an Maintenance shut down
Company Man Power Respinsible Dept. EQUIEPMENT
ce
No
PAINT SHOP WORK DETAILS
Day
TOTAL
22 TH
FRI MATERIAL
23 TH
SAT GLASS
24 th 25 th HOT WORK PLAN
Name Manager MAN SUN SQ. MON Dept. Manager
Sh (8AM-6PM)
POWER
SHIFTING REMOVE
ut MATERIAL SHIFTING,GLASS
14 OLD GLASS SQ.TUBE RAIL HOUSE
SCAFOLDING,A
GRINDING,CU LADDER,TIG WELD
do RAIL HOUSE REMOVE,CUTTING,SQ.TUBE WELD NOAH RAVI ( 8am-8pm) MAN TOOLS,MATERIAL
SHIFTING
REMOVE,CUTTING
LINE 2 NEW GLASS
WELDING,PAINTING
LINE 1 NEW GLASS
INSTALL,SILICON
APPLY
PAINT SHOP TTING,WELDI M/C,ZIG
NG SAW,GRINDING
DAY INSTALL INSTALL
M/C
wn1
pei SCAFOLDING,A
MS SQ.TUBE
ro STRUCTURE MATERIAL SHIFTING, NOAH RAVI ( 8am-6pm)
10 MAN MATERIAL
DAY SHIFT
TIG WELDING LINE
1
TIG WELDING
LINE 2 CLANING PAINT SHOP
GRINDING,TIG LADDER,TIG WELD
WELDING, M/C,GRINDING
WELD
d M/C
2
TIG TIG FORK LIFT 5 TON ,3
10 MAN MATERIAL GRINDING,LIF
TON&SCISSOR
ROBOT BASE MATERIAL SHIFTING NOAH SIRISH ( 8am-6pm) WELDING WELDING PAINTING PAINT SHOP TING,HEIGHT
DAY SHIFT WORK
LIFT,CRANE 14
LINE 1 LINE 2 TON
3
2
pla
n
of
M
ain
ten DECEMBER SHUTDOWN KIA PAINT SHOP 2023
an
ce Company Man Power
Maintenance shut down
Respinsible Dept.
22 TH 23 TH 24 th 25 th
Sh
No PAINT SHOP WORK DETAILS HOT WORK EQUIEPMENT PLAN
FRI
ut Name Manager Day
(8AM-6PM)
OT
(6 PM-10 PM
TOTAL
MAN MATERIA
L
SAT
GLASS SUN SQ. MON Dept. Manager
POWER SHIFTING REMOVE
do
wn1 RAIL HOUSE
MATERIAL SHIFTING,GLASS
NOAH RAVI ( 8am-5pm) 7 MAN 7 MAN 7 MAN 7 MAN
PAINT SHOP
GRINDING,CUTTI
SCAFOLDING,A LADDER,TIG
WELD M/C,ZIG SAW,GRINDING
REMOVE,CUTTING,SQ.TUBE WELD NG,WELDING
pei
DAY DAY DAY DAY
M/C
ro MS STRUCTURE GRINDING,LIFTIN
FORK LIFT 5 TON ,3
2 MATERIAL SHIFTING, NOAH RAVI ( 8am-6pm) (6:pm-10pm) BODY SHOP ROHIT TON&SCISSOR LIFT,CRANE 14
d WELD G,HEIGHT WORK
TON
STRUCTURE
INSTALLATION
4 PLATFORM SAMI NEW PLATFORM INSTALL NOAH RAVI ( 8am-6pm) (6:pm-10pm) 15 BODY SHOP ROHIT SAMI PLATFORM FORK LIFT 5 TON ,3 TON
INSTALL
0
n
of
M
ain
ten
an Maintenance shut down
Company Man Power Respinsible Dept. EQUIEPMENT
ce
No
PAINT SHOP WORK DETAILS
Day
TOTAL
22 TH
FRI MATERIAL
23 TH
SAT GLASS
24 th 25 th HOT WORK PLAN
Name Manager MAN SUN SQ. MON Dept. Manager
Sh (8AM-6PM)
POWER
SHIFTING REMOVE
ut MATERIAL SHIFTING,GLASS
14 OLD GLASS SQ.TUBE RAIL HOUSE
SCAFOLDING,A
GRINDING,CU LADDER,TIG WELD
do RAIL HOUSE REMOVE,CUTTING,SQ.TUBE WELD NOAH RAVI ( 8am-8pm) MAN TOOLS,MATERIAL
SHIFTING
REMOVE,CUTTING
LINE 2 NEW GLASS
WELDING,PAINTING
LINE 1 NEW GLASS
INSTALL,SILICON
APPLY
PAINT SHOP TTING,WELDI M/C,ZIG
NG SAW,GRINDING
DAY INSTALL INSTALL
M/C
wn1
pei SCAFOLDING,A
MS SQ.TUBE
ro STRUCTURE MATERIAL SHIFTING, NOAH RAVI ( 8am-6pm)
10 MAN MATERIAL
DAY SHIFT
TIG WELDING LINE
1
TIG WELDING
LINE 2 CLANING PAINT SHOP
GRINDING,TIG LADDER,TIG WELD
WELDING, M/C,GRINDING
WELD
d M/C
2
TIG TIG FORK LIFT 5 TON ,3
10 MAN MATERIAL GRINDING,LIF
TON&SCISSOR
ROBOT BASE MATERIAL SHIFTING NOAH SIRISH ( 8am-6pm) WELDING WELDING PAINTING PAINT SHOP TING,HEIGHT
DAY SHIFT WORK
LIFT,CRANE 14
LINE 1 LINE 2 TON
3
2