You are on page 1of 1

Sr.

No Description Unit Qty Rate Amount


A Kitchen Carpentry Work Material Details with
Rates.
1 Shutter Sqft 55.75 550.00 30662.50
(Made With Marine Ply & High gloss finish
sunmica press in machine)

2 Cabinate Sqft 29.19 750.00 21892.50


3 Shelf (Tall Cabinate) Sqft 12.00 300.00 3600.00
4 Accessories (SS Make 304)
i Plain Basket (12 PC) Sqft 100.61 250.00 25152.50
ii PF Culeary (1PC) Sqft 7.56 450.00 3402.00
iii SS Pull Out No 1.00 3000.00 3000.00
5 Hardware
i Telescope Channel 22" (hettich Regular) Nos 6.00 510.00 3060.00
ii Telescope Channel 22" (hettich Regular) Nos 7.00 625.00 4375.00
6 Handels Nos 24.00 450.00 10800.00
7 90^ Hinges soft clossing (Boss) Nos 9.00 400.00 3600.00
8 Hardware (All Hardware Fitting) LS 1050.00 1050.00
9 Hydrulic LS 2.00 750.00 1500.00
10 Installation Charges Sqft 85.00 150.00 12750.00

Total (A) 124844.50


Sr.No Description Unit Qty Rate Amount
B Providing & Fixing Entry Safety door.
1
Door Material Pine Wood & Mate Finish Sunmica & Sqft 21.56 700.00 15092.00
Hardware ( Lock, Hinges,Etc ,.Complete)

C Proving & fixing Wash Basin Fancy Mirror Glass. Nos 2.00 1750.00 3500.00

Total (B+C) 18592.00


Grand Total (A+B+C) 143436.50

You might also like