement
Reinforcement Matting Rebars @10mmØ Lateral Ties
B.W
1500.00

300.00
300.00

DETAIL
TYPICAL DETAIL OF R.C.
DET. OF STAIR ON GRADE DETAIL WALL FOOTINGS COLUMN & FOOTINGS

PRC NO.
OWNER: PROJECT TITLE: SHEET CONTENT SHEET NO.

PTR NO. ENGR. & MRS. ATAZAN PROPOSED 1 STOREY RESIDENTIAL HOUSE FOOTING AND FOUNDATION
DATE ISSUED:
DETAILS 2
CAD BY: PROJECT LOCATION: WALL FOOTING DETAILS
F2
ISSUED AT : TIE-BEAM DETAILS
ENGR.XIMATRIX L. ATAZAN BRGY.TINIWISAN, BUTUAN CITY
CIVIL ENGINEER STAIR DETAILS
TIN NO.