NATIONAL CERTIFICATE
BUILDING SCIENCE N3
(15070023)
This question paper consists of 5 pages, 2 diagram sheets and 1 formula sheet.
3. Number the answers according to the numbering system used in this question
paper.
4. ALL sketches and/or diagrams must be done in pencil. The sketches must be
neat, reasonably large or on the given scale and fully labelled.
5.
Assume that acceleration due to gravity (g) is 9,81 m/s2.
QUESTION 1
1.1 Explain the purpose of each of the following tests when working with concrete
1.2.4 pH (1)
QUESTION 2
2.1.2 The magnitude of the bending moment at a point 2 m from the free
end B (2)
2.2 Draw a fully labelled shear force diagram to a linear scale of 1 cm = 0,5 m
and a force scale of 1 cm = 2kN. (7)
QUESTION 3
QUESTION 4
Graphically determine the force acting in each leg and backstay by using the following
specifications:
QUESTION 5
5.1 A block rests on top of an inclined plane. The weight of the block parallel to
the plane is 20 N. The weight of the block perpendicular to the plane is 80 N.
It is found that a force of 50 N parallel to the plane will just move the block
upwards along the plane at a constant speed.
5.1.2 Coefficient of friction between the block and the plane (3)
QUESTION 6
QUESTION 7
7.1 Draw a neat labelled force diagram next to the question number in the
ANSWER BOOK and graphically determine the magnitude and nature of the
forces acting on the frame shown in FIGURE 4. (9)
Use the following scale: A linear scale of 1cm = 0,5 m and force scale of 1cm =
1kN.
7.2 Reproduce the table below next to the question number in the
ANSWER BOOK and tabulate your findings obtained in question 7.1.
TOTAL: 100
DIAGRAM SHEET 1
UDL 2 kN/m
5m
FIGURE 1
Vo = 220 V
FIGURE 2
FIGURE 3
Copyright reserved Please turn over
(15070023) -2-
-7- T250(E)(N20)T
DIAGRAM SHEET 2
3 kN
2 kN
2m
1 kN
2m 2m 2m
FIGURE 4
FORMULA SHEET
1. 21.
2. 22.
23.
3.
24.
4.
25.
5. Comp. //
26.
6. Comp.
27.
7.
28.
8.
9. 29. ̅
10. 30. ̅
11.
31. √
12.
32.
13.
33. Mass of water in mixture =
14.
15.
water : cement ration × mass of cement
16.
34. Work done by effort in raising the load =
17.
effort × velocity ration (VR) × load
18.
distance
19.
20. =
35. Compacting factor =
mass of partially compacted concrete
mass of fully compacted concrete