You are on page 1of 2

Method Statement

ECO TUBES

1. Prepare slope

The slope shall be prepared in accordance to the project specification and


requirement.

The slope surface shall be trimmed free from debris and sharp protruding
objects.

2. Laying

Place the eco-tubes on the slope surface.

CSL soil centralab sdn. bhd.


Method Statement

3. In fill

In fill the tube with soil/sand mixture. At every 1m, make a twist of the tube to
prevent infill settlement at bottom level.

Anchor the tube with J-Pins at 1m center to center to ensure intimate contact
with underlying soil.

Overlap 1m at top of slope.

4. Vegetation

Vegetation can be achieved through following method:-


 Hydroseeding
 Pre-seeded (mixing soil seed fill inside the tube)
 Brush layering
 Live planting

CSL soil centralab sdn. bhd.