PAINT SHOP WORK DETAILS
Day
TOTAL
22 TH
FRI MATERIAL
23 TH
SAT GLASS
24 th 25 th HOT WORK PLAN
Name Manager MAN SUN SQ. MON Dept. Manager
Sh (8AM-6PM)
POWER
SHIFTING REMOVE

ut MATERIAL SHIFTING,GLASS
14 OLD GLASS SQ.TUBE RAIL HOUSE
SCAFOLDING,A
GRINDING,CU LADDER,TIG WELD
do RAIL HOUSE REMOVE,CUTTING,SQ.TUBE WELD NOAH RAVI ( 8am-8pm) MAN TOOLS,MATERIAL
SHIFTING
REMOVE,CUTTING
LINE 2 NEW GLASS
WELDING,PAINTING
LINE 1 NEW GLASS
INSTALL,SILICON
APPLY
PAINT SHOP TTING,WELDI M/C,ZIG
NG SAW,GRINDING
DAY INSTALL INSTALL
M/C
wn1
pei SCAFOLDING,A
MS SQ.TUBE
ro STRUCTURE MATERIAL SHIFTING, NOAH RAVI ( 8am-6pm)
10 MAN MATERIAL
DAY SHIFT
TIG WELDING LINE
1
TIG WELDING
LINE 2 CLANING PAINT SHOP
GRINDING,TIG LADDER,TIG WELD
WELDING, M/C,GRINDING
WELD
d M/C

2
TIG TIG FORK LIFT 5 TON ,3
10 MAN MATERIAL GRINDING,LIF
TON&SCISSOR
ROBOT BASE MATERIAL SHIFTING NOAH SIRISH ( 8am-6pm) WELDING WELDING PAINTING PAINT SHOP TING,HEIGHT
DAY SHIFT WORK
LIFT,CRANE 14
LINE 1 LINE 2 TON
3

ALL MATERIAL SHIFTING,CLEANING NOAH SIRISH ( 8am-6pm)


6 MAN MATERIAL
DAY SHIFT
4

2
pla
n
of
M
ain
ten DECEMBER SHUTDOWN KIA PAINT SHOP 2023
an
ce Company Man Power
Maintenance shut down
Respinsible Dept.
22 TH 23 TH 24 th 25 th
Sh
No PAINT SHOP WORK DETAILS HOT WORK EQUIEPMENT PLAN
FRI
ut Name Manager Day
(8AM-6PM)
OT
(6 PM-10 PM
TOTAL
MAN MATERIA
L
SAT
GLASS SUN SQ. MON Dept. Manager
POWER SHIFTING REMOVE
do
wn1 RAIL HOUSE
MATERIAL SHIFTING,GLASS
NOAH RAVI ( 8am-5pm) 7 MAN 7 MAN 7 MAN 7 MAN
PAINT SHOP
GRINDING,CUTTI
SCAFOLDING,A LADDER,TIG
WELD M/C,ZIG SAW,GRINDING
REMOVE,CUTTING,SQ.TUBE WELD NG,WELDING
pei
DAY DAY DAY DAY
M/C

ro MS STRUCTURE GRINDING,LIFTIN
FORK LIFT 5 TON ,3
2 MATERIAL SHIFTING, NOAH RAVI ( 8am-6pm) (6:pm-10pm) BODY SHOP ROHIT TON&SCISSOR LIFT,CRANE 14
d WELD G,HEIGHT WORK
TON

FORK LIFT 5 TON ,3


STRUCTURE GRINDING,LIFTIN
3 DISMANTLE H BEAM STRUCTURE DISMANTLING NOAH RAVI ( 8am-6pm) (6:pm-10pm) 15 BODY SHOP ROHIT G,HEIGHT WORK
TON&SCISSOR LIFT,CRANE 14
TON

STRUCTURE
INSTALLATION
4 PLATFORM SAMI NEW PLATFORM INSTALL NOAH RAVI ( 8am-6pm) (6:pm-10pm) 15 BODY SHOP ROHIT SAMI PLATFORM FORK LIFT 5 TON ,3 TON
INSTALL

PAINTING PAINTING TUCH


5 TUCHUP WORK SAMI NEW PLATFORM INSTALL NOAH RAVI ( 8am-6pm) (6:pm-10pm) 15 BODY SHOP ROHIT UP A LADDER & EQIUPMENT USE

PRESS JIG INSTALLATION


MS PLATFORM FORK LIFT 16 TON,10
1
ASSY
PRESS JIG INSTALL PURPOSE MS PLATFORM ASSY NOAH SIRISH ( 8am-6pm) (6:pm-10pm) 10 BODY SHOP ROHIT LIFTING
TON,CRANE 80 TON

PRESS JIG FORK LIFT 16 TON,10


2
INATALL
PRESS JIG INSTALL NOAH SIRISH ( 8am-6pm) (6:pm-10pm) 10 BODY SHOP ROHIT LIFTING
TON,CRANE 80 TON

MS FENCE INSTALLATION FORK LIFT 5 TON,3 TON,BOOM


3
INSTALL
MS PIPE FENCE INSTALL NOAH SIRISH (8am-6pm) (6pm-10pm) 10 BODY SHOP ROHIT
FENCE LIFTER

FINAL FORK LIFT 5 TON,3 TON,BOOM


4 ALIGHNMENT ALIGHNMENT NOAH SIRISH (8am-6pm) (6pm-10pm) 10 BODY SHOP ROHIT ALIGHNMENT LIFTER

0
n
of
M
ain
ten
an Maintenance shut down
Company Man Power Respinsible Dept. EQUIEPMENT
ce
No
PAINT SHOP WORK DETAILS
Day
TOTAL
22 TH
FRI MATERIAL
23 TH
SAT GLASS
24 th 25 th HOT WORK PLAN
Name Manager MAN SUN SQ. MON Dept. Manager
Sh (8AM-6PM)
POWER
SHIFTING REMOVE

ut MATERIAL SHIFTING,GLASS
14 OLD GLASS SQ.TUBE RAIL HOUSE
SCAFOLDING,A
GRINDING,CU LADDER,TIG WELD
do RAIL HOUSE REMOVE,CUTTING,SQ.TUBE WELD NOAH RAVI ( 8am-8pm) MAN TOOLS,MATERIAL
SHIFTING
REMOVE,CUTTING
LINE 2 NEW GLASS
WELDING,PAINTING
LINE 1 NEW GLASS
INSTALL,SILICON
APPLY
PAINT SHOP TTING,WELDI M/C,ZIG
NG SAW,GRINDING
DAY INSTALL INSTALL
M/C
wn1
pei SCAFOLDING,A
MS SQ.TUBE
ro STRUCTURE MATERIAL SHIFTING, NOAH RAVI ( 8am-6pm)
10 MAN MATERIAL
DAY SHIFT
TIG WELDING LINE
1
TIG WELDING
LINE 2 CLANING PAINT SHOP
GRINDING,TIG LADDER,TIG WELD
WELDING, M/C,GRINDING
WELD
d M/C

2
TIG TIG FORK LIFT 5 TON ,3
10 MAN MATERIAL GRINDING,LIF
TON&SCISSOR
ROBOT BASE MATERIAL SHIFTING NOAH SIRISH ( 8am-6pm) WELDING WELDING PAINTING PAINT SHOP TING,HEIGHT
DAY SHIFT WORK
LIFT,CRANE 14
LINE 1 LINE 2 TON
3

ALL MATERIAL SHIFTING,CLEANING NOAH SIRISH ( 8am-6pm)


6 MAN MATERIAL
DAY SHIFT
4

2
▣ Work Location

AHU (AO#1) new pipe,elecrical work /


SHOP Oven two tone oven ,ED,UBS,TC1,2 Responsible Dept.
NO 1 paint shop CONTENTS paint shop
(Department) welding work / PT line duct leakage arrest (Manager)
work /hanger all checking work .