You are on page 1of 3

PENGIRAAN KOS PROJEK

A. KOS BAHAN

BIL BAHAN UKURAN/SAIZ KUANTITI HARGA HARGA (RM)


SEUNIT
(RM)
1 Kayu
2
3

B. KOS UPAH

Bil Pekerja : ____________ orang Tempoh masa: __________ jam

Kadar Upah : RM_____________ sejam

Pengiraan Kos Upah = Bil Pekerja x Tempoh Masa x Kadar Upah

= _________ x ___________ x __________

= RM_____________

C. KOS OVERHED/SAMPINGAN

i. Bil Elektrik = RM____________

ii. Bil Air = RM____________

Jumlah = RM____________

D. KOS PENGELUARAN

Kos Pengeluaran Projek = Kos Bahan + Kos Upah + Kos Overhed

= ____________ + ____________ + ____________

= __________________

E. PENGIRAAN KOS PROJEK UNTUK 100 UNIT

Kos Pengeluaran 100 unit = Kos pengeluaran seunit x 100

= _____________ x 100

= _________________
KEKUATAN DAN KELEMAHAN PRODUK SEDIA ADA

NAMA PRODUK KEKUATAN KELEMAHAN

1. 1.

2. 2.

3. 3.

4.

1. 1.

2. 2.

3. 3.

4.

1. 1.

2. 2.

3. 3.

4.
SENARAI BAHAN PROJEK

BIL NAMA BAHAN UKURAN KUANTITI

You might also like