Car
Industry List District Tracks Capacity
1. Wonder Bread Shipping. Delaware 2
2. Wonder Bread grain spot Delaware 3
3. Strong Bolt Mfg. Inbound Malt's Delaware 2
4. Strong Bolt Shipping Delaware 5
5. Cardboard and box factory Delaware 4
6. Monroe Fruits and Vegetables Monroe 5
7. !7th Street Freight House 17th Street 6
8. Paint and inks 17th Street 4
9. Steel Wholesaler 17th Street 3
10. Cotton Wholesaler Water Street 3
11. Shirt Factory Water Street 3
12. Shirt Factory Power Plant - oil Water Street 1
13. Furniture Builder Water Street 1 3
13. Furniture Builder Water Street 2 3
14. Produce & Meats Water Street 3
15. Horvath Scrap Metal Water Street 2
16. Ruston Coal Retail Delivery Monroe 2
17. Delaware Ave Team Tracks Delaware 1 7
17. Delaware Ave Team Tracks Delaware 2 7
17. Delaware Ave Team Tracks Delaware 3 8
18. Delaware Ave Freight House Delaware 8
19. Delaware Ave Ramp Track Delaware 2
20. !7th Street Public Delivery Track 17th Street 2
Yards
Monroe Yard Monroe 3 22
17th Street Yard 17th Street 1 4
Madison Ave Yard 4 32
y Inventory
How to Use The Delaware Avenue Switch L
Car Types
Boxcar
Boxcar, Covered Hopper All changes and actions occur on the Control Tab. The spread sheet on the Control Tab simu
Gondola, Boxcar to the Control Tab are pasted into the train instructions tabs, which identifies car movemen
combined switch list and instruction packet. Two key Excel instructions are needed to run t
Boxcar moves the data from one cell to another, simulating the movement of a car from one locatio
Boxcar fist cell(s) and pastes it into a second cell(s). For example, you will want to copy an industry
Produce Reefer list. You want the original list of industries to remain unmodified, so you use the copy and p
place, so click & drag simulates this process.
Boxcar
Tank, boxcar
Gondola, Flatcar
Boxcar Step 1:
Boxcar
Oil Tank
Boxcar
Boxcar Step 2:
Meat & produce reefers
Gondola
Coal Hopper Step 3:
Boxcar, Reefers
Boxcar, Reefers
Boxcar, Reefers
Boxcar
Flatcar Step 4:
Boxcar, Reefers
Step 4A:
Step 4B:
Step 4C:
Step 5:
How to Use The Delaware Avenue Switch List Generator (DASLG)
hanges and actions occur on the Control Tab. The spread sheet on the Control Tab simulates the car movements of the various switch job
he Control Tab are pasted into the train instructions tabs, which identifies car movements for each of the switch jobs. The idea is to print o
bined switch list and instruction packet. Two key Excel instructions are needed to run this tool: "click and drag" and "copy and Paste". Cl
es the data from one cell to another, simulating the movement of a car from one location to the next. Copy and Paste makes a copy of th
cell(s) and pastes it into a second cell(s). For example, you will want to copy an industry name from your list of industries, and paste it into
You want the original list of industries to remain unmodified, so you use the copy and paste process. On the other hand, the car moves f
e, so click & drag simulates this process.
"Click and drag" the cars from staging or the extra car bin (off line storage) into the "Set Off" car cells on the BUILT SWITCH LIS
the Control Tab. This builds the outbound train. Now "Copy & Paste" the destination for each car in the switch list from the li
industries. I recommend clicking & dragging the car furthest to the left, since it has been at the industry the longest.
"Click & Drag" cars from the "current car position" into the "Pick up" part of the BUILD SWITCH LIST. Be sure to "Copy and Pas
current location name so the crew will know where to find the car on the layout.
Highlight the cars and locations. then right click on Copy . Then paste the list into the specific train tab you want to create. Y
determine which of those trains you have built, paste into that switch list, and print that tab. Print only that one tab. The sw
be combined with specific instructions for that switch job . This allows the guest crew to fold their print out down the center
switch list on one side and instructions and "Old Hat" tips on the other side.
This is administrative. You now need to re-order the Control Tab to simulate the completion of the previous switch moves
creating another switch list.
On each industry line where a pick up is planed, click and drag all of the industry cars to the left, filling the empty cells for that
from left to right. The idea is to manage the cars as "First In, First Out" (FIFO) manner.
Move the cars (Click and Drag) from the set-out list to each destination industry. Drag the cars to the fist open cell to the righ
already spotted there. This moves the cars off the switch list and into the industry.
Move the cars in the Pick-Up section to one of the lines in the staging yard area of the Control Tab. Any line will do. For exam
train is first out, it will probably be first in, so the inbound track is most logical. I recommend shading these cars until the trai
arrives, preventing the double use of those cars in the next train out.
The BUILD SWITCH LIST area should now be empty. Repeat steps 1-4 to build the next train out. However, you will need to ch
different train (different tab) to print out. Also, don't put cars into this train that have not yet arrived in the staging yard. Tho
still in transit, and should be shaded a different color to help you remember not to use them yet (See step 4c).
Track & Industry Inventory BUILD SWITCH LIST
Yards 10
Monroe Yard
All Tracks
Copy & paste light red area into
appropriate train tab
17th Street Yard
Staging Yard
Madison Ave Yard Track 1
Madison Ave Yard Track 2
Madison Ave Yard Track 3
Madison Ave Yard Track 4 (Inbound)
BUILD SWITCH LIST Cu
1 2 3
SET OFF
TO Box PRR 101882
Box PRR 65734
Box NYC 157831
Box NYC 157134 Box NYC 157099 Box PRR 101914
Box ATSF 12767 Box CB&Q 130399
Reefer FGEX 34822
Box PRR 60840 Box PRR 60799
Box MILW 18556
Gon P&LE 40011
Box NYC 157018 Box CNW 141510
Box NYC 16001
Tank GATX 15420
PICK UP Box N&W 41922
FROM Box PRR 100788 Box PRR 100767
Reefer PFE 50060
Gon PRR 120456
Hopper PRR 186431
Box PRR 100678 Box B&O 380135 Box PRR 51623
Box PRR 100477 Box CNW 141544 Box PRR 51655
Box PRR 100580 Box B&O 380140
Box CNW 117488
Box NP 17033
Yards
Gon ACL 91279 Tank GATX 15409 Box PRR 51642
Box NP 17068 Reefer PFE 55339 Reefer PFE 50031
y & paste light red area into Box B&O 187513 Box NYC 160000
appropriate train tab
Box PRR 51645
Staging Yard
Box ATSF 12999 Box CG 41314 Box NKP 16547
Box NP 17066
Reefer FGEX 34445 Meet Ref ARLX 11234 Meet Ref GATX 3461 Reefer ART 22111
ff Line Storage)
Reefer PFE 26201 Box PRR 67517
Reefer PFE 30509 Box PRR 67528
Box PRR 67529
Reefer PFE 50055 Box PRR 67547
Reefer PFE 50056 Box PRR 67572
Reefer PFE 50076 Box PRR 100696
Box PRR 100800
Box PRR 51621 Box PRR 100885
Box PRR 101600
Box PRR 101912
Box PRR 51652 Hopper PRR 186098
Box PRR 51680 Hopper PRR 188748
Box PRR 60111 Hopper PRR 189977
Box PRR 60112 Reefer SFRD 31330
Box PRR 60345 Reefer SFRD 31408
Box PRR 60873 Tank ULTX 73400
Box PRR 60874 Tank ULTX 73450
Box PRR 61661 Box UP 74241
8
Old Hat: Check your switch list against the actual cars
in your train before departing.
Old Hat Trick: When you are done with Delaware Ave,
use the Subway to run around your train, before getting
to 17th Street. You can't be sure there is an open track
in the 17th Street Yard to do the run around there.
Old Hat: Check your switch list against the actual cars
in your train before departing.
Notes:
Water Street Crawler
Old Hat: Check your switch list against the actual cars
in your train before departing.
When you are done with Delaware Ave, pull cars from
the 17th St Frt. House and the Paint & Ink spur. Also
work the 17th st frt house and the public delivery
track, as needed.