Professional Documents
Culture Documents
BUILT UP RATE
PAINTING WORKS
AZIRAH BINTI ADNAN
PAINTING WORK
• Painting cost depends on the type of surface being painted, the type of paint used
and also how the painting was done. Materials needed for paint work include
undercoat, base coat and finishing coat and other materials such as shellac, putty and
so on. Paint coverage may vary depending on porosity and surface texture painters
painted and skills, the quality of the paint and the like. The tables below show the
amount of emulsion paint needed for an area of 100 square meters of surface.
• The tables below show the amount of oil paint and varnish needed for an area of 100
square meters of surface.
Painter (hour/100m2)
Description
Wood Steel
Cleaning wood 3 -
Plugging wood 3 -
Applying undercoat 8 8