CLARIFICATIONS ON THE FOLLOWING:

I. PTS
a. Training Activity Matrix - d ko pa natapos ito. Binago mo na ba? – Not yet, gawin ko po
later
b. Progress Chart - sample yung naka attach ko na file. D ko pa nagawa yun.- Ok will do it ,
the will pass po kasabay nung sa training Matrix

II MTF
a. Housekeeping Schedule – lalagyan ko pa bay un ng laman? Anong date ilalagay? – No
need na po ito I fill out, need lang po ditto is yung mismong contant nung schedule, yung
date po make it “Schedule for the 2nd Semester, 2023”

b. Housekeeping Inspection checklist – is it inspected by a different person or the same as


that who prepared? -

Date: Anong date dapat?

Note: I changed the names of those who prepared by the names on trainees on my
list.- Ok po .
I noticed inconsistencies on dates. Ano ba dapat? – Hindi naman siya naka focus on
the date kung kelan siya na accomplished, maybe the year of accomplishement is
more important po, kaya dapat naka 2023 siya.

III SWBT
a. Training Program Outcomes – Dates again. D ba dapat consistent to the training period?
b. Date of accomplishment on trainees record book- Yung date nito is accurate na yung
bilang based on the nominal ,duration nung training. I assume po kasi that the training
has started on August 28, 2023 and weekdays lang yung pasok.
IV FTS
Need pa gawin ito?- No need na po ito gawin, ang kailangan lang naman po ditto is
yung training evaluation sheet and attendance sheet during training. Pasa ko po ito later after
shift ko po mga around 6 pm po.

Six modules tayo ano? Yung 6th yung utilize electronic media. So dapat 5 modules ang need I
submit? Alin pa ang kulang?- 5 modules lang po tayo, and 4 modules lang po yung need ipasa
or ipa check including the CBLM. Yung CCA and FLS is mostly ipniprintb nalang po ito and
inaatach sa portfolio once done na yung ibang need ipa check